• 제목/요약/키워드: Electric Power Equipment

검색결과 792건 처리시간 0.038초

사무소용건물의 변전시설밀도 및 수용률 기준설정에 관한 연구 (A Study on the Design Standard of Substation Facility Density and Demand Factor in Office Buildings)

  • 김세동;정동효
    • 한국조명전기설비학회지:조명전기설비
    • /
    • 제6권6호
    • /
    • pp.42-48
    • /
    • 1992
  • This paper shows a reasonable design standard of substation facility density and demand factor in office buildings, that was made by the systematic and statistical way considering actual conditions, such as investigated electric equipment capacity, electric power consumption, etc for 121 buildings. The saving of electric equipment investment, the decrease of power loss, the improvement of facilities utilization and the decrease of electric power rates an be contributed by the application of the design standard must be applied by the revision of current regulations and laws.

  • PDF

스마트 그리드에 그린 IT 활용 연구

  • 정현수;김병식;왕미경;김종훈;한명지
    • 한국데이타베이스학회:학술대회논문집
    • /
    • 한국데이타베이스학회 2010년도 춘계국제학술대회
    • /
    • pp.33-41
    • /
    • 2010
  • Recently the number of IT equipment have increased. It consumes large amounts of energy and is emissions of greenhouse gases. Co2 emissions with the PC and the monitor has the highest percentage to 39% more than other IT equipment. In addition, Plan for your PC's power management and technology development is being pursued in developed countries. To reduce energy costs of organizations with large numbers of the PC and to cut down on Co2 emissions, the energy load control technology of ACPI standards-based PC IS suggested. AMI-based PC power-management system was constructed, Approximately 20% of operating a result of the test power consumption was reduced. Looking at the case of the United States, PC monitors from the University of Wisconsin-Oshkosh was Sleep mode. As a result, the monitor on a, $ 20 for a year reduced energy costs. In GE(General Electronic), Approximately 75,000 PC's power setting time was Monitor Off :15 minutes/ Hard Drives Off 30 minutes/ System Standby 30 minutes/ Hibernation mode 2 hours. 1 year, electric bill was $ 2.5 million savings and 3 years electric bill was $ 6.5 million savings. Measuring energy usage data, using the measured data, electric energy management technology is not. Platform development to measure energy usage for Individual energy-consuming equipment is urgently required.

  • PDF

LightGBM을 이용한 수력 펌프 유량 추정의 실험적 연구 (An Experimental Study on the Estimation Flow-rate of Venturi Pump Using LightGBM)

  • 정진범;이지환;강명철
    • 드라이브 ㆍ 컨트롤
    • /
    • 제20권4호
    • /
    • pp.123-132
    • /
    • 2023
  • In disaster situations, to facilitate rapid drainage, electric underwater pumps are installed manually. This poses a high risk of electric shock accidents due to a short circuit, and a lot of time is required for hose connection and installation of electrical devices. To solve these problems, a Venturi pump using the venturi effect without external power is used. However, Venturi pumps that operate without external power make it difficult to install flow sensors such as electric devices; consequently, it is difficult to check the real-time flow rate. This paper proposes a flow estimation logic to replace the function of the flow sensor for the venturi pump . To develop the flow estimation logic, the flow characteristics of the venturi pump, according to the operating conditions, were checked. After that, the relationship with the flow rate of the venturi pump was defined using a pressure sensor corresponding to a low-cost sensor. Finally, an analysis of the estimation error was performed using the developed flow estimation logic.

Proper Decision for Maintenance Intervals of Equipment in Power Stations by Considering Maintenance Replacement Rate and Operation Rate

  • Nakamura, Masatoshi;Suzuki, Yoshihiro;Hatazaki, Hironori
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2001년도 ICCAS
    • /
    • pp.157.3-157
    • /
    • 2001
  • In this paper, the optimal maintenance scheduling for turbine with considering maintenance replacement rate was proposed in order to reduce the maintenance cost during the whole period of operation, meanwhile keeping current reliability of turbine. The proposed method is only based on a few limited available data with various factors relating to maintenance replacement and repair of turbine. The proposed method will be adopted by Kyushu Electric Power Co., Inc. from April in 2002 to determine the maintenance schedule of thermal power plants.

  • PDF

전기자동차 충전스탠드의 제어파일럿 신호를 이용한 대역 내 통신 방식 (Inband Signaling on the Control Pilot of Electric Vehicle Supply Equipment)

  • 김철우;김상범;임유석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.2019-2020
    • /
    • 2011
  • Electric Vehicle Supply Equipment(EVSE) is a system or an equipment to supply electric power for charging the traction batteries on the electric vehicle. Control Pilot is an electric signal generated by EVSE and is transmitted to the electric vehicle by a vehicle coupler and a contact. The duty cycle of control pilot determines the maximum current to be drawn by electric vehicle. When the duty cycle is 5%, it is indicated that digital communication is needed. This paper deals with the data format and definition about communication scheduling through the inband signal on the control pilot of EVSE.

  • PDF

IEC61850 기반 디지털 변전시스팀에서의 PDMS 적용 방안에 관한 연구 (A study for PDMS Application Scheme of Digital S/S with IEC61850 Base)

  • 이동철;김희수;배을록;민병운
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 춘계학술대회 논문집 전기설비전문위원
    • /
    • pp.78-82
    • /
    • 2006
  • The Partial Discharge Monitoring System is technology which is available to measure & analysis the partial discharge of Power equipment. This technology is in the limelight as a pre-forecast system of equipment defect but there are some problems like no protocol standard, layered network management and the limitation of physical size. This paper presents whole system structure includes engineering centers, LN(Logical Node) to apply PDMS for, base-digital substation system, ICE61850 compatible Condition Monitoring &Diagnosis (CMD), Local Unit(LU), Intelligent Electronic Device (IED) for the solution scheme of these limitations.

  • PDF

Expert System for ABC Tuning of Once-Through Bboiler

  • Matsumura, S.;Kojima, Y.;Tozaki, T.;Shirasaka, Y.;Suzuki, M.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1989년도 한국자동제어학술회의논문집; Seoul, Korea; 27-28 Oct. 1989
    • /
    • pp.744-748
    • /
    • 1989
  • A newly developed Expert System (ES) for the tuning of thermal power plant control equipment is described. The system is furnished with the rules for controller tuning which were obtained by analysis and arranging the data and knowledge from the experts or tuning records. Based on these rules, automatic tuning or setting of the control parameters is performed in real-time base. The performance of the test equipment, a combination of ES and a boiler simulator, was examined in the automatic tuning test for steam pressure, steam temperature, and load controllers of a constant-pressure once-through boiler model. It was confirmed from the test results that the system is quite promising for future application to actual plants, since the tuning results obtained by the proposed system were similar to those by tuning experts.

  • PDF

지하철 역사의 안정적 전원공급을 위한 보호시스템 검토 (A study on present status and improvement of protection relay system in subway station for stable power supply)

  • 나종우;조원강;박동선;유연성;문화수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.433-444
    • /
    • 2008
  • Nowadays, subway station has provided not only transportation but living spaces for everyday activities. Therefore, a variety of facilities have been installed for a safety of citizens such as fire-fighting equipment, platform screen doors and giving high level of benefits such as air-conditioning and heating equipment, escalators, lighting apparatus. In order to operate these facilities appropriately, it is needless to say that electric power supply must be reliable. Many protection relays have been installed to protect electric apparatus and power system, nevertheless it..s study has been insufficient in the concrete. From this paper, through analyzing of protection relay system of electric room operated in line 2 of Seoul metro, we can help to improve stable power supply system of subway station.

  • PDF

전력케이블 열화 감시방안에 관한 연구 (A Study on Monitoring Means of Insulation deterioration of Electric Power Cable)

  • 한학수;민경윤;유기선
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1522-1528
    • /
    • 2007
  • Electric Power cable is the apparatus that receives electric power from the Korea Electric Power Corporation and supplies electric power to electric train and annex facilities of each railway station. With substantial ripple effect during power blackout accidents, such power blackout accidents must be coped with by discriminating the status of insulation deterioration of electric power cable in advance. Discrimination of insulation deterioration of the electric power cable is normally executed while the power is disconnected and it is very difficult to discover, at early stage, the insulation deterioration of the power cable in operational state since the duration of inspection is limited. This research aims to consider method of diagnosing the insulation deterioration of electric power cable in On-Line state rather than diagnosis in Off-Line state in order to secure reliability of power supply by reducing duration of power blackout (accidental blackout and blackout during works) and by seeking reduction in equipment and manpower used in diagnosis of deterioration through prevention of the accident itself prior to occurrence through early restoration of accident due to insulation deterioration of the electric power cable and assessment of performance of the cable under operation.

  • PDF

가공 배전선로 활선 정비 로봇 시스템의 기술 타당성 검토 (Technical Feasibility Study on Live-line Maintenance Robot System for Overhead Distribution Lines)

  • 박준영;이윤건;장영식
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제8권2호
    • /
    • pp.49-53
    • /
    • 2022
  • The distribution live-line work method is an operation method of working in a state in which electricity flows through overhead distribution lines to minimize inconvenience to electric customers due to power failure. In June 2016, to strengthen the safety of electrical workers, Korea Electric Power Corporation announced that it would in principle abolish the rubber glove method, in which workers wore protective equipment such as rubber gloves and performed their maintenance work. In addition, KEPCO announced that it would develop a short-range live working method using smart sticks and an advanced live-line maintenance robot system where workers work without touching wires directly. This paper is a preliminary study for the development of the live-line maintenance robot system, and deals with the results of analyzing the technical feasibility of whether the live works performed by workers can be replaced by robots or not.