• Title/Summary/Keyword: Electric Equipment Capacity

Search Result 106, Processing Time 0.021 seconds

A Study on the Estimation of Electric Equipment Capacity in Office Buildings (사무소건물(事務所建物)의 전기설비용양(電氣設備容量) 산정(算定)에 관한 연구(硏究))

  • Kim, Se-Dong;Choi, Do-Hyuk
    • Proceedings of the KIEE Conference
    • /
    • 1992.07b
    • /
    • pp.666-668
    • /
    • 1992
  • This paper shows a reasonable design standard of electric equipment capacity for office buildings, that was made by the systematic and statistical way considering actual conditions, such as investigated electric equipment capacity, electric power consumption, etc for 121 buildings. The saving of electric equiment investment, the decrease of power loss, the improvement of facilities utilization and the decreasse of electric power rates can be contributed by the application of the design standard.

  • PDF

An Analysis of Various Factors that Determines the Size of Electric Room(22.9Kv class) (전기실의 면적을 결정하는 제 요소의 분석(22.9Kv class))

  • Eo, Ik-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.443-445
    • /
    • 2001
  • As the new large buildings are continuously being built with the advanced technology and skills, an adequate size of electric room needs to be obtained so that engineers establish an efficient and reliable system in the electric room. Considering the current capacity, its expansion and its connecting system, the final size of it should be determined in order to bring an effective use of the building. Usually the extension of electricity capacity is on the increase after construction and it comes from the lack of scientific evaluation on the electric room. Later when the expansion of computer and important electric equipment that needs much capacity is impossible, it will cause a great deal of damage to the renting business of the building as well as becomes the unstable factors of the whole system. Therefore, it is important to have the exact method of calculating the effective size of electric room, the heart of the building, especially when the value of land price is very high. In addition, it should be calculated in an accurate way due to the diversification of the system and the compact size of the electricity equipment. However, the research on this area and the comparison and evaluation of the size after construction have not been made enough and the results of them have not been applied when calculating a new size of electric room. Accordingly, this study examines three methods prescribed in the standards of electricity installation technology through case analysis and suggests substantial data by system, capacity, and purpose.

  • PDF

Development of AC Electric Vehicle Propulsion System (Converter/Inverter) using IPM Switching Device (IPM 스위칭 소자를 적용한 AC 전동차 추진제어장치 (Converter/Inverter) 개발)

  • Kim T. Y.;Kno A. S.;Hwang K. C.;Choi J. M.;Kim J. B.
    • Proceedings of the KIPE Conference
    • /
    • 2004.07a
    • /
    • pp.298-302
    • /
    • 2004
  • In this paper, AC electric vehicle propulsion system(Converter/Inverter) using high power semiconductor, UM(Intelligent Power module) is proposed. 2-Parallel operation of two PWM converter is adopted for increasing capacity of system and the VVVF inverter control is used a mixed control algorithm, where the vector control strategy at low speed region and slip-frequency control strategy at high speed region. The proposed propulsion system is verified by experimental results with a 1,350kW converter and 1,100kVA inverter with four 210kW traction motors.

  • PDF

A Study on the Reasonable Design Standard and Countermeasures of the Demand Factor (변전설비 용량기준의 합리화 방안 및 대책에 관한 연구)

  • Yoo, H.J.;Ha, B.N.;Nam, K.D.;Pak, S.M.;Cho, N.H.
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.902-904
    • /
    • 1996
  • In this paper, we proposed the reasonable design standard and countermeasures of Demand Factor for large office buildings, that was made by the statistical way considering actual conditions, such as investicated electric equipment capacity, electric power consumption, etc. So as to save electric equipment investment, the decrease of power loss, the improvement of facilities utilization and the decrease of electric rates, we can be contributed by the application of the design standard. The result of saving effect is showed to confirm the practical use of the proposed Demand Factor, and also, it is believed that this proposed Demand Factor will be useful in electric equipment operation and planning.

  • PDF

Development of Smart ICT-Type Electronic External Short Circuit Tester for Secondary Batteries for Electric Vehicles (전기자동차용 2차전지를 위한 스마트 ICT형 전자식 외부 단락시험기 개발)

  • Jung, Tae-Uk;Shin, Byung-Chul
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.3
    • /
    • pp.333-340
    • /
    • 2022
  • Recently, the use of large-capacity secondary batteries for electric vehicles is rapidly increasing, and accordingly, the demand for technologies and equipment for battery reliability evaluation is increasing significantly. The existing short circuit test equipment for evaluating the stability of the existing secondary battery consists of relays, MCs, and switches, so when a large current is energized during a short circuit, contact fusion failures occur frequently, resulting in high equipment maintenance and repair costs. There was a disadvantage that repeated testing was impossible. In this paper, we developed an electronic short circuit test device that realizes stable switching operation when a large-capacity power semiconductor switch is energized with a large current, and applied smart ICT technology to this electronic short circuit stability test system to achieve high speed and high precision through communication with the master. It is expected that the inspection history management system based on data measurement, database format and user interface will be utilized as essential inspection process equipment.

Thermal Characteristics of Electric Wiring for Halogen Warm Lamp Group and Automatic Waterer Group at Stable (우사(牛舍)에서의 할로겐보온등군(群) 및 자동급수통군에 대한 전기배선의 열적 특성)

  • Kim, Doo-Hyun;Yoo, Sang-Ok;Kim, Sung-Chul
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.4
    • /
    • pp.48-53
    • /
    • 2014
  • This study is analyzed for electrical fire danger by electric equipments through surveys of stable owners and the field investigation at 64 stable. Also, an experiment is performed to analyze the thermal characteristics of 4 types electric wiring according to the number of operating halogen warm lamp group and automatic waterer group in Beon-young stable in the Cheongwon location. The survey is done to investigate the occurrence of electrical fire, electric equipment, causes and dangerous equipment. As a result, halogen warm lamp group and automatic waterer group are found to have dangerous loads. In the field investigation, the mode of load capacity of the halogen warm lamp group and automatic waterer group was investigated. The mode of load capacity of halogen warm lamp group (over 3 years) is found 17A and that of the auto waterer group (10 years) is 16A. In this experiment, the halogen warm lamp group aged at least 3 years showed $109^{\circ}C$ while that aged less than 1 year appeared $83^{\circ}C$, showing the max gap of $26^{\circ}C$. The automatic waterer group aged 10 years showed $90^{\circ}C$ while that aged less than 1 year appeared $68^{\circ}C$, showing the max gap of $22^{\circ}C$. These findings indicate that the mode of load capacity needs to be considered in selecting and installing wiring for the electric equipment construction of halogen warm lamp group and automatic waterer group in stable.

Seismic capacity re-evaluation of the 480V motor control center of South Korea NPPs using earthquake experience and experiment data

  • Choi, Eujeong;Kim, Min Kyu;Choi, In-Kil
    • Nuclear Engineering and Technology
    • /
    • v.54 no.4
    • /
    • pp.1363-1373
    • /
    • 2022
  • The recent seismic events that occurred in South Korea have increased the interest in the re-evaluation of the seismic capacity of nuclear power plant (NPP) equipment, which is often conservatively estimated. To date, various approaches-including the Bayesian method proposed by the United States (US) Electric Power Research Institute -have been developed to quantify the seismic capacity of NPP equipment. Among these, the Bayesian approach has advantages in accounting for both prior knowledge and new information to update the probabilistic distribution of seismic capacity. However, data availability and region-specific issues exist in applying this Bayesian approach to Korean NPP equipment. Therefore, this paper proposes to construct an earthquake experience database by combining available earthquake records at Korean NPP sites and the general location of equipment within NPPs. Also, for the better representation of the seismic demand of Korean earthquake datasets, which have distinct seismic characteristics from those of the US at a high-frequency range, a broadband frequency range optimization is suggested. The proposed data construction and seismic demand optimization method for seismic capacity re-evaluation are demonstrated and tested on a 480 V motor control center of a South Korea NPP.

Recommended Practice for Demand Factor/Diversity Factor with respect to Power Consumption Characteristics in Commercial Buildings (업무용 빌딩의 전력소비 특성을 고려한 수용률/부등률의 적용에 관한 연구)

  • 김세동
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.16 no.6
    • /
    • pp.74-79
    • /
    • 2002
  • This paper shows a reasonable design standard factor in commercial buildings, that was made by the systematic and statistical way considering actual conditions, such as investigated electric equipment capacity, electric power consumption, load characteristic, etc., for 23 commercial buildings. With a rapid growth of national economics with the development of intelligence society , electrical energy consumption markedly increased Expecially, it is increased electrical energy consumption in the commercial buildings and thus an energy conservation through efficient use of electricity became more important In our country, the estimation of demand factor and electric equipment capacity are not properly and thus the application of these factors are confusing and different in each electric design of the field.

Domestic current situation and Improvement plan Consideration of Electricity Design & Supervision System (전기설계.감리제도의 합리적인 운영방안에 관한 고찰)

  • Jeong, Yeon-Hae;Nam, Ki-Beom;Sin, Hwa-Yeong;Jeong, Hyeong-Yong;Lee, Jong-Hyuk;Jun, Young-Su
    • Proceedings of the KIEE Conference
    • /
    • 2007.04b
    • /
    • pp.10-15
    • /
    • 2007
  • For the introduction of the electricity of the special design and supervision system to Protect the faulty-workmanship of the electricity equipment and to reserve the electricity safety, last 1995 "Electricity Technology Management Act" were carried out enactment. March 2002, we introduced the pre-Qualification system that is selected the competent company about the electricity design and supervision service over so much capacity which is ordered by the Public institution such as the nation, local autonomous entity, government investment institute and so on. December 2005, the electricity equipment over so much capacity was taken the housing construction plan's approval by the housing act in case, the municipal or district governor with the authority to approve who selected the electricity supervision company according to the pre-Qualification system. Due to the introduction of the system, we could expect the rights and interests increase of the consumer by eradicating dumping of the close relationship between supervision company and the builder, reduction and concurrent position of the supervisor, according to confirm the quality of the electricity equipment and electricity safety. In spite of introducing of the system, the problems occured as reducing the electricity designer's task range compared with different field, modifing the supervisor's rank system rationally, because of researching about the electricity design and supervision technique lacks. Also, KEEA(Korea Electric Engineers Association) manage the caller of the electricity design and supervisor(company or people), but the problems occured as opening to the public about the curler management, introducing automatic bidding system and We need the solution plan about this. Consequently, we consider the present situation of the domestic and outside and problem about the electricity design and supervision system in this paper, try to present rational operation plan through this.

  • PDF

An ICCP Application Method for an Error Decrease of the Power Control Communication System (전력제어 통신 시스템의 에러 감소를 위한 ICCP 적용 방안)

  • 김종빈;정래성
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.40 no.9
    • /
    • pp.349-357
    • /
    • 2003
  • Because of capacity of the electric power equipment grew larger and the electric power system was complicated, it was required a protocol to process data without the errors in order to supply the high quality and stable electric power. However, HDLC and TCP/IP communication protocol using between Seoul EMS and Kwangju RCC (or between RCC and SCC) is decreasing reliability by the delay of speed and the occurrence of errors. In this paper, we applied ICCP(Inter-Control Center Communication Protocol) communication protocol in order to improve them and implemented an electric power communication system for remote control of the electric power equipment. Also, we modified program for error correction and implemented the system using the most suitable BLT. The errors were more decreased in case of ICCP protocol than HDLC protocol and TCP/IP protocol applied to the electric power communication system.