• Title/Summary/Keyword: Electric Equipment

Search Result 1,368, Processing Time 0.03 seconds

Analysis of Electrical Equipment and Work Environment for Domestic Small-Scale Construction Site (국내 소규모 건설현장의 전기설비 및 작업환경 분석)

  • Kim, Doo-Hyun;Hwang, Dong-Kyu;Kim, Sung-Chul;Kang, Shin-Uk;Choi, Sang-Won
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.4
    • /
    • pp.42-47
    • /
    • 2014
  • This paper is aimed to investigate and analyze of characteristic for electrical equipment and work environment for the small-scale site. In order to investigate and analyze electrical equipment and work environment for preventing electric shock disaster in construction sites, 50 small-scale construction sites and 12 large-scale construction sites are selected. This paper completed site investigations of low-voltage equipment and the portable electric machine and equipment in 12 large-scale construction sites and 50 small-scale construction sites. The findings were about the electric shock environment relevant to the ground-relevant equipment, the panel board, the protection tools, the sockets, the temporary wiring system, the portable and movable electric machines and equipments in small-scale construction sites. Finally, this study analyzed the domestic and foreign relevant standards and regulations and these findings can be utilized as educational data warning electric shock risk caused by electric equipment in small-scale construction site.

Investigations on the Thermal Phenomena in High Current Electric Switchboard (대전류 통전시 배전반내의 열적 현상에 관한 연구)

  • Lee, B.W.;Kang, J.S.;Sohn, J.M.;Choi, W.J.;Seo, J.M.
    • Proceedings of the KIEE Conference
    • /
    • 1999.11d
    • /
    • pp.1051-1053
    • /
    • 1999
  • In this work, thermal phenomena and temperature rise due to thermal source in electric switchboard were investigated using analytical measures. Electric switchboards are assemblies of panels on which are mounted switches, circuit breakers, high current busbars, meter, fuses and terminals essential to the operation of electric equipment. It is very difficult to predict the temperature rise in switchboard due to the existence of several heat sources. To overcome this situations, we focused on the eddy current distribution on the panel of switchboard caused by high current busbars as a fundamental basis. And thermal sources including busbar and switchgear have been considered. Furthermore, thermal transfer phenomena in switchboard was considered theoretically. Finally, three-dimensional thermal model for eddy current analysis has been adopted and FEM analysis was conducted. As a result, three-dimensional numerical analysis found to be applicable to the analysis of thermal phenomena in switchboard.

  • PDF

Analysis of used electric power for pohang accelerator laboratory (포항가속기연구소의 전력사용량에 대한 분석)

  • Son, C.H.;Son, Y.G.
    • Proceedings of the KIEE Conference
    • /
    • 2006.07e
    • /
    • pp.31-32
    • /
    • 2006
  • Pohang accelerator Laboratory is from 1994 analyzed electric power amount used for about 10 years. It is one of equipment that consume electric power of greate electric power to single test equipment. Accelerator Laboratory institute investigates the consumption rate of energy that is spent to each building could divide by linear accelerator and save ring and analyzed about the equipment utilization rate and average electric power. Countermeasure that this treatise can forecast power loss of electric power by equipment through analysis of electric power amount used and heighten the utilization rate of equipment wishes to do comparative analysis.

  • PDF

A Study on the Estimation of Electric Equipment Capacity in Office Buildings (사무소건물(事務所建物)의 전기설비용양(電氣設備容量) 산정(算定)에 관한 연구(硏究))

  • Kim, Se-Dong;Choi, Do-Hyuk
    • Proceedings of the KIEE Conference
    • /
    • 1992.07b
    • /
    • pp.666-668
    • /
    • 1992
  • This paper shows a reasonable design standard of electric equipment capacity for office buildings, that was made by the systematic and statistical way considering actual conditions, such as investigated electric equipment capacity, electric power consumption, etc for 121 buildings. The saving of electric equiment investment, the decrease of power loss, the improvement of facilities utilization and the decreasse of electric power rates can be contributed by the application of the design standard.

  • PDF

Voltage Measurement Accuracy Assessment System for Distribution Equipment of Smart Distribution Network

  • Cho, Jintae;Kwon, Seong-chul;Kim, Jae-Han;Won, Jong-Nam;Cho, Seong-Soo;Kim, Juyong
    • Journal of Electrical Engineering and Technology
    • /
    • v.10 no.3
    • /
    • pp.1328-1334
    • /
    • 2015
  • A new system for evaluating the voltage management errors of distribution equipment is presented in this paper. The main concept of the new system is to use real distribution live-line voltage to evaluate and correct the voltage measurement data from distribution equipment. This new approach is suitable for a new Distribution Management System (DMS) which has been developed for a distribution power system due to the connection of distributed generation growth. The data from distribution equipment that is installed at distribution lines must be accurate for the performance of the DMS. The proposed system is expected to provide a solution for voltage measurement accuracy assessment for the reliable and efficient operation of the DMS. An experimental study on actual distribution equipment verifies that this voltage measurement accuracy assessment system can assess and calibrate the voltage measurement data from distribution equipment installed at the distribution line.

Component Replacement Ordering Evaluation for Proper Reliability Maintenance in Power Distribution System (배전계통 적정 신뢰도 유지를 위한 설비교체 순위 평가)

  • Lee, Hee-Tae;Kim, Jae-Chul;Moon, Jong-Fil;Chu, Cheol-Min
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.48-50
    • /
    • 2005
  • New environment change of electric power system focused in consumer's energy supply and demand. But electric power reliability preservation and reliability improvement countermeasure also need for long-term. It is need that change equipments that is composing electric power system in well-timed time and by maintaining, prevent breakdown beforehand and prevent consumer's power interruption by equipment fail. However, as only quantitative estimation is available by reliability estimation method that is presented in existing, it is no to use in dictionary fault prevention. Therefore, applied optimum reliability preservation through existent equipment fault data analysis of electric power system in equipment replace side, and this when maintain equipment replace of electric power system for reliability preservation using responsiveness analysis to base ordering evaluate. In existing about main equipment plain that this paper is power system the valued failure rate use this by score and precedence of electric power system equipment for replace of system considered expense.

  • PDF

Investigation on $SF_6$ Hybrid Interrupter using Thermal Expansion and Arc Rotation Principle (자력팽창 및 아크 회전에 의한 배전급 $SF_6$ 복합소호부 개발 연구)

  • Lee, B.W.;Sohn, J.M.;Kang, J.S.;Choe, W.J.;Kim, Y.K.;Seo, J.M.
    • Proceedings of the KIEE Conference
    • /
    • 2000.07b
    • /
    • pp.919-921
    • /
    • 2000
  • This paper considers the research of the hybrid interrupter which adopts both rotating arc and thermal expansion technology. The operating principle of this device depends on rapid arc rotation due to the magnetic field created by the fault current through a coil which is mounted on contacts and also relies on the principle of thermal expansion created by arc energy in extinguishing chamber and finally causes pressure rise in expansion volume. In this research, the principle of the interrupting techniques are given and experimental results of hybrid interrupter which is developed by new technology is introduced.

  • PDF

Analysis of earthquake countermeasure for electrical facility at building (건축물에 시설되는 수변전설비의 지진 대책에 대한 조사 분석)

  • Kim, Gi-Hyun;Lee, Sang-Ick;Jean, Hyun-Jae;Bae, Suk-Myong
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.10a
    • /
    • pp.359-362
    • /
    • 2008
  • Middle domestic the occurrence size which stews recently from the Korean Peninsula circumference country is augmenting on a large scale about earthquake about safe countermeasure part from the existing Natural Countermeasure Law 2008. Refers with the Earthquake Disaster Countermeasure Law to be new standard contents establishment by law and strengthened in March. Consequently the research is propelled about electric equipment earthquake-proof plan and countermeasure. The present paper investigated an equipment by domestic facility present condition about the change disappointment electric equipment which can supply all the member in the building an investigation analysis about problem point and improvement fact. Also about overseas electric equipment investigated about earthquake-proof plan relation system and facility present condition. Investigated the electric equipment earthquake-proof plan pertinent data which is advanced from like this existing nation and the equipment and application direction must apply to domestic presented. With character presents following the guide about electric equipment earthquake-proof plan becomes feed with the fact that will be able to use.

  • PDF

Development of AC Electric Vehicle Propulsion System (Converter/Inverter) using IPM Switching Device (IPM 스위칭 소자를 적용한 AC 전동차 추진제어장치 (Converter/Inverter) 개발)

  • Kim T. Y.;Kno A. S.;Hwang K. C.;Choi J. M.;Kim J. B.
    • Proceedings of the KIPE Conference
    • /
    • 2004.07a
    • /
    • pp.298-302
    • /
    • 2004
  • In this paper, AC electric vehicle propulsion system(Converter/Inverter) using high power semiconductor, UM(Intelligent Power module) is proposed. 2-Parallel operation of two PWM converter is adopted for increasing capacity of system and the VVVF inverter control is used a mixed control algorithm, where the vector control strategy at low speed region and slip-frequency control strategy at high speed region. The proposed propulsion system is verified by experimental results with a 1,350kW converter and 1,100kVA inverter with four 210kW traction motors.

  • PDF

Development of firing equipment and monitoring system for electric power conversion system for high voltage and large current (고압 대전류용 전력변환 점호장치 및 감시시스템 개발)

  • Lee Joo-Hyun;Lim Ick-Hun;Ryu Ho-Sun
    • Proceedings of the KIPE Conference
    • /
    • 2006.06a
    • /
    • pp.481-484
    • /
    • 2006
  • A electric power conversion system in a pumped storage power plant is important equipment for converting electric motor kinetic energy into electric power. A electric power conversion monitoring system consists of high voltage thyristor firing equipment, fault detection module, data gathering module, real time data processing equipment and man machine interface system. This paper describes electric power conversion system overview, the developed SFC monitoring system configuration including system characteristics, and successful application result to San-Cheong pumped storage power plant.

  • PDF