Proceedings of the Korean Geotechical Society Conference
/
2005.03a
/
pp.1420-1425
/
2005
In a case of an example in Korea, some areas of Yangsan near Busan which exist on soft ground with aquifer, showed us some difficulties of the preparing for housing site and earth structures. From these experiences, recently, the development and research of technology is getting increased, which minimize the influence to the environment from construction work, which is in an agreement with eco-friendly construction in terms of the reasonable processing of ground water. On this case study, one area of Japan that has many site on soft ground with aquifer, is introduced as the reasonable processing of ground water. The applications of the technology for ground water in Korea are discussed.
The purpose of this study was to investigate total $CO_2$ amount of steel and reinforced concrete construction, and compare and analyze $CO_2$ amount on construction-material. And then it was studied about new element that environment compatibility of architecture structure design based on paradigm of environment age. Architecture action should have proceeded course that reduce burden of the earth environment in relation between architecture and environment and increase contact of human and nature. As environment compatibility development is emphasized with architecture development, architecture structure design give improvement of one important element that environment compatibility except stability, function, economy and necessary propriety of environment compatability of construction design.
Journal of the Computational Structural Engineering Institute of Korea
/
v.26
no.2
/
pp.147-155
/
2013
In this paper structural analysis of underground electrical power cable structures which is excavated below the surface of the earth in the downtown area is carried out considering the effect of construction sequence. There are many various life-line facilities below the surface of the earth in the downtown area. MPDAP was used for finite element analysis of underground electrical power cable structures. Three typical sections are simulated by finite element models. Unbalanced equilibrium problems may be occurred when conventional finite element procedures were used for simulation of tunnel excavation. Therefore equilibrium perturbation concept was applied to solve these problems. The effects of time-dependent deformations in advancing tunnel excavation are considered in the stages of construction sequences as using the load distribution factor. It is shown that values of maximum displacement of both soil and rock surrounding underground electrical power cable structures obtained by our numerical studies are less than allowable values.
Journal of the Korea Academia-Industrial cooperation Society
/
v.14
no.10
/
pp.5184-5191
/
2013
The automated quantity take off technique using BIM authoring tools has been recently issued, and the studies of this method for the accuracy, efficiency, and the unit computing for the simple volume, area and number have been developed. Meanwhile the main concerns such as the details for the level of modelling, and the costs and time for the calculating BOQ item are still required to study. In this paper, the earth works, drainage works, pavement works, and facility works using BIM authoring tools are designed in 3D, and the applicability of automated quantity take off technique using BIM authoring tools is discussed, respectively. As a result, automated quantity take off are limited in the earth works, drainage works, pavement works, and facility works. But Most items of BOQ can be supported in Re-bar model.
Precast culvert system is generally constructed with a series of process such as excavation, ground mitigation, placement of culverts, anti-leakage packing between adjacent culverts, post-tensioning for PS strands and backfilling. In this process inappropriate ground mitigation often causes differential settlement and, correspondingly, makes water-leakage to be occurred between adjacent boxes. This study was performed to understand the behavioral characteristics of recently proposed precast foundation plate to support precast culvert system through on-site pilot construction. The gap between two adjacent culverts, increment of earth pressure at the bottom of culvert, vertical settlement of top of the culverts were monitored using various sensors. The monitoring results showed that the proposed foundation plate provides better culvert system in the points of less gap development, earth pressure and settlement at the adjacent of two culverts.
Kim, Jin-Man;Choi, Bong-Hyuck;Cho, Sam-Deok;Joo, Tae-Sung;Kim, Ho-Bi;Rhee, Jong-Wha
Journal of the Korean Geosynthetics Society
/
v.2
no.2
/
pp.3-11
/
2003
Researches on the induced trench method using compressible materials such as clay, mud, straw, or EPS block have been performed to reduce the load acting on buried conduits under a high fill. The induced trench method has the problems that the arching area due to the compressible arching material is one dimensional or localized in a narrow zone. The main purpose of this study is to solve the problems of the induced trench method mentioned above. The various types of laboratory model tests are conducted to find the effects of the variations of EPS block width, multilayer application, soil density, and diameter of the flexible steel pipe. A series of model tests was conducted to evaluate the reduction of earth pressure on conduits using EPS block. Based on modeling test it is found that the magnitude of vertical earth pressure on conduits was reduced about 60% compared with conventional flexible conduit systems.
This paper deals with the characteristics of earth pressure to the debris-fall prevention walls which usually are installed in front of steep slope. Such walls have narrow backfill width where the active soil wedge can not be developed fully. The earth pressure to such walls ue affected by the movement of wall and arching effects due to the friction developing on the surface of adjacent ground slope and wall and therefore cannot be analyzed and calculated reliably. The study is carried out through laboratory model tests using centrifuge test. Test results reveal that the earth pressure to the debris-fall prevention wall depends largely on the inclination angle of the ground slope and the wall movement. The earth pressure reduction due to wall movement was observed at the upper half of wall, while the arching effect was significant at the lower half especially in the case of steep ground slope. It can be said that from the result of this study in the design of a debris-fall prevention wall the earth pressure should be determined considering the inclination of ground slope and the condition of wall movement during and after construction.
Journal of the Korea Academia-Industrial cooperation Society
/
v.15
no.6
/
pp.3916-3922
/
2014
Generally, the retaining wall is becoming unstable as the height is higher. On the other hand, the retaining wall with the relieving platform is more stable and more economical than any other type of retaining wall, because the relieving platform the reduce the lateral earth pressure. In this study, numerical analyses were carried out for 15 cases varying with the type of retaining wall, length and location of the relieving platform and the backfill type. From the numerical analyses, the reduction of the lateral earth pressure was checked and the results of numerical analyses were compared with that of model tests and theoretical equations. As the results of this study, the lateral earth pressure of the retaining wall with the relieving platform is considerably less than that of cantilever wall. And the of magnitude of the lateral earth pressure is affected by the length and location of relieving platform and the backfill type.
Crib wall is one of the segmental grid retaining walls using headers and stretchers to establish the framework of the wall. In this method, grids formed by the intersection of headers and stretchers are generally filled with the gravel to maintain the weight of the wall. Therefore, the construction can be carried out with higher speed and much economically when compared with the concrete retaining wall. Furthermore, it has high drain capacity, and environmentally friendly aspects also have been pointed out because the possibility of the planting at the front of the wall. However, in the crib wall method, the relative movement between the individual headers and stretchers was generally recognized, and stress redistribution in the gravel filling was also observed when subjected to the external loading and self-weight of filling. Therefore, it has been thought that the distribution of the earth pressure in the crib wall system differ from that of the concrete retaining wall. In this study, the surcharge tests using the scaled model crib wall was carried out to observe the distribution of the earth pressure in the segmental grid retaining wall. The earth pressure was measured in the six specified height of wall, and the distribution of the pressure was analyzed. Furthermore, the earth pressure by computation or by the test using the concrete retaining wall was also considered to make comparison.
Field measurements were carried out in this study to investigate the behavior of cut and cover tunnel such as the distribution and the magnitude of the earth pressure during back fill process. Three kinds of measuring instruments, such as the earth pressure load cell, the concrete strain gauge and the reinforcing bar meter of embedded type in concrete structure were installed and measured. Earth pressure load cells measured the outside forces acting on the tunnel lining with radial directions. Three load cells were installed at the crown, the right and the left shoulder of the tunnel, respectively. Three sets of reinforcing bar meter were installed in the double reinforcements of the tunnel lining and their locations were the same with the position of the earth pressure load cells. Concrete strain gauge was installed only one site of the upper compressive part at the tunnel crown. Based on the measurements, the deformation and the earth pressure acting on the tunnel lining were investigated with the back fill process. Considerations on the validity of the field measurements were paid.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.