• Title/Summary/Keyword: EPC Phase(Engineering, Procurement, Construction)

Search Result 7, Processing Time 0.018 seconds

A Study on the Analysis of the Risk Factors for Overseas Plant Construction Projects (해외 화공플랜트 건설사업 위험요인 영향도 분석)

  • Cho, Seung-Yeon;Kim, Young-Su
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05b
    • /
    • pp.103-108
    • /
    • 2010
  • The purpose of this study is to analyze of the risk factors for oversea plants construction projects. For this study, risk factors data from related literature review, research organization and construction company was researched and classified under each EPC phases. In addition, a questionnaire survey by plant experts was conducted for analysis of risk weight and costs and time impact on each EPC phases. The results of this study are as follows: First, a detail design errors(engineering phase), a equipment procurement plan(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest weight factors. Second, a financing plan(engineering phase), quantity take-off bill(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest cost impact factors. Third, detail design errors(engineering phase), a equipment procurement plan(procurement phase), and schedule management errors(construction phase) were analyzed the highest time impact factors.

  • PDF

Information Breakdown Structure of Engineering Phase for Plant Project through Business Analysis (산업설비 업무 분석을 통한 설계단계 정보 분류체계)

  • Song, Young-Woongl;Cho, Hang-Min;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.3-15
    • /
    • 2009
  • Recently, it has increased projects in the Oil and Gas industry as growing plant of overseas construction market. Therefore, domestic companies need to set some aggressive plans up that secure competitiveness of international plant business such as enhancing productivity, technological ability and statistical management. Specifically in the Oil and Gas industry of overseas plant business requires implying information in EPC (Engineering, Procurement and Construction, below EPC) more, but it has not been suggested an appropriate breakdown system for contents that manages the information each EPC phase, which lead to problems such as revision of design document, occurring duplicated work and omissions of each participant. For these problems, we find market share decreasing and competitiveness running down. Thus, for increasing practical use of contents management system and construction industry's information, this paper suggests a contents breakdown system based on BPM (Business Process Management), defines business process and systematizing knowledge needed, and finally analyzing contents information that establish information among industrial facilities in Design phase which is the weakest part of domestic companies.

Gradational Risk Management in Procurement Phase for Plant Projects (플랜트 프로젝트의 구매조달 단계별 리스크 분석에 관한 연구)

  • Na, Sung-Yub;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.3
    • /
    • pp.59-65
    • /
    • 2009
  • In the plant EPC project, the procurement work can be considered as the most important part that affects the success or failure of project as it has the closest mutual influence in every execution process of the project. Procurement takes up generally 60% ~ 70% of the entire project budget and the current trend of plant EPC project becoming larger in scale and a variety of process technology being applied. So, it is needed to identify the risks that are expected to occur according to the stages of procurement work, namely, proposal stage, manufacturer selection and purchasing agreement stage, expediting the process management of manufacturer stage, inspection stage and logistics & transportation stage. The management of observation and control of the risks should be performed with the response techniques which are 'avoid',' transfer'and' mitigate'.

  • PDF

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

A Systems Engineering Approach to FEED Work Process Development for Refinery Plant (시스템 엔지니어링 접근 방법에 의한 정유 플랜트의 FEED 수행 업무 프로세스 개발)

  • Kim, Sun Young;Cha, Jae-Min;Kim, Junpil;Suh, Suk-Hwan;Sur, Hwal Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.10 no.1
    • /
    • pp.1-15
    • /
    • 2014
  • Refinery plant producing petroleum products from crude oil has significantly contributed to the creation of the national interests as a leading engineering industries. However, domestic Engineering Procurement Construction (EPC) companies are facing heavy competition for orders. Domestic EPC companies as EPC contractors are faced with some problems such as undertaking responsibility for FEED packages produced by other FEED companies. But domestic EPC contractors are unfamiliar to development and validation of FEED packages. It causes poor profitability and lower competitiveness of domestic companies. It is necessary for domestic companies to have capability to perform FEED activities in order to overcome these limitations instead of focusing on EPC phase after FEED phase. The systematic procedure is needed to perform the FEED activities, however, there are present difficulties on it due to the lack of experience in FEED packages development which require various engineering knowledge of chemical process, mechanics, electrics, instrumentation, civil engineering. This study has applied systems engineering method which is multi-disciplinary approach to derive and verify the solution to meet the customer's needs when the complex system is developed to task execution process development of FEED activities for refinery plant. The problems that may occur in the future were identified in advance by taking into account the various stakeholders and system context through the application of systems engineering. It helps to develop the task execution process systematically. The developed task execution process of FEED activities is planned to make effectiveness verified by engineering professionals experienced in FEED and continually enhance this process by field application.

A Study on Establishing Facility and Asset Information from Construction Phase (유지보수 및 자산관리를 위한 시공단계 정보 활용에 관한 연구)

  • Bae Young-Min;Kwahk Kil-Jong;Kim Soo-Jung;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.529-532
    • /
    • 2003
  • Efficiency and efficient management on maintenance/repair/operation (MRO) phase is getting important with advance in technologies and complex functionalities of building and facility. Using software systems as well as advanced hardware systems in MRO area is spreading along with this trend to take advantage of information technology. Information of building and facility for MRO phase is derived from engineering/procurement/construction (EPC) phase. But most current commercial software systems in EPC and MRO are focusing on their own phase, which arise lack of consistency of information from EPC to MRO phase. But, the information system now used at the MRO phase stop flowing the building and the facilities information and then newly create. Moreover, from all asset management point of view, asset particulars such as the structures and equipments are different the value fluctuation. In order to reflect these information rationally, the construction costs are correctly distributed and the initial price of the asset particulars have to be estimated. In this study, develop the information model which can apply the cost information at the EPC phase to the MRO phase.

  • PDF

Development of Web-based Facility Management System by utilizing Information in Construction Phase (시공단계 정보 활용을 통한 웹 기반 유지관리 시스템 개발)

  • Bae Young-Min;Kwahk Kil-Jong;Kim Soo-Jung;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.99-106
    • /
    • 2004
  • Efficiency and efficient management on maintenance/repair/operation (MRO) phase is getting important with advance in technologies and complex functionalities of building and facility, Using software systems as well as advanced hardware systems in MRO area is spreading along with this trend to take advantage of information technology. Information of building and facility for MRO phase is derived from engineering/procurement/construction (EPC) phase. But most current commercial software systems in EPC and MRO are focusing on their own phase, which arise lack of consistency of information from EPC to MRO phase. But, the information system now used at the MRO phase stop flowing the building and the facilities information and then newly create. Moreover, from an asset management point of view, asset particulars such as the structures and equipments are different the value fluctuation. In order to reflect these information rationally, the construction costs are correctly distributed and the initial price of the asset particulars have to be estimated. In this study, develop the information model which can apply the cost information at the EPC phase to the MRO phase.