• Title/Summary/Keyword: EMS/SCADA

Search Result 53, Processing Time 0.029 seconds

Current trends in the Scada/EMS (Scada/EMS 기술동향 검토)

  • Yoon, Kap-Koo;Han, Young-Suk;Han, Seol-A
    • Proceedings of the KIEE Conference
    • /
    • 1992.07a
    • /
    • pp.130-132
    • /
    • 1992
  • Many different industries use Supervisory Control and Data Acqisition/Energy Management Systems (Scada/EMS) to guide a wide range of operations and processes. This paper provides an overview of the functions of Scada/EMS and the fundamentals of operation of Scada/EMS. The paper concludes with the current trends toward open systems, distributed architecture, improved man-machine interface(MMl), advanced applications, artificial intelligence(AI), distribution automation, smarter remote terminal units(RTUs)and expended system scope.

  • PDF

A Study of Security Certification and Accreditation for DNP3 linkage section in EMS/SCADA (EMS/SCADA의 DNP3 연계구간 보안성 평가·인증 기술 연구)

  • Kim, Jongwan;Shon, Taeshik
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.25 no.3
    • /
    • pp.703-713
    • /
    • 2015
  • The linking system between the control system and the field devices in the existing EMS/SCADA, in order to increase the reliability of the data, and access control through the separation of external network. Currently, There is a tendency that the need for connection to an external network that takes into account the economic aspect, systematic management and efficiency of operations is increasing. Such is evolved linkage section, is to have more security vulnerabilities than in the past, Eventually communication EMS/SCADA linkage section requires special management method. In this paper, taking into account the domestic environment, were presented the security Certification and Accreditation technology that was applied to serial DNP3 and TCP/IP based DNP3 that are mainly used in EMS/SCADA linkage section. Presented to security of Certification and Accreditation technology, divided into Resource Robustness Test and Malicious Packet Test for evaluate the safety. Each of the security requirements and evaluation method in proposed technology, is an attempt to present the differentiation of the existing Certification and Accreditation technology.

Development of Real Time SCADA Database in Korean EMS (한국형 EMS의 실시간 SCADA 데이터베이스 설계에 관한 연구)

  • Lee, Hyo-Sang;Kim, Wan-Hong;Park, Min-Ryung;Yoon, Yeo-Jun
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.404-405
    • /
    • 2007
  • 한국의 전력계통 운영환경에 적합한 한국형 에너지 관리 시스템(이하 K-EMS)의 개발에 있어 실시간 SCADA 데이터베이스의 설계는 EMS의 성공을 가늠하는 핵심 요소이다. 특히, 계통규모가 커지고 다양한 계통 어플리케이션들이 개발, 활용됨에 따라 방대한 양의 현장 데이터를 실시간으로 취득하여 관리하고 어플리케이션에 필요한 데이터 인터페이스를 제공하는 EMS SCADA 데이터베이스의 중요성이 증대되고 있다. 이에 K-EMS 개발의 일환으로 개발 중인 K-EMS SCADA 시스템의 개요 및 데이터베이스 설계에 대해 소개하고자 한다

  • PDF

DATA LINKS BETWEEN EMS AND SCADA SYSTEMS (EMS - SCADA 자료연계)

  • Lee, Kyung-Jae;Yu, Sung-Chul;Kim, Yeong-Han;Lee, Hyo-Sang
    • Proceedings of the KIEE Conference
    • /
    • 1987.11a
    • /
    • pp.109-113
    • /
    • 1987
  • This paper briefly introduces a strategy of data links between EMS and SCADA systems for the KEPCO's EMS project. For the data links, front end/communication processors are adopted that provide for protocol conversion and communication processing in parallel with EMS/SCADA processing. The data link configuration for a communication channel is point to point links. The EMS - hardware and software - has capability of handling links utilizing both bisync protocol and X.25 (Level 1 and 2)protocol for the data link protocol.

  • PDF

Preparation of Reliable Measurement Data by Using State Estimation (상태추정을 이용한 고 신뢰도 측정데이터 확보방안 연구)

  • Kim, Hong-Rae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.8 no.5
    • /
    • pp.1020-1025
    • /
    • 2007
  • EMS(energy management system) and SCADA(supervisory control and data acquisition) systems are used for reliable and efficient operation of electrical power systems. Various functions in EMS such as power flow, contingency analysis, security analysis essentially need accurate data set for reliable operation. State estimation can be a tool for providing these data. In this paper, programs for observability analysis and bad data processing are developed. Fundamental algorithms are introduced and validity of the proposed techniques is inspected with test cases.

  • PDF

A Study on the Network Architecture for KEPCO SCADA Systems (한국전력 스카다 시스템의 네트워크 구조에 대한 연구)

  • Ryo, Woon Jong
    • Industry Promotion Research
    • /
    • v.2 no.2
    • /
    • pp.1-6
    • /
    • 2017
  • SCADA (Supervisory Control and Data Acquisition) System was first introduced to the Seoul Electricity Authority, which manages the transportation part among the three business fields that produce, transport and supply electric power in Korea. Has been using the data link with 1200 bps and 9600 bps in 5 protocols such as HARRIS 6000, BSC, HDLC, L & N and Toshiba by configuring 3 layers of EMS, SCADA and RTU computer equipments in 1: N radial form. This paper presents the OSI standard network packet flow, analyzing DataLink and Network Layer, and presents a KEPCO SCADA network model composed of X.25 high - speed communication network using 3 layers of network. We proposed a future SCADA communication structure that improved the current SCADA communication structure, defined the SCADA DB structure, introduced the concept of the remote SCADA gateway to the SCADA functional structure, applied the standard communication protocol, Multiplexing of surveillance and control in other local facilities and ensuring communication openness.

PROJECT MANAGEMENT FOR ENERGY MANAGEMENT SYSTEMS (에너지 관리(管理)시스템의 사업관리(事業管理))

  • Lee, Kyu-Sun;Yoon, Kap-Koo
    • Proceedings of the KIEE Conference
    • /
    • 1983.07a
    • /
    • pp.174-176
    • /
    • 1983
  • This paper explains about general considerations and project management for a modern electric utility EMS/SCADA system. This paper also attempts to help engineers in the following situation: They are given the task of specifying, buying and installing a EMS/SCADA system. When do they start? What tools/texts/guidelines are available to help them out? If it is a large system, methodical project management is necessary. What are the critical tasks to be undertaken? When should they been done and how does their timing impact the whole project.

  • PDF

Data Mapping Structure for EMS Application Function Development in SCADA (원격 제어 감시 시스템에서의 EMS 응용 기능 개발을 위한 Data Mapping 구조)

  • Choi, Chul-Hwan;Kim, Pil-Suk;Bahng, Soon-Jeong;Shin, Yong-Hark
    • Proceedings of the KIEE Conference
    • /
    • 2004.11b
    • /
    • pp.211-213
    • /
    • 2004
  • 실시간 데이터를 대상으로 하는 전력 계통응용 프로그램을 개발하기 위해서는 SCADA 시스템이 다루는 Point Data를 Device Level의 속성으로 해석할 수 있어야 한다. 본 논문에서는 이러한 관계를 나타낼 수 있는 Mapping 기법을 제안하고 실제 응용 프로그램에 적용한 사례를 소개하고자 한다.

  • PDF

EMS 및 SCADA와 전력계통운용

  • 김영한;이효상
    • 전기의세계
    • /
    • v.38 no.12
    • /
    • pp.32-36
    • /
    • 1989
  • 전력계통운용에서는 EMS 및 SCADA시스템은 이제 없어서는 안될 필수 불가결한 도구가 되고 있다. 우리나라에서는 전력계통 규모의 확대와 전력계통 운용기술의 발달에 발맞추어 전력계통 제어시스템에 대한 여러단계의 현대화 과정을 통하여 아시아에서는 물론 세계적으로 진보된 에너지관리시스템을 설치하였으며 SCADA와의 계층제어체계를 수립하고 또한 현재 가능한 모든 신기술의 응용소프트웨어를 갖춤으로써 고품질의 전력을 안정되게 공급하는데 이 시스템이 크게 기여하리라 생각된다. 그러나, 전력계통은 점차 더 복잡 다양하게 확대되어갈 것이고 수용가는 더욱더 고품질의 전력에 대한 안정적 공급의 요구가 증대되리라 여겨짐에 따라 전려계통 제어시스템도 전기 품질을 개선할 수 있는 응용 기능 즉, 전압안전도를 고려한 상정사고해석, 신속한 사고복구를 위한 인공지능 복구제어 그리고 예방제어를 위한 신기술등을 보강해 나가야함은 물론 설비 측면에서도 전기 품질에 직접 영향을 주는 기상에 관한 신속, 정확한 예측정보를 얻을 수 있도록 전력계통 기상정보시스템을 도입해야 할 것이다.

  • PDF

해외동향

  • Korea Electrical Manufacturers Association
    • NEWSLETTER 전기공업
    • /
    • no.97-5 s.174
    • /
    • pp.19-41
    • /
    • 1997
  • PDF