SCADA (Supervisory Control and Data Acquisition) System was first introduced to the Seoul Electricity Authority, which manages the transportation part among the three business fields that produce, transport and supply electric power in Korea. Has been using the data link with 1200 bps and 9600 bps in 5 protocols such as HARRIS 6000, BSC, HDLC, L & N and Toshiba by configuring 3 layers of EMS, SCADA and RTU computer equipments in 1: N radial form. This paper presents the OSI standard network packet flow, analyzing DataLink and Network Layer, and presents a KEPCO SCADA network model composed of X.25 high - speed communication network using 3 layers of network. We proposed a future SCADA communication structure that improved the current SCADA communication structure, defined the SCADA DB structure, introduced the concept of the remote SCADA gateway to the SCADA functional structure, applied the standard communication protocol, Multiplexing of surveillance and control in other local facilities and ensuring communication openness.
한국전력의 전력을 생산, 수송, 공급하는 3가지 업무분야 중 수송부분을 관리하는 서울전력관리처에 SCADA (Supervisery Control And Data Acquisition) System이 1980년 처음 도입된 후 중앙급전소, 지역급전소, 변전소 업무를 EMS, SCADA, RTU 컴퓨터 설비 3계층의 1:N 식 방사상 형태로 구성하여 HARRIS 6000, BSC, HDLC, L&N, 도시바 등 5개 Protocol로 1200 bps와 9600 bps로 Data Link를 이용하여 왔다. 본 연구는 OSI표준네트워크패킷흐름을 도시하여 DataLink와 Network Layer를 분석하고, 네트워크 3계층을 사용하는 X.25 고속 통신망으로 구성된 한국전력 SCADA 네트워크 모델을 제시하였으며, 통신망을 시험 평가하였다. 현재의 스카다 통신구조를 개선한 미래 스카다 통신구조를 제시하고, SCADA DB 구조를 정의하고, 스카다 기능 구조에 원격 SCADA 게이트웨이 개념을 도입 표준 통신프로토콜을 적용 하였다. 따라서 데이터 전송시간 제약완화, 타지역 타 설비에서의 감시 및 제어의 다중화 및 통신 개방성을 확보하도록 하였다.