• Title/Summary/Keyword: EFFECTIVE MANAGEMENT

Search Result 12,439, Processing Time 0.044 seconds

Challenges to Prevent in Practice for Effective Cost and Time Control of Construction Projects

  • Olawale, Yakubu A.
    • Journal of Construction Engineering and Project Management
    • /
    • v.10 no.1
    • /
    • pp.16-32
    • /
    • 2020
  • Cost and time control of projects is important in preventing project failure. However, achieving effective cost and time control in practice is often challenging. The challenges of project cost and time control in practice are investigated by carrying out a questionnaire survey on the top 150 construction contractors in the UK followed by in-depth semi-structured interviews of practitioners from 15 construction companies in the country. Quantitative analysis reveals that design change is the most important factor inhibiting the ability of UK contractors from effectively controlling both the cost and time of construction projects. Four of the top five factors inhibiting effective cost control are also the top factors inhibiting effective time control albeit in a different order. These top factors-design changes, inaccurate evaluation of project time/duration, risk and uncertainty, non-performance of subcontractors and nominated suppliers were also found to be endogenous factors to the project. Additionally, qualitative analysis of the interviews reveals 16 key challenges to prevent for effective project cost and time control in practice. These are classified into four categorised based on where they stem from as follows; from the organisation (1. Lack of integration of cost and time during project control, 2. lack of management buy-in, 3. complicated project control systems and processes, 4. lack of a project control training regime); from the construction management/project management approach (5. Lapses in integration of interfaces, 6. project control not being implemented from the early stages of a project, 7. inefficient utilisation and control of labour, 8. limited time devoted to planning how a project will be controlled at the outset); from the client; (9. Excessive authorisation gates, 10. use of adversarial and non-collaborative forms of contracts, 11. communication problems within client set-up, 12. obstructive client representatives) and; from the project team (13. Lack of detailed/complete design, 14. lack of trust among the project partners, 15. limited time devoted to project control on site, 16. non-factual reporting). The study posits that knowledge of these project control inhibiting factors and challenges is the first step at ensuring they are avoided and enable the implementation of a more effective project cost and time control process in practice.

A Study on Knowledge Discovery and Creation Techniques for Knowledge Management in SI Industry (SI산업에서의 지식경영을 위한 지식발견 및 창출 기법에 관한 연구)

  • Kim, Hyun-Su
    • Asia pacific journal of information systems
    • /
    • v.11 no.2
    • /
    • pp.99-119
    • /
    • 2001
  • The creation of knowledge is a major concern for knowledge management practice. In particular, effective knowledge creation is one of the critical success factor in SI(System Integration) industry. This paper designs a framework of effective knowledge creation methods for organizations in SI industry. First, we give a comprehensive survey on knowledge creation and discovery methods. And the structure of SI knowledge has been analysed. Also, characteristics of knowledge management processes of SI industry have been surveyed and analysed. A framework for effective knowledge creation of SI organization has been discussed based on the characteristics of SI knowledge and knowledge management processes. Organizational issues and theoretical issues of the methods have been discussed. Future research will be needed to expand the current framework and to examine the effectiveness of the proposed framework.

  • PDF

A Study on Effective Management Scheme for Soil and Groundwater Contaminated by Radioactive Materials Due to Nuclear Accidents (원전사고에 따른 토양.지하수 방사성오염의 효과적인 관리 연구)

  • Kim, Hee-Joo;Hyun, Yun-Jung;Kim, Young-Ju;Hwang, Sang-Il
    • Journal of Soil and Groundwater Environment
    • /
    • v.16 no.6
    • /
    • pp.113-121
    • /
    • 2011
  • In this study, we suggested the management scheme of analyzing the national and oversea related policy against soil and groundwater contamination by radioactive materials due to nuclear accidents. In Korea, we need to remedy swiftly the contaminated land due to intensive land development demand. So, we need to develop more effective management scheme to recover actively the land contaminated by radioactive materials. We require to improve monitoring network, to expand media-specific monitoring system, to prepare management system for remediation of contaminated land, and to develop flow work for soil and groundwater remediation.

E2GSM: Energy Effective Gear-Shifting Mechanism in Cloud Storage System

  • You, Xindong;Han, GuangJie;Zhu, Chuan;Dong, Chi;Shen, Jian
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.10 no.10
    • /
    • pp.4681-4702
    • /
    • 2016
  • Recently, Massive energy consumption in Cloud Storage System has attracted great attention both in industry and research community. However, most of the solutions utilize single method to reduce the energy consumption only in one aspect. This paper proposed an energy effective gear-shifting mechanism (E2GSM) in Cloud Storage System to save energy consumption from multi-aspects. E2GSM is established on data classification mechanism and data replication management strategy. Data is classified according to its properties and then be placed into the corresponding zones through the data classification mechanism. Data replication management strategies determine the minimum replica number through a mathematical model and make decision on replica placement. Based on the above data classification mechanism and replica management strategies, the energy effective gear-shifting mechanism (E2GSM) can automatically gear-shifting among the nodes. Mathematical analytical model certificates our proposed E2GSM is energy effective. Simulation experiments based on Gridsim show that the proposed gear-shifting mechanism is cost effective. Compared to the other energy-saved mechanism, our E2GSM can save energy consumption substantially at the slight expense of performance loss while meeting the QoS of user.

An Hierarchical Structure Analysis of Hospital Selection Attributes (병원 선택 속성간의 계층적 구조 분석)

  • Cha, Jae-Bin;Lee, Hoon-Young
    • Health Policy and Management
    • /
    • v.21 no.2
    • /
    • pp.263-278
    • /
    • 2011
  • As the competition among hospitals become intensified, hospital management is required to carry out more effective marketing and positioning of the hospital. Successful positioning of a hospital requires the knowledge about how the concrete attributes inherent in the medical service associated with the customer values that customers seek eventually in the medical service. Thus, it is required for hospital management to understand which hospital attributes should be emphasized in order to improve the customer values. The hierarchical structure of service attributes can provide valuable information about effective positioning and advertising. To obtain such knowledge, we employed the order analysis technique as an objective means-end chain method. Order analysis is useful for identifying the causal structure among attributes. Thus, we can examine the underlying causal relationship and eventually the vertical structure of hospital selection attributes. For this study, we conducted a survey to obtain 370 responses for the analysis. The result suggests that hospital management had better increase the scale of hospital, improve the services of health care providers, and modernize the hospital facilities and equipments so as to enhance customer values and eventually to lead them to recommend the hospital to others. Our findings would provide the valuable information for hospital management to develop the more effective hospital positioning and marketing strategies.

Building up an IT Service Management System through the ISO 20000 Certification

  • Park, Jung-Hoon;Kim, Hwan-Min
    • International Journal of Knowledge Content Development & Technology
    • /
    • v.2 no.2
    • /
    • pp.31-45
    • /
    • 2012
  • This study prepared a foundation to provide high-quality services in a stable and effective way to meet the customer expectations, by building up and establishing an ISO 20000 certified IT service management system and protecting the information assets from various threats through effective system operation that meets the requirements of international standards, in order to ensure the reliability and stability of NDSL public services provided by KISTI Information Service Center and to enhance the customer satisfaction.

산업부문 에너지 관리기술

  • 김상현;전원표;김동국
    • Proceedings of the Korea Technology Innovation Society Conference
    • /
    • 2000.11a
    • /
    • pp.161-175
    • /
    • 2000
  • This study includes the fundamental planning of the sectoral management technology in energy distribution system so that the industry itself would be willing to participate for the effective energy conservation in its own sector. Furthermore guidlines for the effective energy management techniques have been presented by first analyzing the energy consumption structures, the energy loss problems, the energy conservation status and the technology demands, and second classifying, according to the energy distribution system, the energy source management, the energy generation & conversion facilities, the energy transportation & storage facilities, the energy consumming facilities and the waste energy management, etc. in the industrial sector.

  • PDF

Test and Evaluation Requirement Management System for Korea Tilting Train eXpress using Model Based System Engineering Tool (모델 기반 시스템엔지니어링 도구를 이용한 한국형 틸팅열차 시험평가 요건관리 체계)

  • Lee, Tae-Hyung;Kim, Seog-Won
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.170-173
    • /
    • 2006
  • Requirement management is an essential process that has a significant influence on the project success. Due to the evolutionary development nature of requirement, the effective management for requirement must include change process and configuration control. This paper describes how to implement effective requirement management process to the Korea Tilting Train eXpress development with the application of a model based systems engineering tool.

  • PDF

Effective Management of Power System by Demand Control (수요 제어에 의한 전력 시스템의 효율 운전)

  • 최진원
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2003.11a
    • /
    • pp.77-79
    • /
    • 2003
  • For the management of maximum demand power, power control system that is consist of CCMS(Central Control and Management System) and MCCS(Minimum Cost Control and management Software) is proposed. MCCS has the basic functions of the set of target power and the enrollment of load control logic. And also MCCS give the simulation of Power rate that help more effective Demand Control.

  • PDF

A Study on the Effective Management for the International Sea-borne Container (국제 해상 컨테이너의 운용방안에 관한 연구)

  • 김성국;신한원
    • Journal of the Korean Institute of Navigation
    • /
    • v.19 no.1
    • /
    • pp.33-48
    • /
    • 1995
  • In the process of containerization, the problem of regional maldistribution of container management plan arises seriously due to several factors like a number of unbalances of containers between loading and discharging ports. This study focus on the minimizing cost. This study is composed of two models which in effective management decision making show decision of the number of containers and transfer of empty containers. One is decision of the number of containers which carriers should possess by appropriate forecasting and the other is effective management decision making which includes the transfer of empty containers on calling ports. This study has suggested as follows, First, the Time Series analysis method, especially the "Exponential Smooting with Trend Adjustment" was used to forecast the trade volumes for the designated traffic route. Second, the Time Series analysis method in deciding the optimal number of owned container at the unbalances trade situation between East Bound and West Bound service, most important variables were found such as total traffic volume, the calling interval at a port, the number of days of voyage and the length of stay on shore of container for the optimal number of owned container. Third, effective management decision making model, which makes it possible to analyze the impacts of change in important matters such as lease and positioning policy, and actually influence decision making.on making.

  • PDF