• Title/Summary/Keyword: EDG System

Search Result 23, Processing Time 0.017 seconds

Development of Diesel Generator Excitation System in the Nuclear Power Plant (원전 비상디젤발전기 여자시스템 개발)

  • Shin, Man-Su;Ryu, Ho-Seon;Lee, Joo-Hyun;Im, Ik-Heon;Jeong, Tae-Won
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.2
    • /
    • pp.397-406
    • /
    • 2010
  • Because diesel generator excitation systems in the nuclear power generating station are included among safety related c1asses(and Class 1E), they have been supposed to apply in the nuclear power generating stations through equipment qualification by nuclear law and so on. So, they has been controlled and assured completely by quality assurance throughout the total development journey. This paper looks into the journey of development of diesel generator excitation systems in the nuclear power generating station.

Performance upgrade and analysis report for nuclear safety related emergency diesel generator speed control system (원전 안전등급 비상디젤발전기 속도제어시스템 성능개선 및 분석에 관한 연구)

  • Kim, Y.S.;Jeon, I.Y.;Lee, S.G.;Kim, C.K.;Ahn, J.W.
    • Proceedings of the KIPE Conference
    • /
    • 2005.07a
    • /
    • pp.581-583
    • /
    • 2005
  • The paper is final report for speed control upgrade and analysis report which recently performed on PWR NPP safety related EDG KHNP Ulchin NPP No.2 Unit. The upgraded system includes more beneficial function like as 'Slow start with starting ramp', 'Generator load sensing & control capability' and 'Emergency ramp during slow start'. This paper shows functional operation of slow start regime according to NRC regulatory guide which guide regulation to NPP safety related environment.

  • PDF

Governor upgrade for PWR NPP safety related Emergency Diesel Generator (경수로형 원자력 안전등급 비상디젤발전기)

  • Kim, Yoon Sik;Jeon, Il-Young;Song, Dong-Young;Kim, Chang-Kook;Sim, Su-Il
    • Proceedings of the Korean Society of Marine Engineers Conference
    • /
    • 2005.06a
    • /
    • pp.293-298
    • /
    • 2005
  • The following is final report for governor upgrade for PWR NPP safety related EDG Kori NPP No.2 Unit. The upgraded system includes more beneficial function like as "Slow start with starting ramp", "Generator load sensing & control capability" and "Emergency ramp during slow start". This paper show functional operation of slow start regime according to NRC regulatory guide which guide regulation to NPP safety related environment.

  • PDF