Recently, there have been various domestic construction activities related to the reclamation of the dredged soils to expand the land use. However, the reclaimed grounds made of the dredged soils cause various problems due to highly compressible and low shear strength nature. Particularly, this nature induces huge problems in case of the harbor facilities and road construction on the reclaimed sites. Furthermore, in the reclamation activities, the marine dredged soils are often used instead of the well sorted sand, which induces problems of compressibilities. Therefore, in this study, the mechanical characteristics of artificial soil mixture of kaolinite representing the marine dredged soils and the pond ash. A large consolidometer is designed and manufactured to produce the artificial soil mixture. To represent various mixing ratio between the fly ash and bottom ash in the pond ash, six samples with the same stress history are made with different mixing ratio among kaolinite, bottom ash and fly ash. Isotropically consolidated and undrained compression tests are performed to investigate the shear characteristics of soil mixtures. Based on the experimental results, as the components of mixed ash increase, the friction angle increase and the cohesion values decrease. Also, the porepressure parameters at failure, Af increase with the mixing components of the pond ash. The portion of bottom ash has more impact on the shear behavior than that of fly ash.
Proceedings of the Korean Society of Soil and Groundwater Environment Conference
/
2000.05a
/
pp.41-45
/
2000
Geotube is made of permeable but soil-tight geotextile, hydraulically filled with soil include dredged sand and mud, which has been successfully applied in hydraulic and coastal engineering projects. Ceotube method is getting popular and being used a lot in many countries of the world because of the simplicity of the placement and construction, cost effectiveness and minimum impact on the environment, and enable to store & isolate contaminated materials as obtained by harbor dredging. Laboratory tests and field construction were performed to determine the design methodology and construction procedures. From the results of laboratory and field construction, the retention ratio of solid particle is a minimum 86%. The minimum permeability and the tensile strength of geotextile are $\alpha$ x 10$^{-4}$ cm/sec and 20t/m, respectively Also, based on the environmental test results, it can be concluded that this method does meet the Korean EPA standards.
Proceedings of the Korean Geotechical Society Conference
/
2006.03a
/
pp.1120-1125
/
2006
Larger area will be constructed in a harbor land and container terminal which are constructed in reclaimed land using the dredged materials. Soil improvement work is to be carried out including constructibility, in which is monitoring devices, measuring frequency, installations etc. The ground water tables in the reclaimed area are affected by the several factors which are design reclamation level, consolidation settlement, remaining surcharge pressure and remaining excess pore water pressure. The plan wii be drawn up in which monitoring results for the ground water tables are capable to provide the reliable ground water table when designers and civil engineers construct the harbor structures considering constructibility.
Proceedings of the Korean Geotechical Society Conference
/
2000.03b
/
pp.504-511
/
2000
Geotube is a tube made of permeable but soil-tight geotextile, hydraulically filled with soil include dredged sand and mud, which has been successfully applied in hydraulic and coastal engineering projects. This method is getting popular and used a lot in the advanced countries of the world because of economical, useful, and enable to store and isolate contaminated materials as obtained by harbor dredging. Laboratory and pilot scale in-situ tests were performed to determine the design methodology and construction procedures. From the results of laboratory and in-situ model tests, the retention ratio of solid particle is minimum 86% and minimum permeability and tensile strength of geotextile is ${\alpha}$${\times}$10$\^$-2/ and 20 t/m, respectively. Also, based on the environmental model test results, it can be concluded that this method does meet the Korean EPA standards.
Proceedings of the Korean Geotechical Society Conference
/
2006.03a
/
pp.322-329
/
2006
On the way of construction in harbor area, scourin problems took place slowly failure of embankment in the beginning of construction in sites. For studying on the scouring properties during revetment construction in silty sand soil layers, this paper is carried out on lessons of case studies of numerical seepage analysis, scouring countermeasures in dredged landfill area.
There are many reclamation projects domestically and internationally which requires large quantity of reclaimable materials. To provide enough reclaimable soils which are limited in land, there have been various research focusing on the dredged soils in the marine environments. As a part of this research, a GIS based 3D dredging reclamation visualization program was developed for the volume estimation of dredged soils in 2015. The developed program is based on the digitized spatial information of the site investigation data with a consideration of the reliability of the data. Prior to the validation with the comparisons with the actual dredged volume measurement data, the developed program was compared with the commercial 3D visualization program with 3D visualized results from the test site near the Gunjang harbor. The validation of the developed program was performed in terms of the degree of visualized precision, the sectional and profiling of soil layers and the dredged volume estimation results. Based on the comparisons, both commercial and developed program show similar dredged volume with minor discrepancies in soil layers.
Journal of Fisheries and Marine Sciences Education
/
v.23
no.2
/
pp.210-220
/
2011
The Keyongin Inland waterway will connect with Han-River and the Northen part of the Incheon-seaway and this way will be opened at the early of October this year. In this regard, the Incheon container terminal is under constructing for 1,000 TEU & 550 TEU container vessels at the place of leftside of the Seohae lockgate. However the terminal length is not still fixed due to at a great expenses of construction and dosposal matter of the dredged soil. So this paper will suggest the optimum berth length by using the full mission shiphandling simulator for berthing and unberthing shipmaneuvering. And also evaluates the design standard of harbor construction rules and analysis optimum berth length against ship's length for safe shiphandling at terminals in accordance with the customary practices of the major ports in Korea.
Grounwater level applied on dredged and reclaimed clay layer was assumed to be the same value under design criterion as field test one, but actually differences are found through the monitoring test. In this study, a case study of measuring residual groundwater level is performed in ground improvement construction of Gwangyang container terminal and hinterland. With priority given to residual groundwater level measured during construction and management period of 9 years, it is investigated that residual groundwater level (R. GWL) could be applied reasonably to the design, construction, and use stages of the container harbor and land development.
In this study, for the stability analysis of marine embankment, the slope stability analysis and possibility of lateral movement with the marine embankment in ${\bigcirc}{\bigcirc}$harbor were carried out. In order to simulate the practical site condition, the expected maximum sea water level and maximum embankment height were assumed for these analyses. For the evaluation of soil properties, field test, laboratory test, and especially chemical composition analysis were performed for the this analysis. Based on these test results, the soil parameters were determined by applying ground improvement concept under columnar stabilized ground condition and also the effect of staged backfilling was considered under the dredged ground condition. For the optimal design, the stability analyses of embankment with changed height and unchanged height were performed under unimproved soil condition. The result showed that both cases were unstable not only with slope stability but also with lateral movement. Therefore, Deep Mortar Piling was applied for stability analysis and this result was safe. As the conclusion, the deep mortar piling method was suggested as reinforced foundation design for this site.
Lee Ji Wang;Maeng Jun Ho;Cho Kwang Woo;Yang Gwon Weol;Kim Young Seup
Journal of the Korean Society for Marine Environment & Energy
/
v.6
no.2
/
pp.46-53
/
2003
In order to analyze the movement characteristics of suspended solid(SS) in harbor construction, we investigate the generation and movement processes of the SS for the landfill construction by direct casting method and the grab dredging construction which is the most frequent process in harbor construction. We find that the SS is generated into a very high concentration right after the direct casting of landfill soil and continued up to 60 minutes in the landfill construction using the direct casting method with dredged materials by a ship of 700-tonnage. In the grab dredging construction, the SS is generated in a high density of concentration near at its source regardless of water depth, formed belt and diffused up to 700m along the trajectory of tidal current. Based on the result of the present study, it is recommended for the mitigation of SS generation that the silt protector be deployed near at construction site close enough to block the diffusion of SS and the body length of silt protector be long enough to mitigate the SS diffusion in the bottom layer.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.