• Title/Summary/Keyword: Downtown Construction

Search Result 191, Processing Time 0.024 seconds

A Stability Case on the Deep Rock Excavation Site in Urban Area by Automatic Monitoring System (도심지 대심도 암반굴착공사에서의 자동계측 활용에 의한 붕괴방지 사례)

  • Kim, Tae-Seob;Jo, Nam-Shin;Jung, Chang-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1433-1437
    • /
    • 2010
  • The deep excavation work in Korean downtown is almost excuted near by existing structures and utility lines because of the diminution of available yard for construction. So, it was required more and more that the accurate control of displacement on the earth retaining system for minimizing the popular complaint and the damage from constructional accident. Automatic monitoring system is adopted in fracture zone for real time monitoring. In addition, Face mapping is carried out on the face of fracture zone according to excavation sequence. As the result of automatic monitoring system and face mapping, we was able to take the necessary reinforcement and changing excavation method within suitable time. This paper is informed about a stability case on the deep rock excavation site with fracture zone in urban area by automatic monitoring system.

  • PDF

Shaking Table Tests of 1/12-Sale R.C. Bearing-Wall system with Bottom Piloti Frames (1/12 축소 철근콘크리트 상부벽식-하부골조 건축물의 진동대 실험)

  • 이한선;고동우;권기현;김병현
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2001.09a
    • /
    • pp.407-414
    • /
    • 2001
  • The severe shortage of the available sites in the highly developed downtown area in Korea necessitates the construction of high-rise buildings which meet the need of residence and commercial activity simultaneously. The objective of this study is to investigate the seismic performance of this type of building structures. For this purpose, two 1 :12 scale 17-story reinforced concrete model structures were constructed according to the similitude law, in which the upper 15 stories have a bearing-wall system while the lower 2-story frames have two different layouts of the plan The one is a moment-resisting frame system and the other is a moment-resisting frame system with a infilled shear wall. Then, this model was subjected to a series of earthquake excitations. The test results show that the existence of shear wall reduced the shear deformation at the piloti frame, but has almost the negligible effect on the reduction of the overturning-moment angle.

  • PDF

Stability of Punching Shear and Analysis Fatigue Stress of Joint of Low Vibration Floating Slab-Anti Vibration equipment (플로팅 궤도 슬래브-방진장치의 펀칭전단 안정성 및 피로응력 해석)

  • Park, Sung-Jae;Ma, Chang-Nam;Park, Myung-Gyun;Lee, Du-Hwa;Jo, Su-Ik
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1460-1463
    • /
    • 2010
  • Railway has been pointed to the efficiency of transportation, rapid transit, and comfortable train ride. the construction of railway near the downtown area and station building are increasing for maximization of utilization and convenience. but the heavy of transportation and rapid transit lead to increase noise and vibration. The noise and vibration of railway may cause the civil appeal, decline in the serviceability and insufficiency of environmental standard. In this study, floating slab vibration and repeated connection of devices to support joints and fatigue stress analysis of punching shear performance review was conducted to evaluate the safety.

  • PDF

Dynamic Charncteristics for Laternl Strong Wind on Bimodal Tram (바이모달 트램의 횡풍에 대한 동적특성 해석)

  • Kim, Yeon-Su;Lim, Song-Gyu;Mok, Jai-Kyun;Kim, Myoung-Gyu
    • Proceedings of the KSME Conference
    • /
    • 2008.11a
    • /
    • pp.979-983
    • /
    • 2008
  • A bi-modal tram can travel in not only dedicated way but also road so as to reduce construction costs and increase vehicle operation efficiency, whose passenger capacity is 2,500 to 7,000 persons/direction/hour. A bi-modal has an electronic guidance system that knows the location and route of the vehicle, and uses magnetic markers in the road surface for reference. Since a bi-modal tram will be operated in the downtown area, there is some possibility that strong wind occurred between high-rise buildings can produce sudden lateral movement (displacement) of the vehicle to influence its automatic operation controlled by electronic guidance system. For bi-modal tram in the automatic operation mode, lateral movements occurred by strong wind were calculated and analyzed in the dynamic model developed by using the ADAMS. Some useful relations among vehicle speeds, wind speeds, and lateral behaviors were discussed in this paper.

  • PDF

EVALUATION OF GROUNDWATER-STREAM INTERACTION IN AN URBAN STREAM, CHEONGGYECHEON, KOREA

  • Hyun Yun-Jung;Kim Yoon-Young;Lee Kang-Kun
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2005.04a
    • /
    • pp.328-331
    • /
    • 2005
  • Cheonggyecheon, covered and Paved with concretes for about more than 50 years, is a losing stream crossing over the downtown of Seoul, Korea. Due to several environmental and economic Problems about the Cheonggyecheon area, the Cheonggyecheon restoration construction has started in 2003. In restoration of Cheonggyecheon, hydraulic barriers are to be installed so as to reduce stream depletion rates for maintaining the stream flow with supplying a certain amount of water. This study evaluates the groundwater-stream interaction by analyzing stream depletion rates of Cheonggyecheon. Results show that significant stream depletion occurs at the up-midstream where the Seoul subway lines are concentrated. Simulation results demonstrate that both horizontal and vertical hydraulic barriers impeding groundwater flow into subway lines are more efficient than a horizontal barrier only for stream depletion rate reduction.

  • PDF

Development of Foundation of Urban Overpass for Bimodal Tram System (바이모달 트램 운행을 위한 도심지 고가구조물 기초형식 개발)

  • Kang, Tae-Sik;Bae, Eul-Ho;Park, Young-Kon;Yoon, Hee-Taek
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.194-198
    • /
    • 2008
  • The necessities of development of foundation having minimized occupying area and construction time are required for overpass in the downtown area by which bimodal tram will pass a crossway. We are studying a single column drilled pier foundation which is continuous from pier to pile foundation. Due to the increased resisting moment by reinforced steel which is ranged from the upper part of pile to lower part of column above ground, it can be possible to make a smaller pile-section and lessen the bar reinforcing. And for the excavation work is possible with smaller equipment, this foundation has a improved constructability and economical efficiency. This foundation needs smaller amount of concrete and has a small self-weight. It has an effect on improving resistance against earthquake due to improved ductility in addition to improved rigidity by interaction between concrete and steel.

  • PDF

Plan for the Medical and Information Technology University Masterplan (스와질랜드 IT공대 및 의대 부지마스터플랜 계획안)

  • Lee, Ji-Yeon
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2007.11a
    • /
    • pp.163-164
    • /
    • 2007
  • This plan for the Medical and Information Technology University which is built by the will and support of Korea at the small county Kingdom of Swaziland in Africa. As we consider the essential condition of self-supporting of nation is the education for the poor country in culturally and socially. The establish the University in the downtown is a significant work in socially and culturally as the urban infrastructure. Besides, this is presenting the master plan not only educational institution purpose but the place for the desirable communication between regional resident in educational and cultural circumstances. It is the main concept for this plan that flexible arrangement of the lower stories buildings on the gentle hill according to the geographic features of the field, road situation, supporting equipment, construction ability and Building materials.

  • PDF

Analysis of floating Slab Track about Arrangement of Reduction Material of Vibration (방진재 위치에 따른 플로팅 슬래브 궤도의 정적거동분석)

  • Kim, Yong-Jae;Park, Sung-Jae;Jeon, Jung-Su;Park, Myung-Gyun;Lee, Du-Hwa;Park, Man-Ho
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.659-662
    • /
    • 2009
  • Railway has been pointed to the efficiency of transportation, rapid transit, and comfortable train ride. the construction of railway near the downtown area and station building are increasing for maximization of utilization and convenience. but the heavy of transportation and rapid transit lead to increase noise and vibration. the noise and vibration of railway may cause the civil appeal, decline in the serviceability and insufficiency of environmental standard. In this study, floating slab system which is one of the solution to avoid noise and vibration in railway has been introduced, and analyzed floating Slab Track into arrangement of reduction material of vibration. As a result of analysis, It was estimated the bearing installation though slab have not a negative factor and terminal arrangement of reduction material of vibration have advantage for static behavior.

  • PDF

Study on the Application of Semi-open cut Top-Down Construction for Framework (세미 오픈컷 역타공법의 현장적용에 관한 연구)

  • Sho, Kwang-Ho
    • Journal of Korean Association for Spatial Structures
    • /
    • v.11 no.2
    • /
    • pp.129-138
    • /
    • 2011
  • Construction methods for underground structure are classified as bottom-up, up-up, and top-down methods depending on the procedure of construction related to a superstructure. In top-down construction methods, building's main structure is built from the ground level downwards by sequentially alternating ground excavation and structure construction. In the mean time, the main structure is also used as supporting structure for earth-retaining wall, which results in the increased stability of the earth-retaining wall due to the minimized deformation in adjacent structures and surrounding grounds. In addition, the method makes it easy to secure a field for construction work in the downtown area by using each floor slabs as working spaces. However top-down construction method is often avoided since an excavation under the slab has low efficiency and difficult environment for work, and high cost compared with earth anchor method. This paper proposes a combined construction method where semi-open cut is selected as excavation work, slurry as earth -retaining wall and CWS as top-down construction method. In the case study targeted for an actual construction project, the proposed method is compared with existing top-down construction method in terms of economic feasibility, construction period and work efficiency. The proposed construction method results in increased work efficiency in the transportation of earth and sand, and steel frame erection, better quality management in PHD construction, and reduced construction period.

A Development of Cold-Mixed Reclaimed Asphalt Pavement Materials (도로포장용 상온 재생 아스팔트 혼합물 개발)

  • Lee, Jong-Man;Kim, Nak-Seok;Kim, Wan-Sang;Hong, Eun-Cheol
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.3
    • /
    • pp.1-7
    • /
    • 2009
  • In order to use recycled aggregate as pavement base or subbase materials, the US and many other European countries have started research since the early 1980s. Korea also had a recycle idea as a plan for the vast amount of construction wastes due to the downtown renovation in the 1990s, but was not put into practical use. After the resources saving and recycle expedition law in 1994, wastes from construction sites that have more than a certain amount of construction budget were recycled as pavement base and subbase materials, but now, researches are being conducted to use them as paving materials. The use of construction wastes is meaningful in many ways. It helps the natural conservation and aggregate consumption, and also improves pavement performance. This research presents a development of cold-mixed reclaimed asphalt pavement materials using recycled aggregates.