Park, Jong Hoon;Lee, Han Rim;Kim, Chan Hyeong;Kim, Sung Hun;Kim, Seonghoon;Lee, Se Byeong
Progress in Medical Physics
/
v.26
no.1
/
pp.42-51
/
2015
In proton therapy, verification of proton dose distribution is important to treat cancer precisely and to enhance patients' safety. To verify proton dose distribution, in a previous study, our team incorporated a vertically-aligned one-dimensional array detection system. We measured 2D prompt-gamma distribution moving the developed detection system in the longitudinal direction and verified similarity between 2D prompt-gamma distribution and 2D proton dose distribution. In the present, we have developed two-dimension prompt-gamma measurement system consisted of a 2D parallel-hole collimator, 2D array-type NaI(Tl) scintillators, and multi-anode PMT (MA-PMT) to measure 2D prompt-gamma distribution in real time. The developed measurement system was tested with $^{22}Na$ (0.511 and 1.275 MeV) and $^{137}Cs$ (0.662 MeV) gamma sources, and the energy resolutions of 0.511, 0.662 and 1.275 MeV were $10.9%{\pm}0.23p%$, $9.8%{\pm}0.18p%$ and $6.4%{\pm}0.24p%$, respectively. Further, the energy resolution of the high gamma energy (3.416 MeV) of double escape peak from Am-Be source was $11.4%{\pm}3.6p%$. To estimate the performance of the developed measurement system, we measured 2D prompt-gamma distribution generated by PMMA phantom irradiated with 45 MeV proton beam of 0.5 nA. As a result of comparing a EBT film result, 2D prompt-gamma distribution measured for $9{\times}10^9$ protons is similar to 2D proton dose distribution. In addition, the 45 MeV estimated beam range by profile distribution of 2D prompt gamma distribution was $17.0{\pm}0.4mm$ and was intimately related with the proton beam range of 17.4 mm.
This study analyzes the tide deformation of land boundary regions on the east (Region A) and west (Region B) sides of the Ross Ice Shelf in Antarctica using Double-Differential Interferometric Synthetic Aperture Radar (DDInSAR). A total of seven Sentinel-1A SAR images acquired in 2015-2016 were used to estimate the accuracy of tide prediction model and Young's modulus of ice shelf. First, we compared the Ross Sea Height-based Tidal Inverse (Ross_Inv) model, which is a representative tide prediction model for the Antarctic Ross Sea, with the tide deformation of the ice shelf extracted from the DDInSAR image. The accuracy was analyzed as 3.86 cm in the east region of Ross Ice Shelf and it was confirmed that the inverse barometric pressure effect must be corrected in the tide model. However, in the east, it is confirmed that the tide model may be inaccurate because a large error occurs even after correction of the atmospheric effect. In addition, the Young's modulus of the ice was calculated on the basis of the one-dimensional elastic beam model showing the correlation between the width of the hinge zone where the tide strain occurs and the ice thickness. For this purpose, the grounding line is defined as the line where the displacement caused by the tide appears in the DDInSAR image, and the hinge line is defined as the line to have the local maximum/minimum deformation, and the hinge zone as the area between the two lines. According to the one-dimensional elastic beam model assuming a semi-infinite plane, the width of the hinge region is directly proportional to the 0.75 power of the ice thickness. The width of the hinge zone was measured in the area where the ground line and the hinge line were close to the straight line shown in DDInSAR. The linear regression analysis with the 0.75 power of BEDMAP2 ice thickness estimated the Young's modulus of 1.77±0.73 GPa in the east and west of the Ross Ice Shelf. In this way, more accurate Young's modulus can be estimated by accumulating Sentinel-1 images in the future.
Vertical cutoff walls such as steel pipe sheet piles (SPSPs) have been commonly applied for the construction of the offshore waste landfill site. Because the SPSPs are sequentially installed by connecting their joints to those of adjacent piles, their mechanical stability should be ensured against the inherent external forces on the sea. The objective of this study is to evaluate the structural performances of the newly developed types of SPSP joint compared with those of other joint types. The problems of the traditional SPSP joints are investigated, and an advanced joint shape of SPSP, which is named double H with L-T (DHLT) joint, are designed for improving the constructability and maintenance. Full-scale models of the DHLT joint are manufactured, and then its joint areas are filled with grout material. After 28 days of curing time, compressive and tensile strength tests were performed on the joint models and the test results were compared with those of the traditional joints. Experimental results show that the structural capacities of the DHLT joint models are lower than those of traditional joints due to the influence of grout and steel members. In the cases of the compressive strength test, especially, bending occurs on steel H-beam with no distinct cracks in grout due to the asymmetrical structure of joint which has no reaction force. This study shows that the performance of the SPSP joint can be improved by considering the influence factors on the structural capacities estimated by the experimental tests.
Journal of the Korea Institute of Information and Communication Engineering
/
v.9
no.3
/
pp.576-581
/
2005
In this paper. the a-Si:H TFT using ferroelectric of $SrTiO_3$ as a gate insulator is fabricated on glass. High k gate dielectric is required for on-current, threshold voltage and breakdown characteristics of TFT Dielectric characteristics of ferroelectric are superior to $SiO_2$ and $Si_3N_4$. Ferroelectric increases on-current and decreases threshold voltage of TFT and also ran improve breakdown characteristics.$SrTiO_4$ thin film is deposited by e-beam evaporation. Deposited films are annealed for 1 hour in N2 ambient at $150^{\circ}C\~600^{\circ}C$. Dielectric constant of ferroelectric is about 60-100 and breakdown field is about IMV/cm. In this paper, the TFT using ferroelectric consisted of double layer gate insulator to minimize the leakage current. a-SiN:H, a-Si:H (n-type a-Si:H) are deposited onto $SrTiO_3$ film to make MFNS(Metal/ferroelectric/a-SiN:H/a-Si:H) by PECVD. In this paper, TFR using ferroelectric has channel length of$8~20{\mu}m$ and channel width of $80~200{\mu}m$. And it shows that drain current is $3.4{\mu}A$at 20 gate voltage, $I_{on}/I_{off}$ is a ratio of $10^5\~10^8,\;and\;V_{th}$ is$4\~5\;volts$, respectively. In the case of TFT without having ferroelectric, it indicates that the drain current is $1.5{\mu}A$ at 20gate voltage and $V_{th}$ is $5\~6$ volts. If properties of the ferroelectric thin film are improved, the performance of TFT using this ferroelectric thin film can be advanced.
The purpose of this study was to investigate the effects of implicit and explicit situation awareness instruction on decision making and event related brain potentials. Psychophysiological data obtained from 36 intermediated level tennis players whose National Tennis Rating Program(NTTP) belong 2 to 2.5 were compared. Participants were randomly assigned to one of three experimental groups: (1) implicit situation awareness, (2) explicit situation awareness, and (3) control group. A total of 90 clips were presented via a beam project screen, and participants pressed one of three jelly bean buttons to indicate the direction of ball hit. Dependent measures were the latencies and amplitudes of P300 on Pz, Cz, and Fz. The results of this study indicated that participants in the implicit situation awareness produced tenser P300, than participants in the explicit situation awareness group. The findings also indicated that single defense showed longer P300 latencies than single attack as well as double defense. The P300-amplitude of treatment groups were longer than control group. The Cz area showed shorer P300 latencies than Pz and Fz areas. In addition, single defense situation demonstrated longer P300 latencies than single attack and double defence situations. Based on this study, it is believed that implicit and explicit situation awareness instruction influence decision making in different ways.
The Journal of Korean Institute of Electromagnetic Engineering and Science
/
v.23
no.12
/
pp.1327-1336
/
2012
In this paper, the dual-faced monopole antenna, which is arranged by numerous rectangular ring patches in sequence for the multi-bands is proposed. The ring type structure of the patch can be increased the bandwidth. Therefore the bandwidth and beam width are improved by using multiple arrayed patches. When the ring type patches are inserted serially, the resonance frequencies are occurred by the current flow from the first ring patch. It is possible because the gap between the patches is very narrow. In addition, if the patches are composed on the same plane as the feed-line, fabrication could be very difficult because the gap between the patches is extremely narrow. The thickness and permittivity of the antenna, moreover, are very important parameters because both sides of the substrate are used. We finally found the optimal thickness and permittivity to generate the coupling effect by simulation. All patches are consisted of 4-steps which the patch size was decreased 85 % by each step. In conclusion, the resonant frequency bands are 1.75~2.6 GHz(850 MHz), 3.24~3.46 GHz(220 MHz), 3.8~4.0 GHz(200 MHz), and 4.4~4.9 GHz(500 MHz).
Journal of the Society of Naval Architects of Korea
/
v.29
no.4
/
pp.152-172
/
1992
The ship sailing among waves are suffered the various wave loads that comes from its motion throughout its life. Because there are dynamic, the analysis of ship structure must be considered as the dynamic problem precisely. In the rationally-based design, the dynamic structural analysis is carried out using dynamic wave loads provided from the results of the ship mouton calculation as the rigid body. This method is based on the linear theory assumed low wave height and small amplitude of motion. But at the rough sea condition, high wave height, relatively ship's depth, is induced the large ship motion, so the ship section configulation below water line is rapidly changed at each time. This results in non-linear problem. Considering above situation in this paper, the strength analysis method is introduced for the hull glider among waves considering non-linear hydrodynamic forces. This paper considers that the overall or primary level of the ship structural dynamic loading and dynamic response provided from the non-linear wave forces, and bottom and bow flare impact forces estimated by momentum slamming theory, in which the ship is idealized as a hollow thin-walled box beam using thin-walled beam theory and the finite element method. This method is applied to 40,000 Ton Double-Skin Tanker and attention is paid to the influence of the response of ship speed, wave length and wave height compared with linear strip theory.
Chumsungdae is an ancient astronomical observatory whose main role was doing 'chunmoon'. It was administrate by a royal advisory agency on state affairs. The observers observed the heaven on the observatory platform, recorded peculiar events, and watched and interpreted the signs displayed in the heaven. Chumsungdae is an stonemasonry which represents almanac principles with its peculiar shapes and the numbers of strata and stones. The numbers were thoroughly invented to match exactly the almanac constants. Chumsungdae is comprised largely of three main parts, namely the square base, the stratified cylindrical body, and the top #-shaped stonework, and the total number of stones is 404. The number of the strata (27) and the height of the cylindrical body (27 尺) stand for the days in a sidereal month (27.3 days), which implies that the motion of the Moon with respect to the stars was given more priority than to the Sun at that time of geocentricism. And the cylindrical body was thoroughly designed to consist of 365 stones, which is of course the number of days in a solar year. In addition, there are 12 strata each under and above the south entrance and this in sum makes the 24 divisions of the year. Also there is 182 stones below the 13th stratum and this represents the number of days in the winter ~ summer solstice period, and the rest 183 stones the vice versa. The #-shaped top stonework was aligned in such a way that one of the diagonals points the direction of sunrise on the winter solstice. The square base also layed with the same manner. The south entrance was built 16 degrees SE, and the upright direction of the right pillar stone coincides with the meridian circle. This was a kind of built-in standard meridian circle facilitating the observations. In a symbolic sense, Chumsungdae was thought as the tunnel reaching the heaven, where the observers wished to be enlightened with the signs and inspirations in need. With the craftsmanship and skill, the builder reinforced the stratified cylindrical body with two sets of #-shaped beam stones, piercing at a right angle at 19th ~ 20th and 25th ~ 26th strata. Likewise, by placing the double #-shaped stonework with 8 beam stones on the platform of the observatory, both the stability of the stonemasonry and a guard rail for the nightly observers were securely provided.
Journal of the Korea institute for structural maintenance and inspection
/
v.26
no.6
/
pp.47-53
/
2022
As the limit state design method is applied as a method of designing concrete structures, the ultimate state is considered in the analysis or design. In fact, when the reinforced concrete member bears tensile force, the force is transmitted from the rebar to the concrete, and the structure bears the tensile force to the ultimate state even after yield. Therefore, the accurate evaluation of behavior after yield, it is necessary to study the tension stiffening effect after yield of the flexural member. In this study, a 4-point bending test was conducted on the RC simple beam having a rectangular cross section of the double reinforcement, and the behavior of the member was analyzed in detail using the image analysis method. Using the analysis results, the estimation formula for the tension stiffening effect after yield was proposed, and the applicability of this was verified through the experimental results of existing study. The difference between the ultimate strain and the yield strain representing the ductile behavior of the member is similar to the experimental results. The prediction of the proposed formula is relatively accurate.
Kim, Kun-Soo;Park, Ki-Tae;Woo, Tae-Ryeon;Kim, Jaehwan
Journal of the Korea institute for structural maintenance and inspection
/
v.26
no.6
/
pp.39-46
/
2022
As the limit state design method is applied as the design method of reinforced concrete structure, the ultimate state is considered when analyses or designing. In fact, when the reinforced concrete member is bent, there is a confining effect by stirrup, but the material curve of unconfined concretes applied when designing. In this study, to evaluate the suitability of the confined concrete model for flexural members, a 4-point bending test was conducted on RC simple beam with a double-reinforced rectangular cross-section, and the behavior of the member after yield was analyzed in detail using image processing method. For detailed analysis, the DIC method was adopted as an image analysis method, and the validity of DIC method was verified by comparing the measurement results with the LVDT. The distribution of the strain on the concrete surface calculated as a result of the DIC method could be obtained, and the average strain distribution of the cross-section was calculated. Using the average strain distribution, the stress distribution applied existing confined concrete model as a material curve could be derived. Through the comparison of the experimental results and the existing model application results, the suitability of the confined concrete model for RC flexural members having a rectangular cross-section was evaluated.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.