Mun K. J.;Kim H. S.;Park J. H.;Lee H. S.;Kang H. T.
Proceedings of the KIEE Conference
/
summer
/
pp.36-38
/
2004
This paper presents an application of parallel hybrid Genetic Algorithm-Tabu Search (GA-TS) algorithm to search an optimal solution of a recokiguration in distribution system. In parallel hybrid CA-TS, after CA operations, stings which are not emerged in the past population are selected in the reproduction procedure. After reproduction operation, if there are many strings which are in the past population, we add new random strings into the population, if there's no improvement for the predetermined iteration, local search procedure is executed by TS for the strings with high fitness function value. To show the usefulness of the proposed method, developed algorithm has been tested and compared on a distribution system in the reference paper.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.17
no.5
/
pp.94-102
/
2003
This paper presents active management of feeder automation systems using active database. DAS(Distribution Automation System) has been managed for feeder automation in passive manner. Therefore, feeder automation system has to be managed by operator when feeder overloadings is detected. It may be possible for propagating the feeder overloadings area by operator's mistake. To overcome this defect, the author proposed the feeder automation technique with active manner to obtain feasible feeder reconfiguration. Active database can manage feeder automation system by data driven monitoring of events and by corresponding actions without operator's intervening. To manage feeder automation system with active manner, production rule, active rule manager are designed. And active database system architecture for feeder automation system is proposed. Test results on the KEPCO's 108 bus distribution system show that the performance is efficient and robust.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.54
no.8
/
pp.375-387
/
2005
This paper presents an application of parallel Genetic Algorithm-Tabu Search (GA-TS) algorithm to search an optimal solution of a service restoration in distribution systems. The main objective of service restoration of distribution systems is, when a fault or overload occurs, to restore as much load as possible by transferring the do-energized load in the out of service area via network reconfiguration to the appropriate adjacent feeders at minimum operational cost without violating operating constraints, which is a combinatorial optimization problem. This problem has many constraints with many local minima to solve the optimal switch position. This paper develops parallel GA-TS algorithm for service restoration of distribution systems. In parallel GA-TS, GA operators are executed for each processor. To prevent solutions of low fitness from appearing in the next generation, strings below the average fitness are saved in the tabu list. If best fitness of the GA is not changed for several generations, TS operators are executed for the upper $10\%$ of the population to enhance the local searching capabilities. With migration operation, best string of each node is transferred to the neighboring node after predetermined iterations are executed. For parallel computing, we developed a PC cluster system consists of 8 PCs. Each PC employs the 2 GHz Pentium IV CPU and is connected with others through ethernet switch based fast ethernet. To show the validity of the proposed method, proposed algorithm has been tested with a practical distribution system in Korea. From the simulation results, we can find that the proposed algorithm is efficient for the distribution system service restoration in terms of the solution quality, speedup, efficiency and computation time.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.53
no.12
/
pp.637-644
/
2004
This paper proposes an expert system with the knowledge learning capability which can enhance the safety and effectiveness of substation operation in the automated substation as well as existing substation by inferring multiple events such as main transformer fault, busbar fault and main transformer work schedule under multiple inference mode and multiple objective mode and by considering totally the switch status and the main transformer operating constraints. Especially inference mode includes the local minimum tree search method and pattern recognition method to enhance the performance of real-time bus reconfiguration strategy. The inference engine of the expert system consists of intuitive inferencing part and logical inferencing part. The intuitive inferencing part offers the control strategy corresponding to the event which is most similar to the real event by searching based on a minimum distance classification method of pattern recognition methods. On the other hand, logical inferencing part makes real-time control strategy using real-time mode(best-first search method) when the intuitive inferencing is failed. Also, it builds up a knowledge base or appends a new knowledge to the knowledge base using pattern learning function. The expert system has main transformer fault, main transformer maintenance work and bus fault processing function. It is implemented as computer language, Visual C++ which has a dynamic programming function for implementing of inference engine and a MFC function for implementing of MMI. Finally, it's accuracy and effectiveness is proved by several event simulation works for a typical substation.
본 논문에서는 확률적인 전역 최적해 탐색 방식인 유전알고리즘과 경험적인 최적화 알고리즘인 Tabu 탐색법을 이용하여 실시간으로 적용 가능한 배전계통 선로 재구성 및 커패시터 용량결정 방안을 제안하고자 한다. 제안한 알고리즘은 PC Cluster System으로 병렬처리하여 배전계통의 손실 최소화를 위한 선로 재구성 및 커패시터 용량 결정문제의 최적해 탐색에 소요되는 계산시간을 단축하고, 실시간 지원시스템의 성능 개선을 도모하고자 한다. PC Cluster System은 이용자의 편의를 위해서 MS Windows 환경에서 구축하였고, Visual C++ 환경에서 개발하였다. 제안한 방법의 유용성을 입증하기 위해 참고 문헌의 예제 계통에 적용한 후 종래의 방법과 비교함으로써 제안한 방법이 해의 탐색속도 및 해의 성능면에서 우수함을 입증하였다.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.28
no.9
/
pp.83-88
/
2014
When DG interconnection into network is examined, details of the review are overvoltage, protective device malfunction, etc. In the case of protective device malfunction, replacing protective device into bi-directional protective device and installation NGR are the solution. Overvoltage at interconnection point occurs because the load is relatively less than DG output. When overvoltage at interconnection point occurs, DG interconnection is not permitted because this overvoltage affect other customers. Interconnection by installation new distribution line is one solution but it costs much money. Without installation new investment, change of NOP(Normal Open Point) position is a possible solution about DG interconnection into network.
본 논문에서는 한국전력공사의 배전계통 운영계획시스템(Distribution Line PLANning system)에서 배전계통 재구성 최적화에 적용하고 있는 선로간의 부하 평준화 알고리즘에 대하여 연구하였다. 기존의 알고리즘은 계통 내 임의의 연계 개폐기 혹은 구분 개폐기를 조작한 후 방사상의 운전조건을 만족하면 선로별 부하를 계산한다. 그리고 최대부하 선로와 최소부하 선로간의 부하 편차를 구하고 직전의 최적해와 비교하여 최적의 해를 찾아내는 방법이다. 그러나 계통이 커질 경우 시험해야할 경우의 수가 많아져서 시간이 많이 소요되고 또한 수렴속도를 빠르게 하기위하여 반복횟수를 제한하기 때문에 절대적인 최적의 해를 보장하지 못하였다. 따라서 본 연구에서는 탐색시간을 만족시키면서 전수조사하는 정도의 부하 평준화 최적해를 찾아서 배전계통의 재구성을 최적화하는 알고리즘을 구현하고자 한다.
Kim, S.H.;Choi, B.Y.;Lee, S.M.;Cho, S.H.;Lee, J.K.;Moon, Y.H.
Proceedings of the KIEE Conference
/
1995.07b
/
pp.500-502
/
1995
Whenever faults(a fault) occur(s) in a particular section of a distribution system, some of loads get disconnected and are left unsupplied. Service should be restored to these affected load points as quickly as possible through network reconfiguration. An efficient technique is presented in this paper for this purpose. Network reduction and strategy testing the voltage and current constraints are the main contributions of this paper.
This paper presents an application of the parallel Adaptive Evolutionary Algorithm (AEA) to search an optimal solution of the service restoration in electric power distribution systems, which is a discrete optimization problem. The main objective of service restoration is, when a fault or overload occurs, to restore as much load as possible by transferring the de-energized load in the out of service area via network reconfiguration to the appropriate adjacent feeders at minimum operational cost without violating operating constraints. This problem has many constraints and it is very difficult to find the optimal solution because of its numerous local minima. In this investigation, a parallel AEA was developed for the service restoration of the distribution systems. In parallel AEA, a genetic algorithm (GA) and an evolution strategy (ES) in an adaptive manner are used in order to combine the merits of two different evolutionary algorithms: the global search capability of the GA and the local search capability of the ES. In the reproduction procedure, proportions of the population by GA and ES are adaptively modulated according to the fitness. After AEA operations, the best solutions of AEA processors are transferred to the neighboring processors. For parallel computing, a PC cluster system consisting of 8 PCs was developed. Each PC employs the 2 GHz Pentium IV CPU and is connected with others through switch based fast Ethernet. To show the validity of the proposed method, the developed algorithm has been tested with a practical distribution system in Korea. From the simulation results, the proposed method found the optimal service restoration strategy. The obtained results were the same as that of the explicit exhaustive search method. Also, it is found that the proposed algorithm is efficient and robust for service restoration of distribution systems in terms of solution quality, speedup, efficiency, and computation time.
Proceedings of the Korea Inteligent Information System Society Conference
/
1999.03a
/
pp.195-202
/
1999
본 논문은 배전 계통에서 부하 제약조건과 운전 제약조건을 고려한 손실 감소와 부하 평형에 대해 시뮬레이티드 어닐링 알고리즘을 적용한 재구성 방법을 서술하였다. 네트워크 재구성은 수많은 연계 개폐기와 구분 계폐기의 조합에 의해 이루어지기 때문에 조합적인 최적화 문제이다. 이러한 문제는 수많은 조합에 제약조건까지 있어 해를 구하기가 쉽지 않을뿐 아니라 국소 해에 빠질 가능성이 많다. 따라서 신경망 중에서 제약조건에 따라 신경망 구조에 영향을 미치지 않으면서 전역 최소해에 수렴하는 특성을 가진 시뮬레이티드 어닐링 기법을 이용하여 배전 계통의 선로를 재구성하였다. 시뮬레이티드 어닐링은 이론적으로 최적해가 보장되지만 무한대의 시간이 걸리기 때문에 현실적으로 적용할 때 해 공간을 탐색하는 규칙과 온도를 적절히 내리는 냉각 스케줄(cooling schedule)이 중요하다. 본 논문에서는 알고리즘 상에서 제약조건 위한 여부를 점검할 수 있는 제약조건과 페널티 상수(penalty factor)를 통해 목적함수에 반영하는 제약조건으로 나누어 모든 후보해를 가능해가 되게 하였고 기존에 사용되는 Kirkpatrick의 냉각 스케줄 대신에 후보해의 통계적 처리에 의해 온도를 내리는 다항-시간 냉각 스케줄(polynomial-time schedule)을 사용하여 수행시간을 단축하고 수렴성을 높였다. 제안한 알고리즘의 효용성을 입증하기 위해 32,69모선 예제 계통으로 테스트하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.