• 제목/요약/키워드: Discharge withstand

검색결과 31건 처리시간 0.03초

HVAC에 의한 On-line, Off-line PD 모니터링 (On-line and Off-line Partial Discharge Monitoring System with HVAC Testing)

  • 최용성;이경섭
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2008년도 춘계학술대회 논문집 센서 박막재료연구회 및 광주 전남지부
    • /
    • pp.111-114
    • /
    • 2008
  • The paper considers the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is described.

  • PDF

전력 설비 시스템의 온라인 감시 (On-line Condition Monitoring for Electric Equipments)

  • 최용성;이경섭
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2008년도 춘계학술대회 논문집 센서 박막재료연구회 및 광주 전남지부
    • /
    • pp.103-105
    • /
    • 2008
  • In, this paper, we consider the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PO) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PO testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PO measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is described.

  • PDF

온라인 부분방전 감시 시스템 (On-Line System for Partial Monitoring Discharge)

  • 최용성;황종선;이경섭
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.2114-2115
    • /
    • 2008
  • We consider the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers is described.

  • PDF

저압용 전기전자기기에 부분방전시험의 적용을 위한 기초연구 (A Basic Study on the Application of Partial Discharge Test on Low-voltage Electrical and Electronic Devices)

  • 길경석;송재용;문승보;차명수;황돈하;강동식
    • 한국전기전자재료학회논문지
    • /
    • 제19권6호
    • /
    • pp.586-590
    • /
    • 2006
  • This paper deals with the application of a partial discharge (PD) test on low-voltage electrical and electronic devices, which is recently being accepted as a non-destructive and a effective dielectric test method. A comparative analysis combined with the Withstand Voltage Test (WVT) specified in IEC standards was carried out on low-voltage insulation transformers. The results showed that the WVT causes insulation degradation of the specimen during the test by applying high voltage. However, the PD test can be performed in ranges from 30 % to 50 % of the test voltage specified in the WVT. Therefore, the PD test is successfully applicable for a non-destructive test method on low-voltage electrical and electronic devices as a replacement of the WVT.

고온 초전도 레이블의 절연 특성 (Insulation Characteristics of High Temperature Superconducting Cable)

  • 김해준;김재호;심기덕;김해종;조전욱;성기철;곽동순;김상현
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 추계학술대회 논문집 전기물성,응용부문
    • /
    • pp.244-247
    • /
    • 2004
  • The electrical insulating design is important to realize a HTS power cable because the cable is operated under the high voltage environment. For the insulation design of a HTS power cable, it is necessary to investigate the AC, impulse breakdown and partial discharge(PD) inception stress of liquid nitrogen/LPP composite insulation system. Based on these results, the electrical insulation of a HTS power cable is designed and Mini-model cables are manufactured. The manufactured Mini-model cables are evaluated that AC, impulse withstand voltage, breakdown and partial discharge inception stress and analyzed characteristics insulation of HTS cable bending condition according to this paper. From these tests, the AC, impulse withstand voltage test and partial discharge inception stress is satisfied "standard technical specification of KEPCO" in Korea and the breakdown voltage was 120kV.

  • PDF

다른 굵기의 6/10[kV]급 CV 케이블 직선접속부 안전성 평가 (A Safety Assessment of Splice of 6/10[kV] Class CV Cables with Different Conductor Size)

  • 정종욱;김선구;정진수
    • 조명전기설비학회논문지
    • /
    • 제24권10호
    • /
    • pp.78-84
    • /
    • 2010
  • This paper describes the safety assessment of power cable splices connecting different sized 6/10[kV] class power cables. To assess the safety, AC withstand voltage tests, partial discharge tests and impulse tests were carried out to the cable splice specimens and thermal rise due to overload and cross section of joint were examined as well. As a result, a breakdown due to the $4.5[U_0](27[kV_{ac}])$ application could not found for 5 minutes. Under $1.73[U_0](10.4[kV_{ac}])$ application, partial discharges of 4~8[pC] were detected. In impulse tests, all the specimens withstood to the standard waveforms of $75[kV_{peak}](1.2{\times}50[{\mu}s])$ without any breakdowns. In addition, the temperature on the splice rose by $3[^{\circ}C]$ when the 200[A] flew through the splice for 20minutes, however the thermal rise of $3[^{\circ}C]$ was considered due to the atmospheric temperature. After all the electrical tests, the cross section of the splice was visually examined. The conditions of the conductors of both $185[mm^2]$ and $240[mm^2]$ were good.

고온초전도 케이블의 절연설계를 위한 적층효과에 관한 연구 (Research on Multi-layered Effect for the Insulation Design of a HTS Cable)

  • 곽동순;김해종;조전욱;김해준;김재호;천현권;김상현
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2005년도 하계학술대회 논문집 Vol.6
    • /
    • pp.560-561
    • /
    • 2005
  • For the insulation design of a HTS cable, the withstand voltage of three kinds were proposed. One of them is the AC design withstand voltage, another is the impulse design withstand voltage, and the other is the partial discharge inception stress. However, the multi-layered effect was not considered on insulation design of a HTS cable at existent design process. Therefore in this paper, the electrical breakdown characteristics by multi-layered effect of LPP insulation paper were investigated. Based on these results, the insulation thickness of 22.9 kV class HTS cable was designed, and compared with existent design process.

  • PDF

온라인 및 오프라인 PD 모니터링에 관한 연구 동향 (A Research Trend on On-Line/Off-Line PD Insulation Diagnostic System)

  • 추종훈;홍창일;최용성;이경섭
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.2008-2009
    • /
    • 2007
  • The paper considers the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is introduced.

  • PDF

Partial Discharge Process and Characteristics of Oil-Paper Insulation under Pulsating DC Voltage

  • Bao, Lianwei;Li, Jian;Zhang, Jing;Jiang, Tianyan;Li, Xudong
    • Journal of Electrical Engineering and Technology
    • /
    • 제11권2호
    • /
    • pp.436-444
    • /
    • 2016
  • Oil-paper insulation of valve-side windings in converter transformers withstand electrical stresses combining with AC, DC and strong harmonic components. This paper presents the physical mechanisms and experimental researches on partial discharge (PD) of oil-paper insulation at pulsating DC voltage. Theoretical analysis showed that the phase-resolved distributions of PDs generated from different insulated models varied as the increase of the applied voltages following a certain rule. Four artificial insulation defect models were designed to generate PD signals at pulsating DC voltages. Theoretical statements and experimental results show that the PD pulses first appear at the maximum value of the applied pulsating DC voltage, and the resolved PD phase distribution became wider as the applied voltage increased. The PD phase-resolved distributions generated from the different discharge models are also different in the phase-resolved distributions and development progress. It implies that the theoretical analysis is suitable for interpretation of PD at pulsating DC voltage.

VLF를 활용한 전력케이블 진단 시뮬레이터 구현 (Implementation of Power Cable Diagnostic Simulator using VLF)

  • 김국;어익수
    • 한국산학기술학회논문지
    • /
    • 제21권8호
    • /
    • pp.593-602
    • /
    • 2020
  • 국내 공장이나 지중에 설치되어 있는 전력 케이블은 제조과정, 설치, 사용 중의 환경여건에 따라 사고가 발생할 수 있는 필연성을 갖고 있다. 전력 케이블에서 사고가 일어났을 때 막대한 경제적 손실과 사회적 혼란을 야기할 수 있어 이를 미연에 방지하고자 진단을 통한 케이블의 예방관리의 중요성이 증대되고 있다. 이에 본 논문에서는 현장에서 발생 될 수 있는 케이블의 설치나 제조결함, 경년열화로 문제가 될 수 있는 부분을 모의하여 진단시료 케이블을 제작하였고, 최근 도입되어 적용되고 있는 VLF(Very Low Frequency)장비를 사용하여 유전정접(tan 𝛿 ; TD), 부분방전(Partial Discharge ; PD)시험을 실시하였고, 0.1Hz 주파수를 갖는 VLF전원을 가압을 한 후 HFCT(High Frequency Current Transformer)를 이용한 부분방전과 AC(상용주파)내압 장비를 이용하여 가압한 후 PD측정을 수행하였다. 그 결과, VLF를 통한 2.0U0 전압에서 B, C상 결함시료에서는 내부 부분방전을 측정할 수 있었으며 A상 정상시료에서는 0.5~2.0U0 전압에서 모두 노이즈로 측정되었다. 또한, 상용주파수의 AC(60Hz) 내압장비를 통한 1.5U0전압에서 측정하여 그 실효성을 검증하였다. 활선상태에서의 부분방전은 1.0U0의 사용전압에서 측정 되어지며, 장비를 설치할 때 위험성이 있고, AC내압장비는 부피나 무게 등에 의해 이동의 어려움이 있어 사선상태의 VLF를 통한 진단방법이 안전과 실효성이 있음을 알 수 있었다.