• Title/Summary/Keyword: Dip Estimation

Search Result 26, Processing Time 0.024 seconds

Estimation of material budget for Keum river estuary using a Box Model (BOX 모델을 이용한 금강 하구해역의 물질수지 산정)

  • Kim Jong-Gu;Kim Dong-Myung;Yang Jae-Sam
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.3 no.4
    • /
    • pp.76-90
    • /
    • 2000
  • The estimation of material cycle of pollutants is necessary for the environment management in coastal zone. Model for material budgets are useful tools to understand the phenomena of natural system and to provide an insight into the complex processes including physical, chemical and biological processes occuring in natural system. Budgets of fresh water, salt and nutrients were estimated in order to clarify the characteristics of seasonal material cycle in Keum river estuary. Inflow volumes of freshwater into system was approximately 1.014×10/sup 8/~12.565×10/sup 8/m³/month and discharge in Keum river has occupied 99.7% of total freshwater. Seasonal variations of freshwater volume in the system were found to be very high in the range of about 4 ~ 14 times due to rainfall in summer season. Existing water mass of freshwater in system calculated by salt budget was approximately 0.339×10/sup 8/~0.652×10/sup 8/m³. Mean residence time of freshwater was calculated to be about 1.6~10.0day, and exchange time was calculated to be about 2.2~11.9day. Mean residence time was short as 1.6day in summer due to precipitation, and long as 10.1day in winter due to a drought. Inflow masses of DIP and DIN were approximately 5.57~32.68ton/month and 234.93~2,373.39ton/month, respectively. Seasonal inflow mass of DIP was larger than the outflow mass except for summer season. Thus, we postulate that accumulation of DIP in the system will happen. Residence times of DIP and DIN were calculated to be 1.1~6.4day and 1.8~10.9day, respectively. The ratio of water residence time versus DIP, DIN residence time was calculated to be 0.39~2.31 times and 0.83~1.13 times, respectively.

  • PDF

Dip Estimation for Overhead Transmission Conductor using Catenary Angle (카테너리 각도를 이용한 가공송전도체의 이도 추정)

  • Kim, Sung-Duck;Sohn, Hong-Kwan;Jang, Tae-In
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.21 no.5
    • /
    • pp.112-119
    • /
    • 2007
  • Under normal operating condition, the conductor of overhead transmission line could be always hold it's clearance within the safety margin that is specified in the line design guide of power company. Hence it may be very important to measure/or monitor the dip of the conductor, when building a new line, re-tensioning for an aged conductor, or monitoring dynamic line rating to maximize power capability. In this paper, we suggest a new method to estimate the dip and tension by catenary angle of the conductor. Since most conductors in overhead transmission lines show typical catenary curves, it can be uniquely determined the catenary curve for the conductor from the catenary angle at tower. Based on the catenary curve, the dip or horizontal tension can be easily estimated. Through some simulation and simple experimental results, it is verified that the suggested method can be effectively applied to measure/or monitor conductor dips and tensions in the overhead transmission lines.

Estimation of Durability of corrugated Steel Pipes Made of Hot-Dip Galvanized Sheet Steels (용융아연 도금강판으로 제조된 파형강관의 내구수명예측)

  • 김종상
    • Journal of the Korean institute of surface engineering
    • /
    • v.27 no.6
    • /
    • pp.347-358
    • /
    • 1994
  • Estimation of durability for corrugated steel pipe(CSP) has been evaluated by using several analytical methods. This study, using a plain hot-dip galvanized CSP as the base line, addresses additional coatings such as polymers sand bituminous coatings that may be used to achieve a desired design life of at least 50years. The behavior of both the soil side and the effluent side of the pipe have been studied. It is estimated that CSP generally provides outstanding dura-bility with regard to soil side effects, and that virtually any required service life can be attained by selecting appropri-ate coatingss and/or thickness of steel substrate. This study is limited to storm drainage systemss carrying naturally oc-curring surface water only. The recommendation in this report do not apply to sanitary or industrial waste sewers or other conduits used to carry corrosive effluents.

  • PDF

Estimation of Eutrophication during Summer and Fall in Danghang Bay (당항만의 여름과 가을의 부영양화 평가)

  • Kim, Sung Jae;Yoo, Young Jin
    • Journal of Wetlands Research
    • /
    • v.19 no.4
    • /
    • pp.383-392
    • /
    • 2017
  • In 2013, August and September(early) as summer and October and November as Fall the probe of eutrophication has been done at 22 sampling points from the entrance of Danghang Bay (Jinhae Bay) to Geosan reservoir. In Danghang Bay, total chlorophyll(TChl) concentration of summer was 3.7 times higher than that of fall, and sampling points closer to the center showed 1.8 times higher concentrations than sampling points near the fringe where fresh water encountered. Eutrophication Index(EI) exceeded 1 at all sampling points in Danghang Bay during summer and fall, and if other conditions for algae growth met there was a possibility red tide to bloom at any place. There was a tendency of EI to gradually increase moving up from the entrance of bay to the inner side during summer and fall. Especially there was a sudden increase by 2.3 times higher at sampling points of 13~22 (planned region as Madong reservoir) than at other points during fall. Nitrogen was a limiting nutrient for growth of algae during summer and fall in Danghang Bay, but phosphorus was a limiting nutrient during summer rainy season. During summer and fall, multiple linear regression analysis between EI and COD, DIN, and DIP showed a significant positive relationship and that DIP was the most effective variable. Whereas multiple linear regression analysis between TChl and COD, DIN, DIP, and DSi showed a significant positive relationship and that DIP was also the most effective variable during summer. There was no significant correlation between TChl and the other parameters during fall.

The Estimation of N, P mass Balance in Masan Bay using a Material Cycle Model (물질순환 모델을 이용한 마산만의 질소, 인 수지 산정)

  • 김동명;박청길;김종구
    • Journal of Environmental Science International
    • /
    • v.7 no.6
    • /
    • pp.833-843
    • /
    • 1998
  • It is noted that the red tides and the oxygen-deficient water mass are extensively developed in Masan Bay during summer. The nutrients mass balance was calculated in Masan Bay, using the three-dimensional numerical hydrodynamic model and the material cycle model. The material cycle model was calibrated with the data obtained on the field of the study area in June 1993. The nutrients mass balance calculated by the combination of the residual currents and material cycle model results showed nutrients of surface and middle levels to be transported from the inner part to the outer part of Masan Bay, and nutrients of bottom level to be transported from outer part to inner part of Masan Bay. The uptake rate of DIN in the box A1(surface level of inner part) was found to be 337. 5mg/$m^3$ㆍday, the largest value in all 9 boxes and that of DIP was found to be 18.6mg/$m^3$ㆍday in box A1, and the regeneration rate of DIN was found to be 78.2mg/$m^3$ㆍday in the box A3(bottom level of inner part), and that of DIP was found to be 18.6mg/$m^3$ㆍday in box A1. The regenerations of DIN and DIP in the water column of the entire Bay were found to be 7.66ton/day and 760kg/day, respectively. And the releases of DIN and DIP from the sediments of the entire Bay were found to be 2.86ton/day and 634kg/day, respectively. The regeneration rate was 2.5 times as high as the release rate in DIN, and 1.2 times in DIP. The results of mass balance calculation showed not only the nutrients released from the sediments but the nutrients regenerated in water column to be important in the control and management of water quality in Masan Bay.

  • PDF

Estimation of Nutrient Mass Balance in a Phragmites Australis Community in Jinudo Through a Mesocosm Experiment (메조코즘 실험을 통한 진우도 갈대군락의 영양염 물질수지 산정)

  • RYU, Sung Hoon;LEE, In cheol
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.24 no.5
    • /
    • pp.545-552
    • /
    • 2018
  • In this study, we performed a mesocosm experiment to estimate the mass balance of Nutrients (DIN, DIP) in a phragmites australis community. We developed 4 mesocosm tanks which is available to circulate seawater with adjustable tide levels and flooding times. Each of the mesocosm tanks were filled with phragmites australis and sediment from Jinudo in Nakdong Estuary. We investigated DIN, DIP concentrations in three layers (seawater-phragmites australis-sediment) to estimate the mass balance of Nutrients and biomass. Growth rates were also investigated. The results can be summarized as follows. 1) In spring, rhizome biomass was higher than that of aerial stem by about 6.3~9.7%. In summer, aerial stem biomass was higher than that of rhizome about 19.2~21.2 %. 2) Th Growth rate of phragmites in Mesocosm Tank A was faster than in Mesocosm Tank D by about 2 to 3 times for aerial stem and rhizome. 3) The Concentration of nutrients (DIN, DIP) in each mesocosm Tank showed 2~3 % variance in spring and summer. 4) The biomass in each mesocosm varied by about 23 % which was higher than the concentration variance for each mesocosm tanks.

A Control System for Attenuating Voltage-Dip and Inrush Current Caused by Starting of Inductive Load Nnetwork (유도성 부하 네트워크의 기동에 의한 순간전압강하 및 기동전류 감쇄를 위한 제어시스템)

  • Kim, Sang-Kon;Choi, In-Kyum;Kim, Tae-Kon;Seo, Sung-Kyu
    • Journal of IKEEE
    • /
    • v.16 no.2
    • /
    • pp.109-115
    • /
    • 2012
  • We propose a control system consisted of TRIAC PWM module and sequential start control system attenuating voltage-dip and inrush current caused by starting of inductive load network. To minimize the high voltage-dip and inrush current induced from a large capacity inductive load, we developed a TRIAC PWM module. And we also developed a sequential start control system preventing simultaneous starting of the inductive loads within a same power network. According to the experimental results with the proposed control system, the voltage-dip and inrush current could be effectively attenuated such that they can meet the related international standards and resolve the issues associated with simultaneous starting of multiple inductive loads. By employing this system, power cost usually implemented by the estimation of peak power consumption can be reduced and the power quality of a power distribution system connected to the inductive load network can be stabilized efficiently.

Estimation of Pollutants Residence Time During the Flood and Dry Season in Gwangyang Bay (광양만의 홍수기 및 갈수기의 오염물질 체류시간 산정)

  • Lee, In-Cheol;Kim, Jin-Hyuk;Kong, Hwa-Hun
    • Journal of Ocean Engineering and Technology
    • /
    • v.22 no.6
    • /
    • pp.20-26
    • /
    • 2008
  • In this paper, in order to set up the management system of water quality environment in Gwangyang Bay, the cluster analysis of water quality environment, the estimation of inflowing pollutant loads and residence time of pollutants in this bay was carried out. The Gwangyang Bay was divided into eight sea areas by cluster analysis and spatio-temporal change of water quality. The river discharges in the Bay were calculated about $11,681{\times}103m^3/day$ from the numerical simulation by Tank model. In addition, inflowing pollutant loads of COD, SS, TN, TP, DIN and DIP in Gwangyang Bay were estimated at 398 ton-COD/day, 2,846 ton-SS/day, 195 ton-TN/day, 5 ton-TP/day, 126 ton-DIN/day and 3 ton-DIP/day, respectively. Moreover, residence times of COD, TN and TP in the Bay was estimated at 6 days-COD, 20 days-TN and 195 days-TP, respectively in the dry season, and 3 days-COD, 6 days-TN and 21 days- TP, respectively, in the flood season. The central part of Gwangyang Bay (Region IV) has the longest residence time of overall pollutants.

Biaxial Accelerometer-based Magnetic Compass Module Calibration and Analysis of Azimuth Computational Errors Caused by Accelerometer Errors (2 축 가속도계 기반 지자기 센서 모듈의 교정 및 가속도계 오차에 의한 방위각 계산 오차 분석)

  • Cho, Seong Yun
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.20 no.2
    • /
    • pp.149-156
    • /
    • 2014
  • A magnetic compass module must be calibrated accurately before use. Moreover, the calibration process must be performed taking into account any magnetic dip if the magnetic compass module has tilt angles. For this, a calibration method for a magnetic compass module is explained. Tilt error of the magnetic compass module is compensated using a biaxial accelerometer generally. The accelerometer error causes a tilt angle calculation error that gives rise to an azimuth calculation error. For error property analysis, error equations are derived and simulations are performed. In the simulation results, the accuracy of derived error equations is verified. If a biaxial magnetic compass module is used instead of a triaxial one, the magnetic dip and z-axis magnetic compass data must be estimated for tilt compensation. Lastly, estimation equations for the magnetic dip and z-axis magnetic compass data are derived, and the performance of the equations is verified based on a simulation.

The Estimation of the contribution rate of Mokpo Municipal Sewage Treatment Plant to the Improvement of Marine Water Quality in Mokpo Harbour (목포항 수질개선에 대한 목포하수처리장의 기여율 산정)

  • Kim Kwang-Soo
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.6 no.4
    • /
    • pp.37-44
    • /
    • 2003
  • In order to evaluate the contribution of MMSTP operation to the improvement of marine water quality of Mokpo harbour and to estimate the change of pollution loads flowing into Mokpo harbour after the operation of Mokpo Municipal Sewage Treatment Plant (MMSTP), the pollution loads flowing into Mokpo harbour from land in dry weather were surveyed and estimated on the bases of the seasonal flow rates and the seasonal water qualities of streams and effluents located around Mokpo harbour from summer, 1997 to spring, 1998 before the operation of MMSTP, and the pollution loads of the inflow and the effluent of MMSTP were also surveyed and estimated from winter, 1998 to spring, 1999 after the operation of MMSTP. The treatment rates of MMSTP were shown to be about 49% in COD, 76% in TSS, 79% in VSS, 3% in T-N, 7% in DIP, 29% In T-P and -32% in DIN. The change rates of pollution loads flowing into the inner harbour of Mokpo due to the operation of MMSTP were shown to be about 56% in COD, 78% in TSS, 84% in VSS, 45% in DIN, 22% in T-N, 34% in T-P and -14% in DIP The contribution rates of MMSTP operation to the reduction of total pollution loads flowing into the entire Mokpo harbour were found to be about 3% in COD, 3% in TSS, 5% in VSS, 1% in DIP, 3% in T-P and -1% in DIN.

  • PDF