• Title/Summary/Keyword: Digital Project

Search Result 961, Processing Time 0.021 seconds

Cyber University Students' Perceptions of a DST Project to Develop English Skills

  • Moon, Dosik
    • International Journal of Advanced Culture Technology
    • /
    • v.8 no.4
    • /
    • pp.200-206
    • /
    • 2020
  • Digital storytelling, a 21st century educational tool that combines digital media with storytelling, is considered as a powerful tool to learn foreign languages in an authentic and meaningful way. This study explored cyber university students' perceptions and experiences with a digital storytelling project implemented to enhance their English writing and speaking skills. The results of 9 week-long research indicated that most of the students' attitudes were positive: the digital storytelling project was effective to increase their English skills, learning motivation and interest in learning English. Most students perceived that the process writing approach and videotaping tasks provided them with good opportunities to develop their English writing and speaking skills. Although many students had difficulties selecting a topic and writing a script in the initial stage, they could handle with these challenges with the help of professors' feedback and successfully completed their projects. After completing the project, most students expressed a strong sense of accomplishment. These results suggest that the digital storytelling project effectively met cyber university students' learning needs and facilitate their English learning.

Study of Freeform Buildings using the Digital Fabrication (비정형 건축물 구현을 위한 Digital Fabrication의 활용방법 연구 -롯데월드타워 3D 포디움 시공사례-)

  • Kim, Sung-Jin;Park, Young-Mi;Park, Jung-Joon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.52-53
    • /
    • 2017
  • Through the case study, we surveyed an applicability of digital fabrication in irregular-shaped building construction project. By digital fabrication, we mean is a precision manufacturing method has been used in aircraft, ship and car manufacturing industry. We collected construction-completed "LotteWorld Tower Podium" project data and analyzed its process in terms of construction quality andduration. The result shows that digital fabrication is considered a competitive technology that enabled to complete the project in seven months within 3mm surface curvature threshold. The digitalfabrication is expected to apply on a number of irregular-shaped building construction project.

  • PDF

Specialty Contractor's Role and Performance Analysis for Digital Fabrication - Focusing on the case of irregular podium construction - (디지털 패브리케이션 전문 건설업체 역할 및 성과 분석 - 비정형 포디움 시공 사례를 중심으로 -)

  • Ham, Nam-Hyuk;Ahn, Byung-Ju;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.8 no.1
    • /
    • pp.43-55
    • /
    • 2018
  • Recently, there have been increasing studies on the application of digital technology, which has its focus of the irregular building. However, most of these studies have not clarified the objective of the technology and the effectiveness of professional manpower on its performance. This study analyzes actual used technology and the role of specialty contractor. It presents a framework to quantify the performance of the specialty contractor. For these purposes, this paper presents a proposed method to evaluate the activities of specialty contractors using a queueing model. As an attempt to verify the model, an actual irregular building project, in which digital fabrication is applied, is investigated during the construction phase. In order to collect the digital fabrication data, digital fabrication reports and specialty contractor's work log of project are reviewed. In addition, Digital Fabrication input personnel, productivity data are collected through interviews with experts involving in the case project. Analysis of specialty contractor's performance in digital fabrication reveals that the wait status of project participants varies probabilistically depending on the digital technology application level. The results of this study are expected to contribute toward the improvement of the production level in the construction industry.

Class Design Applying Flipped Learning Combined with Project-Based Learning: Focusing on Digital Painting Tool for Class (플립러닝형 프로젝트 기반학습을 적용한 수업 설계: Digital Painting Tool 수업을 중심으로)

  • Sung, Rea;Kong, Hyunhee
    • Journal of Information Technology Applications and Management
    • /
    • v.29 no.1
    • /
    • pp.29-45
    • /
    • 2022
  • The Fourth Industrial Revolution era requires people to have the ability of integrated thinking, critics, sensitivity, and creativity in an integrated manner. Therefore, teaching methods are expected to become more suitable for the trend. In this belief, current teacher-leading education method should move to students' self motivating one and consist of programs in which students voluntarily involve. In this reason, this study suggests FPBL educational method model that is combines project-based learning with flipped learning by analysing preceding research and digital painting tool class was designed by applying it. As a result of applying the designed class model to the class, all of the class satisfaction, effectiveness, and interaction were evaluated positively. Problems such as limitations of project classes due to non-face-to-face classes, large amount of learning before class, and reduced concentration during class were found. Therefore, when the FPBL class model is conducted non-face-to-face, it will be necessary to further strengthen the role of the instructor, provide lecture videos summarizing the core contents, and improve concentration by providing active participation and fun using various digital tools. The result of the study looks significant by confirming the possibility of applying FPBL model not only in design education but also other educational settings.

기술초대석I - BIM Tool 소개 두번째 : Digital Project Part 2

  • Choe, Il-Seop;Choe, Seok-Dong;Kim, Ji-Hyeon
    • 건축구조
    • /
    • v.19 no.2
    • /
    • pp.76-83
    • /
    • 2012
  • 1, 2월호에서 Digital Project를 이용해서 한 개층의 BIM을 작성하는데 까지 알아보았다. 사실 단순히 따라하는 방식으로 Digital Project를 연재했지만 회지의 내용만으로도 제대로 모델링하기 힘들었을 것이다. DP에 대한 오프라인 교육을 기술사회 주관으로 다시 가질 예정이니 그 때 좀 더 자세한 내용을 제공받을 수 있을 것이다. 두 번째 내용은 Part1의 연장으로 층복사를 해서 층을 생성하고 완성 BIM 모멸을 활용하는 것에 대해 소개하겠다. 그전에 DP를 이용한 BIM 작성방법부터 알아보자.

  • PDF

Suggestions for improvement of domestic Digital Cultural Heritage from the analysis of EPOCH project (EPOCH 프로젝트를 바탕으로 한 국내 디지털 문화유산 발전방향의 제안)

  • Park, Min-Seo;Choi, Yeon-Hwa;Lim, Soon-Bum
    • Journal of Digital Contents Society
    • /
    • v.10 no.2
    • /
    • pp.225-231
    • /
    • 2009
  • As digital cultural heritages have been applied to various fields, more systematic research on the domestic digital cultural heritage need to be improved. The EPOCH project by European Union contributed to standardization of ICT+CH domain, creation of network between different organization, and study of socio-economic impact of digital cultural heritage. We can find a way to improve domestic digital cultural heritage projects by analyzing EPOCH project in each management technique culture view. Based on these analysis this paper suggests the necessity to establish an independent research domain for digital cultural heritage, investment in heritage sites by private companies, and research to fit better with the user's need, and study on business administration in digital cultural heritages.

  • PDF

On Study of Setting up Plan and Utilization of Project with Project Tool (프로젝트 툴을 이용한 일정 계획의 수립 및 활용 방안)

  • Kim Gil-Choon
    • Journal of Digital Contents Society
    • /
    • v.5 no.2
    • /
    • pp.106-113
    • /
    • 2004
  • Once the objective of project is set up to alter the present situation to acertain future situation necessary measures need to be taken to accomplish it. In the past, making a plan and transformation was done in the form of handwork, but this article addresses analyzing and handing the project data by using a tool of Microsoft Office System and then by making a reasonable plan. This system also helps transform project data into Excel data and analyze it using Excel, and transform project data into xml data and construct xml database so that it makes it possible to handle and use data efficiently, and to set up automatic project system in the future which leads to efficient project management.

  • PDF

A Performance Indicators of Living Lab Project in the Digital Social Innovation (디지털 사회 혁신에서 리빙랩 프로젝트의 성과지표에 대한 연구)

  • Lee, Jaehyeok;Lee, Junghoon;Cho, Kyounghwoan
    • Journal of Information Technology Services
    • /
    • v.18 no.5
    • /
    • pp.193-207
    • /
    • 2019
  • In recent years, Digital Social Innovation has been emerging at home and abroad and new solutions are being proposed by the perspective of User using digital technology in order to solve social and economic problems of the city. In addition, Living Labs which is an innovative tools and space enable to solve problems doing activities with various participants led by users. Therefore, this study aims to systematically manage the activities of Living Lab in Digital Social Innovation and improves the Living Lab sustainability using the performance indicators which are going to be developed. Furthermore, construct the appropriate indicator of each project process and take test at real Living Labs. As a result, performance indicator was derived from each procedure in the Living Lab project, and proved validity and reliability of the indicators through qualitative and quantitative methods by interviews and the questionnaire from the participants of Living Labs.

A Case Study on the Project Benefit of Digital Fabrication in Construction Projects (건설 프로젝트에서 디지털 패브리케이션의 프로젝트 이점에 대한 사례 연구)

  • Jung, Eui-Seok;Kim, Sung-Jin;Ham, Nam-Hyuk;Moon, Sung-Kon;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.8 no.2
    • /
    • pp.29-40
    • /
    • 2018
  • Recently, the free-form buildings are continuously increasing in the world. However, due to the shortage of experience and technology in the project of the free-form buildings, problems such as increase of construction cost, increase of air and deterioration of construction quality are occurring. In this study, data on the 27 free-form projects in Korea and abroad using digital fabrication were collected through the journals, reports, articles, and websites of the institutes and case studies were conducted based on the collected data. Based on the following case analysis, we conducted evaluation of case data analysis based on the knowledge domain specified in PMBOK. Evaluation of case data analysis shows that the application of digital fabrication is divided into positive and negative effects for each knowledge area in the free-form building project. Using the results of the analysis, we can confirm the knowledge field showing the positive effect on the free-form building project by using digital fabrication. However, the data scale of the project using the digital fabrication is not realized at present and research is insufficient. In Korea, a small number of specialists were interviewed and verified because experts do not exist much in korea. Therefore, this study is expected to suggest the necessity of applying digital fabrication in the free-form building projects in the construction industry.

Information Systems in Project Management of The Public Sphere

  • Mamatova, Tetiana;Chykarenko, Iryna;Chykarenko, Oleksii;Kravtsova, Тetiana;Kravtsov, Olеg
    • International Journal of Computer Science & Network Security
    • /
    • v.21 no.8
    • /
    • pp.141-148
    • /
    • 2021
  • Project management is a current trend of management in the public sphere, based on different principles, methods and tools. The tools include information technologies providing control over time, cost, quality and planning process in order to ensure accountability to interested parties. The goal of the research was to examine the impact of the integration of information systems in project management of the public sphere on the quality of public governance and administration using the example of infrastructure projects involving the private sector in developing countries. The methodology of the research is based on the concepts of "digital-era governance" (DEG), "Information governance" and "project governance" to determine the effectiveness of information systems and technologies in the management of infrastructure projects in the public sphere. The data from the countries with Lower middle income (India, Indonesia, Philippines, Ukraine, Vietnam) and Upper middle income (Argentina, Brazil, China, Colombia, Mexico, Peru, Romania, Russian Federation, Thailand, Turkey) for 1996-2020 were used to study the effects of DEG. The results show two main trends in the countries with Lower middle income and Upper middle income. The first trend is the development of digital governance, the concept of "digital-era governance" through information systems and performance measurement of the governance system, forecasting of investment flows of infrastructure projects, measurement of payback and effectiveness parameters for investment management in the public sector, decision support. The second trend is the existence of systemic challenges related to corruption, social and institutional factors through the development of democracy in developing countries and the integration of NPM similar to developed countries. The confidence of interested parties, especially private investors, in public authorities is determined by other factors - the level of return on investment, risks and assignment of responsibility, probability of successful completion of the project. These data still remain limited for a wide range of project participants, including citizens.