• Title/Summary/Keyword: Design-Build Contract

Search Result 48, Processing Time 0.018 seconds

Current trends of Military Air'craft Airworthiness certification using Civil Aircraft Certification Basis (민간 항공기 인증기술을 이용한 군용항공기 감항인증 효율화 기술동향)

  • Choi, Seok;Kim, Sung-Chan
    • Current Industrial and Technological Trends in Aerospace
    • /
    • v.6 no.2
    • /
    • pp.154-160
    • /
    • 2008
  • There are typically two categories of Flight Test Programs- commercial and military. Commercial flight testing is conducted to certify that aircraft meets all applicable safety and performance requirements of government certifying agency. Military programs differs from commercial in that the government contract with the aircraft manufacturer to design and build an aircraft to meet specific mission capabilities. The final phase of military aircraft flight test is the Operational Test(OT). OT is conducted by a government-only test team with the dictate to certify that the aircraft is suitable and effective to carry out the intended mission. This paper presents the current trends of military aircraft airworthiness certification using civil aircraft certification practices.

  • PDF

An Analysis on Expanding Construction Insurance and Estimating Necessary Budget (건설공사보험 확대 당위성 및 예산소요 분석 연구)

  • Kim, Myeongsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.94-102
    • /
    • 2014
  • This study analyzes necessity of expanding construction insurance and estimates required budget. Construction insurance is obliged by National Contract Law and Local Contract Law to protect projet owners and contractors from any unexpected construction risk such as financial losses in construction process. Currently the contracts of design-build and alternate-bid projects as well as PQ project, which are greater than 20 billion won, require the contractors to provide construction insurances in Korea. Insurance premiums are borne by the public project owner. Those contractors whose contract volume is less than 20 billion won burden all risks of projects at their cost. This causes equity problem. Because small-and-medium contractors are discriminated against large contractors since insurance-obliged projects are performed by large contractors and insurance premiums are borne by the public project owner. On the other hands, in all engineering projects, regardless of volume, insurance premiums are borne by the project owner. Therefore current regulation has to be improved, by expanding to all public projects. The average ratio of unobliged projects is 46%, in recent 3 years, prime cost of insurance companies is estimated 0.2%. Moreover considering risks of each construction type, prime cost of unobliged works is estimated as 0.13%. Hence additional necessary budget is estimated to be 2.09 billion won if total volume of public work is 3.5 trillion won. And 2.39 billion won is derived if total volume of public projects is 4 trillion won.

Introduction to CM Experience from Incheon International Airport (IIA) Construction Project (인천국제공항건설 사업관리 경험)

  • Park, Dae-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.20-25
    • /
    • 2004
  • On July $18^{th}$, 2003, Incheon International Airport Corporation(lIAC) signed the Construction Management Service Contract with KIDS consortium (composed of Kun-Won Eng., ITM Corp, Do-Hwa Eng, Space Croup) for the $2^{nd}$ phase construction protect consists of landfill, $\#3$ runway, remote Concourse, IAT, BHS, cargo terminal, etc scheduled to be finished by the end of 2008. KIDS dispatched qualified engineers to the Construction Management Division of IIAC for providing technical assistance to IIAC members to pursue project goals in tulle. within budget with appropriate quality level to build one of leading hul] airports for the Northeast Asia legion in the $21^{st}$ century. The work scope covers upgrading various project procedures and related computer programs, cost and schedule control, design supervision for building design including support systerns such as HVAC, fire protection, elevators and escalators, boarding bridges, electrical and communication systems, and technical support for IAT/BHS, QA/QC, field test and inspection, start-up and commissioning, etc. The purpose of this paper is to introduce the major activities of the Construction Management Services performing at the IIA project for your reference.

  • PDF

Effect of Multyparty Contract in IPD Project Case study of USA and Korean Projects (IPD 계약은 IPD 프로젝트의 필수조건인가 - 국내외 사례조사를 통하여 -)

  • Yoo, Seungeun;Kim, Taewan;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.3-16
    • /
    • 2017
  • Integrated project delivery (IPD) is suggested as an alternative to traditional delivery methods such as design-build (DB), design-bid-build (DBB), and construction management at risk (CMR). Many foreign research studies have approached IPD not only in the contractual aspect but also the work implementation method aspect. However, most research projects in Korea have focused on the contractual aspect of IPD for asserting that the characteristics are the critical matter. The Korean institutional and legal system does not permit the multi-party agreement; therefore, it is difficult to adopt IPD in Korea's construction industry. The researchers do not wait the system to be changed, but we do identify the possibility of adopting IPD in Korea in the perspective of work implementation method, except the contractual characteristics. Thus, the goal of this research is to identify one project that does not include IPD agreement but utilizes other IPD characteristics whose contractual results have similar performance to those that utilize all characteristics of IPD including agreement. This research is expected to enhance performance of the construction project in a Korean construction environment by embracing IPD characteristics as overcoming limits and bounds of the traditional delivery method.

A Selection Model of Suitable Tendering System for Public Construction Projects (공공건설공사의 최적 입찰방식 선정모델)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.164-174
    • /
    • 2008
  • It is crucial In decision making to select a project delivery system (PDS) adjusted accordingly to the project characteristics. Furthermore, selecting a tendering system is the kernel in the process of selecting PDS. In October 2007, the Ministry of Finance and the Economy of Korea launched two new project delivery systems, "Best Value Contract (Design-Bid-Build)" and "Bridging Contracts (Design-Build)" by revising enforcement ordinances of "Act on Contracts to Which the State is a Party" to provoke the tendering systems. In order to support the proposed purpose, this research developed a selection model for suitable tendering system, which helps a public owner select a tendering system appropriate to the project characteristics. First, the framework of the model was set throughout analyzing previous researches and interviewing relevant experts. Additionally, by analyzing the survey result from 265 experts engaged in architectural and civil engineering business, the relative weights of the selection factors and the effectiveness values of the alternatives were suggested as the quantitative evaluation references. Finally, the practical guideline was suggested to apply this model to three public projects scheduled to be delivered. The result of applying the model to three case projects showed that further researches were needed to make the selection process logical and to suggest the standard weights and effectiveness values according to project type.

A Proposal on Blockchain-based Artwork Trading System for Popularization of Fine Art (예술의 대중화를 위한 블록체인 기반 예술품 거래 플랫폼 제안)

  • Lee, Eun Mi
    • Journal of the Korea Convergence Society
    • /
    • v.9 no.10
    • /
    • pp.209-215
    • /
    • 2018
  • The level of cultural enjoyment in Korea has improved every year, but the culture that the general public possesses artworks has not developed so much. Most artwork trading systems, from traditional ones to the latest blockchain-based ones, are designed for expensive artwork trading and are hardly accessible to the general public. In this paper, we propose a blockchain-based artwork trading system that can improve the culture of the general public's art collection and contribute to the popularization of fine art. The proposed system consists of three interacted blockchains for identification, artwork registration and smart contract. The proposed system utilizes the advantages of the blockchain system for users to provide trust to each other, and introduces the concept of art notebook for artists to build trust in their own artwork. Since the proposed system builds a trust system through participants rather than experts or external organizations, it can reduce the cost of trading and deal with artworks that can be owned by the general public.

Characteristic Analysis of Major Issues in Negotiating Concession Agreement for BTO Projects Using AHP (AHP 기법을 이용한 BTO 민간투자사업 협상의 주요쟁점 특성분석)

  • Roh, Tae-Ho
    • The Journal of the Korea Contents Association
    • /
    • v.7 no.8
    • /
    • pp.234-244
    • /
    • 2007
  • Both competent authorities and private entrepreneurs face plenty of risks when negotiating BTO(Build Transfer Operation) methods of PPI(Private Participations in Infrastructures) projects. Also, success and failure of projects largely depend on the concession agreement contract. In this study, for more efficient negotiation, major issues are examined, and quantitatively analyzed to find out not only the relationship but also the characteristics of which these issues share. Questionnaire research was conducted through both research and by experts who were divided into an ordering agency, design company and constructor. Characteristics of major issues were quantitatively analyzed using the Likert index method, ANOVA(ANalysis of VAriance) and AHP(Analytic Hierarchy Process) analysis. Case studies were examined in order to estimate construction cost, rates of return, government finance support, level of operation-revenues guarantees, estimating operational costs and usage fees. With these 6 items, relative priority, relative impression which is sensible to risk and extent of difficulty in presenting data which is objective were quantitatively analyzed by the ordering agency, design company and constructor groups. From the analysis, there were some similarities between the design company and constructor groups while there was less of similarities between the ordering agency and design company or constructor. The government is diversifying the methods of project promotion, and PPI project from infrastructure-centered to public culture facilities are being expand. The current study will provide not only supporting efficient negotiation but also revitalizing PPI projects.

A Study on Characteristic Analysis of Major Issues in Negotiating Concession Agreement for BTO Projects Using AHP (계층화분석법에 의한 BTO 민간투자사업 협상의 주요쟁점 특성분석에 관한 고찰)

  • Roh, Tae-Ho;Kim, Jong-Won;Lim, Chang-Sik;Lee, Jong-Chool
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.137-146
    • /
    • 2008
  • Both competent authorities and private entrepreneurs face plenty of risks when negotiating BTO(Build Transfer Operation) methods of PPI(Private Participations in Infrastructures) projects. Also, success and failure of projects largely depend on the concession agreement contract. In this study, for more efficient negotiation, major issues are examined, and quantitatively analyzed to find out not only the relationship but also the characteristics of which these issues share. Questionnaire research was conducted through both research and by experts who were divided into an ordering agency, design company and constructor. Characteristics of major issues were quantitatively analyzed using the Likert index method, ANOVA(ANalysis of VAriance) and AHP(Analytic Hierarchy Process) analysis. Case studies were examined in order to estimate construction cost, rates of return, government finance support, level of operation-revenues guarantees, estimating operational costs and usage fees. With these 6 items, relative priority, relative impression which is sensible to risk and extent of difficulty in presenting data which is objective were quantitatively analyzed by the ordering agency, design company and constructor groups. From the analysis, there were some similarities between the design company and constructor groups while there was less of similarities between the ordering agency and design company or constructor. The government is diversifying the methods of project promotion, and PPI project from infrastructure-centered to public culture facilities are being expand. The current study will provide not only supporting efficient negotiation but also revitalizing PPI projects.