Characteristic Analysis of Major Issues in Negotiating Concession Agreement for BTO Projects Using AHP

AHP 기법을 이용한 BTO 민간투자사업 협상의 주요쟁점 특성분석

  • Published : 2007.08.28

Abstract

Both competent authorities and private entrepreneurs face plenty of risks when negotiating BTO(Build Transfer Operation) methods of PPI(Private Participations in Infrastructures) projects. Also, success and failure of projects largely depend on the concession agreement contract. In this study, for more efficient negotiation, major issues are examined, and quantitatively analyzed to find out not only the relationship but also the characteristics of which these issues share. Questionnaire research was conducted through both research and by experts who were divided into an ordering agency, design company and constructor. Characteristics of major issues were quantitatively analyzed using the Likert index method, ANOVA(ANalysis of VAriance) and AHP(Analytic Hierarchy Process) analysis. Case studies were examined in order to estimate construction cost, rates of return, government finance support, level of operation-revenues guarantees, estimating operational costs and usage fees. With these 6 items, relative priority, relative impression which is sensible to risk and extent of difficulty in presenting data which is objective were quantitatively analyzed by the ordering agency, design company and constructor groups. From the analysis, there were some similarities between the design company and constructor groups while there was less of similarities between the ordering agency and design company or constructor. The government is diversifying the methods of project promotion, and PPI project from infrastructure-centered to public culture facilities are being expand. The current study will provide not only supporting efficient negotiation but also revitalizing PPI projects.

BTO 민간투자사업에 대한 실시협약체결 협상시 주무관청이나 사업시행자 모두 많은 제약과 리스크를 가지고 협상하게 되며, 협상 결과에 따라 사업의 성패에 큰 영향을 미친다. 따라서 중요한 협상 단계에서 좀 더 효과적인 협상과 결과를 얻기 위하여 협상시 가장 주요한 쟁점들을 추출하고, 이러한 주요쟁점들이 상호간에 어떤 특성을 내포하는지를 정량적으로 분석하였다. 분석방법은 문헌연구, 연구 보고서 등과 전문가들을 대상으로 발주청, 설계사, 시공사 그룹으로 분류하여 설문조사를 수행하였고 Likert 척도, ANOVA 분석, AHP 분석 등을 통하여 주요쟁점들의 특성을 정량적으로 분석하였다. 분석 결과 주요쟁점들은 공사비 산정, 수익률, 정부재정지원, 사용료 수입보장수준, 운영비 산정, 사용료 등의 순서로 나타났으며, 또한 그룹별로 6개 항목들에 대한 상대적 중요도, 리스크를 느끼는 상대적 크기, 항목간의 객관적 자료 제시의 어려운 정도 등이 정량적으로 분석되었다. 그리고 설계사 그룹과 시공사 그룹은 다소 유사성을 갖고 있으나, 발주청 그룹은 설계사 그룹 또는 시공사 그룹과의 유사성이 적은 것으로 나타났다. 향후 민간투자사업은 계속 증가될 전망이므로 본 연구에서 제시된 내용들은 합리적인 협상에 도움 및 민간투자사업 활성화에 기여할 것으로 예상된다.

Keywords