• Title/Summary/Keyword: Design-Build Contract

Search Result 48, Processing Time 0.024 seconds

Working Design Management of the Design Build Projects Using CBR (CBR(Case-Based Reasoning)을 활용한 턴키 공사 실시설계관리 방안)

  • Park Se-Kun;Kim Young-Jae;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.432-437
    • /
    • 2002
  • As the working design process of Turn-Key projects is a basic process for the final contract, this process has lots of business decision to be made. Because such results of business decision can be the basis on contract documents, it is the step which needs a through management for Turn-key project. But in case of domestic construction companies, because those are not organized process of working design process, project manager has had lots of trouble at each process to make the business decision. As a means of settling the problems, this research is initiated. First, working decision management process is identified and generalized by interviews with project managers. Second, cases that actually happened in the project are investigated and categorized. Third, response plan to solve the problems and check lists to prevent the problems are suggested. Finally, the process, cases, response plan, and check list are integrated using CBR for future reuse.

  • PDF

A Study of Analysis for Impact Assessment of the Cost Risk-Factor on the Design-Build Projects based on Business Process (설계시공일괄방식 사업의 업무단계별 사업비용 리스크요인에 대한 영향도 평가 및 분석)

  • Seo, Jae-Pil;Lee, Sang-Hyun;Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.14-24
    • /
    • 2012
  • Recently, a delivery system has been rapidly changed in the global construction market. Also, construction projects are becoming bigger and more technology-intensive. A lot of projects have been delivered by Design-Build(DB) System; from the standpoint of cost, approximately 40% of delivered constructions by a Public Procurement Service were DB in 2009. Nevertheless, the achievement has not surpassed our expectations on management of the project cost. On the characteristic of DB, the reasons why that happens are that projects contract have been signed after the Design Development Stage; the insufficient review about new technology and up-to-date construction methods; a lack of discussion in process of design. Those reasons cause a risk of increasing Cost of the projects. In order to solve these problems, it is desirable to find Cost-increasing factors in promoting the projects and select on the order of priority for Risk-Factor with careful management. Therefore, this study analyzed the weight of each phase of the project on the authority of properties of DB project, and identified Risk-factors which is increasing the cost on the aspect of project management. Based on this analysis, the impact assessment of Risk-factor is evaluated through the Failure Mode and Effect Analysis(FMEA).

- A Case Study on OOP Component Build-up for Reliability of MRP System - (MRP 시스템의 신뢰성을 위한 객체재향 컴포넌트 개발 사례)

  • Seo Jang Hoon
    • Journal of the Korea Safety Management & Science
    • /
    • v.6 no.3
    • /
    • pp.211-235
    • /
    • 2004
  • Component based design is perceived as a key technology for developing advanced real-time systems in a both cost- and time effective manner. Already today, component based design is seen to increase software productivity, by reducing the amount of effort needed to update and maintain systems, by packaging solutions for re-use, and easing distribution. Nowdays, a thousand and one companies in If(Information Technology) industry such as Sl(System Integration) and software development companies, regardless of scale of their projects, has spent their time and endeavor on developing reusable business logic. The component software is the outcome of software developers effort on overcoming this problem; the component software is the way propositioned for quick and easy implementation of software. In addition, there has been lots of investment on researching and developing the software development methodology and leading If companies has released new standard technologies to help with component development. For instance, COM(Component Object Model) and DCOM(Distribute COM) technology of Microsoft and EJB(Enterprise Java Beans) technology of Sun Microsystems has turned up. Component-Based Development (CBD) has not redeemed its promises of reuse and flexibility. Reuse is inhibited due to problems such as component retrieval, architectural mismatch, and application specificness. Component-based systems are flexible in the sense that components can be replaced and fine-tuned, but only under the assumption that the software architecture remains stable during the system's lifetime. In this paper, It suggest that systems composed of components should be generated from functional and nonfunctional requirements rather than being composed out of existing or newly developed components. about implements and accomplishes the modeling for the Product Control component development by applying CCD(Contract-Collaboration Diagram), one of component development methodology, to MRP(Material Requirement Planning) System

A Pilot Study on the Present State and Transformation of Construction Management Actors of USFK's EC Projects (주한 미군 EC 프로젝트의 현황과 시공관리 주체의 변화에 대한 기초연구)

  • Kim, Duk-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.65-75
    • /
    • 2006
  • Emerging trends regarding USFK(United States Forces, Korea)'s EC(Engineering/Construction) market include: (1) introduction of MATOC(Multiple Award Task Order Contract); (2) increase of DB(Design-Build) contract; and (3) encroachment of large US-origin private EC firms upon Korea. This study analyzes the change of USFK's EC market with focus on the change of construction management actors for USFK's EC projects. Specifically, USFK's EC projects have been managed by FED(Far East District). Recently, however, the large US private EC companies substitute the role previously taken by FED. This phenomenon is accelerated by the business chances in Korea due to LPP(Land Partnership Plan) and intentions of US Government to save military construction costs by means of utilizing US private EC companies. The large US EC firms entering into Korea are business opportunities as well as challenges to Korean EC firms, which are contracting USFK's EC projects. This study concludes that, through teaming joint venture with the large US EC firms, the market changes can be opportunities to acquire foreign market information and learn advanced construction management skill from them.

A study on the Ethics Characteristics according to Service and Practice of Construction Manager (건설사업관리자의 업무수행에 따른 윤리 특성 고찰)

  • Lee, Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.97-106
    • /
    • 2011
  • Construction Management is the overall management of the project as construction manager and the owner are united together. Construction manager's role is to conduct the overall or partial construction administration in the 'design, bid, build' process, in the owner's interests with maintaining technical neutrality. Construction manager is becoming one of new professionals in the building process and the contract defines their roles and the range of services, so high level of ethnics are required. This study suggests the legal status of the construction manager and the ethnic standards and the ethnic's characteristics. In conclusion, firstly, the legal characteristics of the administration of construction management are the delegations contract, the responsibility of negligence and the duty of due diligence, abided by the contract that ties between the owner and the construction manger. Secondly, the administerial characteristics of the construction management are the role of mediator, the service of professional technology, accountability to the owner and publicness. Thirdly, due to these characteristics, as a professional, the standard of ethnic assessment for the construction project manager are intention, act and result, so with the relation to that, morality, deontology and consequentialism have been suggested in this study.

Customer and Sales Orientation of Franchising-Based Insurance Agent Format: Their Effects on Customer Trust, Identification, and Intention to Renewal Contract : focused on the social exchange theory (프랜차이즈 기반 보험설계사의 고객지향성과 판매지향성이 고객 신뢰, 일체감, 그리고 재계약의도에 미치는 영향: 사회교환이론을 중심으로)

  • Joon-Ho MOON;Yong-Ki LEE;Soon-Tae LEE
    • The Korean Journal of Franchise Management
    • /
    • v.15 no.3
    • /
    • pp.1-15
    • /
    • 2024
  • Purpose: The insurance market is steadily growing, with General Agencies (GA) experiencing rapid sales increases. GAs need marketing strategies to boost contract renewal intentions by effectively managing customer relationships. This study examines the impact of perceived customer orientation and sales orientation on customer trust, identification, and renewal intentions with GA insurance planners. Research design, data, and methodology: The study surveyed customers who subscribe to insurance products from GA-affiliated insurance planners. Out of 615 respondents, 251 valid responses were analyzed using frequency analysis, measurement models, and structural equation modeling (SEM) with SmartPLS 4.0. Result: The study revealed that customer orientation positively affects cognitive trust and sense of identification. In contrast, sales orientation did not significantly impact customer trust or identification. Additionally, customer trust positively influences sense of identification, and both trust and identification positively affect the intention to renew the contract. Conclusions: Implementing a customer-oriented marketing strategy is essential for providing tailored customer management services and maintaining or improving the quality of customer relationships for insurance planners. Given that insurance products require long-term management, it is crucial for planners to build trust, enhance customer identification, and offer continuous customer management to meet customers' needs effectively.

Steel Plant Construction (EPC) Project Case Study : Forensic Lessons-learned Analysis and Systems Engineering Improvement Recommendation

  • Kyung-Bae Jin;Young-Ho Kim;Eul-Bum Lee;Suk-Hwan Seo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.145-150
    • /
    • 2013
  • As a recent global trend, the majority of mega-size plant projects are delivered through EPC (Engineering, Procurement and Construction) contracts, where a single contract is awarded for engineering, procurement, and construction. Under this contracting mechanism, it is challenging for contractors to carry out the projects under traditional project management processes used in design-bid-build projects. A new EPC Plant, the POSCO Special Steel Plant in Changwon, was built successfully at the beginning of 2012 and it is currently in full-scale production. The project has encountered a number of major difficulties however, with some technical and managerial issues through its development process. As summarized in this paper, the authors (as project participants with the contractor) investigated it as a post construction analysis and recorded the Lessons-learned for future project management improvement.

  • PDF

A Study on the Prevention for Differing Site Conditions Claims - Focused on Design-Build Project in Public Sector - (현장여건상이로 인한 클레임의 예방에 관한 연구 -공공부문의 설계$\cdot$시공일괄공사를 중심으로-)

  • Chung Myung-Woo;Lee Hwa-Young;Seo Yong-Chil;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.46-53
    • /
    • 2001
  • Differing Site Conditions('DSC') Claims among construction claims are on the increase as a direct result of the steady construction of Social Overhead Capital Facilities initiated by Government. As DSC claims generally became apparent during the intial stage of the construction project, it is necessary to timely review and study the proposal on the prevention of DSC claims because delayed settlement will incur more substantial damages to all parties concerned. This research is focused on the identification and analysis of the causes for DSC claims as applicable to design-build project in public sector and it presents the possible short term, medium and long term proposals on the improvement of causes related with DSC claims. The major results of this research are summarized as follows: 1. Improvement of contractor's tender practice 2. Contractor's division of responsibility on the site survey 3. Improvement of owner's exculpatory clause 4. Flexibility on the adjustment of contract amount The proposals stated above could be useful in resolving the DSC claims between owner and contractors.

  • PDF

Analysis of Domestic and Overseas Environment to Introduce Performance Warranty Contracting for Pavements into Korea (도로포장 성능보증계약제도 도입을 위한 국내외 적용환경 분석)

  • Kim, Tea-Song;Seo, Yong-Chil;Lee, Sang-Beom;Koo, Jai-Dong;Kim, Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.216-221
    • /
    • 2008
  • This study has been carried out in order to observe the status of performance warranty contracting system currently being implemented at the advanced countries including Europe, U.S.A., and Japan, review the introduction feasibility and possibility. For this purposes this study has surveyed the concept and necessity of performance warranty contracting system as well as the status of domestic performance warranty contracting system. Especially the application environment for the performance warranty contracting system of Europe, U.S.A., Japan and Korea in terms of maintenance guarantee liability system, performance warranty regulations for design-build contracting system, selection method of successful bidder, performance warranty means, project contracting system including maintenance cost, and specifications and contract conditions for performance warranty system have been comparatively evaluated. And introduction methods of performance warranty contracting system were suggested.

  • PDF

A Study on the Current Status of Application of Construction Management in Pusan National University Yangsan Hospital and Guidelines for CM Improvement (양산 부산대학교병원의 건설사업관리 적용현황과 발전 방향)

  • Park, Jong-Soon;Shin, Chang-Joon;Yoo, Byeong-Gi;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.5-12
    • /
    • 2008
  • The construction of Pusan National University Yangsan Hospital is a new construction of a medical town in Yangsan. It is a case that CMr participated in the project from planning to post-completion. It shows an actual proof of Construction Management business applied CM by each phase. In this case, CMr selected the design-build contractor in the planning phase and technically performed CM businesses in every single phase such as design and construction schedule management regarding application of Fast Track technique, procurement management and contract administration in phases based on the Fast-tract; technique, design review, VE in the design phase, change order management in the construction phase and operating and maintenance in the post-construction phase. This study would go far toward applying CM to Mega Turnkey projects by analyzing the problems of CMr's practical application to the project and providing guidelines for effective and efficient CM business implementation especially in the Turnkey projects.

  • PDF