Park Se-Kun;Kim Young-Jae;Kim Kyung-Rai;Shin Dong-Woo
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.432-437
/
2002
As the working design process of Turn-Key projects is a basic process for the final contract, this process has lots of business decision to be made. Because such results of business decision can be the basis on contract documents, it is the step which needs a through management for Turn-key project. But in case of domestic construction companies, because those are not organized process of working design process, project manager has had lots of trouble at each process to make the business decision. As a means of settling the problems, this research is initiated. First, working decision management process is identified and generalized by interviews with project managers. Second, cases that actually happened in the project are investigated and categorized. Third, response plan to solve the problems and check lists to prevent the problems are suggested. Finally, the process, cases, response plan, and check list are integrated using CBR for future reuse.
Seo, Jae-Pil;Lee, Sang-Hyun;Song, Young-Woong;Choi, Yoon-Ki
Korean Journal of Construction Engineering and Management
/
v.13
no.3
/
pp.14-24
/
2012
Recently, a delivery system has been rapidly changed in the global construction market. Also, construction projects are becoming bigger and more technology-intensive. A lot of projects have been delivered by Design-Build(DB) System; from the standpoint of cost, approximately 40% of delivered constructions by a Public Procurement Service were DB in 2009. Nevertheless, the achievement has not surpassed our expectations on management of the project cost. On the characteristic of DB, the reasons why that happens are that projects contract have been signed after the Design Development Stage; the insufficient review about new technology and up-to-date construction methods; a lack of discussion in process of design. Those reasons cause a risk of increasing Cost of the projects. In order to solve these problems, it is desirable to find Cost-increasing factors in promoting the projects and select on the order of priority for Risk-Factor with careful management. Therefore, this study analyzed the weight of each phase of the project on the authority of properties of DB project, and identified Risk-factors which is increasing the cost on the aspect of project management. Based on this analysis, the impact assessment of Risk-factor is evaluated through the Failure Mode and Effect Analysis(FMEA).
Component based design is perceived as a key technology for developing advanced real-time systems in a both cost- and time effective manner. Already today, component based design is seen to increase software productivity, by reducing the amount of effort needed to update and maintain systems, by packaging solutions for re-use, and easing distribution. Nowdays, a thousand and one companies in If(Information Technology) industry such as Sl(System Integration) and software development companies, regardless of scale of their projects, has spent their time and endeavor on developing reusable business logic. The component software is the outcome of software developers effort on overcoming this problem; the component software is the way propositioned for quick and easy implementation of software. In addition, there has been lots of investment on researching and developing the software development methodology and leading If companies has released new standard technologies to help with component development. For instance, COM(Component Object Model) and DCOM(Distribute COM) technology of Microsoft and EJB(Enterprise Java Beans) technology of Sun Microsystems has turned up. Component-Based Development (CBD) has not redeemed its promises of reuse and flexibility. Reuse is inhibited due to problems such as component retrieval, architectural mismatch, and application specificness. Component-based systems are flexible in the sense that components can be replaced and fine-tuned, but only under the assumption that the software architecture remains stable during the system's lifetime. In this paper, It suggest that systems composed of components should be generated from functional and nonfunctional requirements rather than being composed out of existing or newly developed components. about implements and accomplishes the modeling for the Product Control component development by applying CCD(Contract-Collaboration Diagram), one of component development methodology, to MRP(Material Requirement Planning) System
Korean Journal of Construction Engineering and Management
/
v.7
no.3
s.31
/
pp.65-75
/
2006
Emerging trends regarding USFK(United States Forces, Korea)'s EC(Engineering/Construction) market include: (1) introduction of MATOC(Multiple Award Task Order Contract); (2) increase of DB(Design-Build) contract; and (3) encroachment of large US-origin private EC firms upon Korea. This study analyzes the change of USFK's EC market with focus on the change of construction management actors for USFK's EC projects. Specifically, USFK's EC projects have been managed by FED(Far East District). Recently, however, the large US private EC companies substitute the role previously taken by FED. This phenomenon is accelerated by the business chances in Korea due to LPP(Land Partnership Plan) and intentions of US Government to save military construction costs by means of utilizing US private EC companies. The large US EC firms entering into Korea are business opportunities as well as challenges to Korean EC firms, which are contracting USFK's EC projects. This study concludes that, through teaming joint venture with the large US EC firms, the market changes can be opportunities to acquire foreign market information and learn advanced construction management skill from them.
Korean Journal of Construction Engineering and Management
/
v.12
no.1
/
pp.97-106
/
2011
Construction Management is the overall management of the project as construction manager and the owner are united together. Construction manager's role is to conduct the overall or partial construction administration in the 'design, bid, build' process, in the owner's interests with maintaining technical neutrality. Construction manager is becoming one of new professionals in the building process and the contract defines their roles and the range of services, so high level of ethnics are required. This study suggests the legal status of the construction manager and the ethnic standards and the ethnic's characteristics. In conclusion, firstly, the legal characteristics of the administration of construction management are the delegations contract, the responsibility of negligence and the duty of due diligence, abided by the contract that ties between the owner and the construction manger. Secondly, the administerial characteristics of the construction management are the role of mediator, the service of professional technology, accountability to the owner and publicness. Thirdly, due to these characteristics, as a professional, the standard of ethnic assessment for the construction project manager are intention, act and result, so with the relation to that, morality, deontology and consequentialism have been suggested in this study.
Purpose: The insurance market is steadily growing, with General Agencies (GA) experiencing rapid sales increases. GAs need marketing strategies to boost contract renewal intentions by effectively managing customer relationships. This study examines the impact of perceived customer orientation and sales orientation on customer trust, identification, and renewal intentions with GA insurance planners. Research design, data, and methodology: The study surveyed customers who subscribe to insurance products from GA-affiliated insurance planners. Out of 615 respondents, 251 valid responses were analyzed using frequency analysis, measurement models, and structural equation modeling (SEM) with SmartPLS 4.0. Result: The study revealed that customer orientation positively affects cognitive trust and sense of identification. In contrast, sales orientation did not significantly impact customer trust or identification. Additionally, customer trust positively influences sense of identification, and both trust and identification positively affect the intention to renew the contract. Conclusions: Implementing a customer-oriented marketing strategy is essential for providing tailored customer management services and maintaining or improving the quality of customer relationships for insurance planners. Given that insurance products require long-term management, it is crucial for planners to build trust, enhance customer identification, and offer continuous customer management to meet customers' needs effectively.
Kyung-Bae Jin;Young-Ho Kim;Eul-Bum Lee;Suk-Hwan Seo
International conference on construction engineering and project management
/
2013.01a
/
pp.145-150
/
2013
As a recent global trend, the majority of mega-size plant projects are delivered through EPC (Engineering, Procurement and Construction) contracts, where a single contract is awarded for engineering, procurement, and construction. Under this contracting mechanism, it is challenging for contractors to carry out the projects under traditional project management processes used in design-bid-build projects. A new EPC Plant, the POSCO Special Steel Plant in Changwon, was built successfully at the beginning of 2012 and it is currently in full-scale production. The project has encountered a number of major difficulties however, with some technical and managerial issues through its development process. As summarized in this paper, the authors (as project participants with the contractor) investigated it as a post construction analysis and recorded the Lessons-learned for future project management improvement.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.46-53
/
2001
Differing Site Conditions('DSC') Claims among construction claims are on the increase as a direct result of the steady construction of Social Overhead Capital Facilities initiated by Government. As DSC claims generally became apparent during the intial stage of the construction project, it is necessary to timely review and study the proposal on the prevention of DSC claims because delayed settlement will incur more substantial damages to all parties concerned. This research is focused on the identification and analysis of the causes for DSC claims as applicable to design-build project in public sector and it presents the possible short term, medium and long term proposals on the improvement of causes related with DSC claims. The major results of this research are summarized as follows: 1. Improvement of contractor's tender practice 2. Contractor's division of responsibility on the site survey 3. Improvement of owner's exculpatory clause 4. Flexibility on the adjustment of contract amount The proposals stated above could be useful in resolving the DSC claims between owner and contractors.
Kim, Tea-Song;Seo, Yong-Chil;Lee, Sang-Beom;Koo, Jai-Dong;Kim, Kyong-Ju
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.216-221
/
2008
This study has been carried out in order to observe the status of performance warranty contracting system currently being implemented at the advanced countries including Europe, U.S.A., and Japan, review the introduction feasibility and possibility. For this purposes this study has surveyed the concept and necessity of performance warranty contracting system as well as the status of domestic performance warranty contracting system. Especially the application environment for the performance warranty contracting system of Europe, U.S.A., Japan and Korea in terms of maintenance guarantee liability system, performance warranty regulations for design-build contracting system, selection method of successful bidder, performance warranty means, project contracting system including maintenance cost, and specifications and contract conditions for performance warranty system have been comparatively evaluated. And introduction methods of performance warranty contracting system were suggested.
Park, Jong-Soon;Shin, Chang-Joon;Yoo, Byeong-Gi;Chun, Jae-Youl
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.5-12
/
2008
The construction of Pusan National University Yangsan Hospital is a new construction of a medical town in Yangsan. It is a case that CMr participated in the project from planning to post-completion. It shows an actual proof of Construction Management business applied CM by each phase. In this case, CMr selected the design-build contractor in the planning phase and technically performed CM businesses in every single phase such as design and construction schedule management regarding application of Fast Track technique, procurement management and contract administration in phases based on the Fast-tract; technique, design review, VE in the design phase, change order management in the construction phase and operating and maintenance in the post-construction phase. This study would go far toward applying CM to Mega Turnkey projects by analyzing the problems of CMr's practical application to the project and providing guidelines for effective and efficient CM business implementation especially in the Turnkey projects.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.