• Title/Summary/Keyword: Design for test

Search Result 17,930, Processing Time 0.048 seconds

Research on accelerated life test of pneumatic cylinder using two-way factorial design (이원배치법을 이용한 공기압 실린더의 가속수명시험에 관한 연구)

  • Kang, Bo-Sik;Kim, Hyoung-Eui;Yoo, Yung-Chul
    • Proceedings of the KSME Conference
    • /
    • 2008.11a
    • /
    • pp.1303-1308
    • /
    • 2008
  • In this study, we researched how to estimate life-stress relationship and acceleration factor through performing accelerated life test and analyzing it. The purpose of this study is to predict life of pneumatic cylinder within short time which is widely used in automation manufacturing line. In design of accelerated life test, we selected operating pressure and load that have the most influence on main failure mode of pneumatic cylinder as accelerated factor. We used two-way factorial design for arranging of test condition to accelerated factor and accelerated level.

  • PDF

A study on the design of layout for test work (테스트워크의 스트립 레이아웃설계에 관한 연구)

  • Kim, Sei-hwan;Choi, Kye-kwang
    • Design & Manufacturing
    • /
    • v.6 no.1
    • /
    • pp.34-38
    • /
    • 2012
  • Test work is the press die branch at The Korea-China-Japan Grand Prize Contest. This study focuses on strip layout design for test work. A comparison is drawn between product shape and blank deployment line. During the forming analysis of the whole product, shape part of the total forming process is analyzed. As for forming part and flange deployment, forming analysis is carried out in part during the mid process. Material utilization is 42.6 percent and strip layout design is completed in 14 processes that are comprised of hourglass, slotting, embossing, drawing and trimming.

  • PDF

Verification of System using Master-Slave Structure (Master-Slave 기법을 적용한 System Operation의 동작 검증)

  • Kim, In-Soo;Min, Hyoung-Bok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.1
    • /
    • pp.199-202
    • /
    • 2009
  • Scan design is currently the most widely used structured Design For Testability approach. In scan design, all storage elements are replaced with scan cells, which are then configured as one or more shift registers(also called scan chains) during the shift operation. As a result, all inputs to the combinational logic, including those driven by scan cells, can be controlled and all outputs from the combinational logic, including those driving scan cells, can be observed. The scan inserted design, called scan design, is operated in three modes: normal mode, shift mode, and capture mode. Circuit operations with associated clock cycles conducted in these three modes are referred to as normal operation, shift operation, and capture operation, respectively. In spite of these, scan design methodology has defects. They are power dissipation problem and test time during test application. We propose a new methodology about scan shift clock operation and present low power scan design and short test time.

Integration, Verification, Qualification Activities for KASS System (KASS 시스템 통합 및 검증 활동)

  • Hwanho Jeong;Minhyuk Son;ByungSeok Lee
    • Journal of Advanced Navigation Technology
    • /
    • v.27 no.6
    • /
    • pp.782-787
    • /
    • 2023
  • Korea augmentation satellite system (KASS) integration, verification, qualification (IVQ) activity is verification of requirements for KASS system and its sub-system that were performed based on the inspection, analysis, review of design, test (IART) method from factory acceptance test (FAT) to test readiness review (TRR) after critical design review (CDR) was closed. In the FAT phase, developed equipment was installed on the test platform and we were verified interfaces between sub-systems and coupling test with the kass control station (KCS). In the site aceeptance test (SAT) phase, on-site verification was conducted by installing equipment verified by FAT such as kass reference station (KRS), kass processing station (KPS), kass uplink station (KUS), KCS. However, considering the developed plan and status, SAT was divided into 3 phases and coupling test was performed. In the TRR phase, the KASS system verification was performed through FAT's test list and additional test list using the satellite based augmentation system (SBAS) broadcast signal from geostationary earth orbit (GEO) 1.

A Study on Test Generation for Domino CMOS Logic Circuits (domino CMOS 논리회로의 테스트 생성에 관한 연구)

  • 이재민;이준모;정준모
    • Journal of the Korean Institute of Telematics and Electronics
    • /
    • v.27 no.7
    • /
    • pp.1118-1127
    • /
    • 1990
  • In this paper a new test generation method for Domino CMOS logic circuits is proposed. Because the stuck-at type fault is not adequate for Domino CMOS circuits the stuck-open fault, stuck-on fault and bridging fault are considered as fault models. It is shown that the test generation problem of Domino CMOS circuits results in functional block test generation problem. Test set is generated by using the logic minimizer which is a part of logic design system. An algorithm for reduction of test set is described. The proposed test method can be easily applied to various figures of circuits and make it easy to construct automatic test generator in design system. The proposed algorithms are programed and their efficiency is confirmed by examples.

  • PDF

Design of Vessel Assembly for Fuel Irradiation Test in Reactor (원자로 내 핵연료조사시험용 압력용기조립체 설계)

  • Park, Kook-Nam;Lee, Jong-Min;Chi, Dae-Young;Park, Su-Ki;Lee, Chung-Young;Kim, Young-Jin
    • Proceedings of the KSME Conference
    • /
    • 2004.11a
    • /
    • pp.383-387
    • /
    • 2004
  • The Fuel Test Loop (FTL) consists of In-Pile Test Section (IPS) and Out-of-Pile System (OPS). The test condition in IPS such as pressure, temperature and quality of the main cooling water, can be controlled by the OPS. The FTL has been developed to be able to irradiate three pins to the core irradiation hole (IR1 hole) by considering for its utility and user's irradiation requirement. The IPS vessel assembly (IVA) consists of IPS head, outer pressure vessel, inner pressure vessel, inner assembly and test fuel carrier. The IVA is approximately 5.6 m long and fits within a 74 mm in diameter envelope over the full height of the chimney. Above the top of the chimney, the head of the IPS is enlarged to allow the closure flanges and pipe work connections. IVA was designed to test the CANDU and PWR nuclear fuel pin together. Specially, wished to minimize interference by nuclear fuel change in design and synthesize these items and shape design for IVA.

  • PDF

Design Driven Testing on Adaptive Use Case Approach for Real Time System (실시간 시스템을 위한 어댑티브 유스 케이스 방법상의 디자인 지향 테스트)

  • Kim Young-Chul;Joo Bok-Gyu
    • Journal of Internet Computing and Services
    • /
    • v.4 no.6
    • /
    • pp.1-11
    • /
    • 2003
  • This paper is introduced about Design driven testing, for real time system, based on use case approaches, We focuses on a part of an extended use case approach for real time software development, which partitions design schema into layered design component architecture of functional components called "design component", We developed a use case action matrix to contain a collection of related scenarios each describing a specific variant of an executable sequence of use case action units, which reflected the behavioral properties of the real time system design, in this paper, we attempt to apply real time system with design driven testing with test plan metrics which is introduced which produces an ordering of this scenario set to enhance productivity and both promote and capitalize on test case reusability of existing scenarios.scenarios.

  • PDF

A Study on the Development of Traction Motor for Electric Railway: Insulation System Design & Performance Test

  • Wang, Jong-Bae
    • Transactions on Electrical and Electronic Materials
    • /
    • v.2 no.4
    • /
    • pp.19-23
    • /
    • 2001
  • In this paper, design considerations and manufacturing procedure of 200 class insulation system with polyimide(Kapton) main insulation and silicone resin VPI process on the traction motor thor EMU will be reviewed. The performance test and the long life evaluation test that prove stability and reliability of Insulation system for traction motor will also be introduced.

  • PDF