• Title/Summary/Keyword: Design for test

Search Result 17,930, Processing Time 0.05 seconds

A Method of Reliability Growth Management Test Design for Continuous System (연속형 시스템의 신뢰성 성장 관리 시험 설계 방안)

  • Seo, Yang Woo;Yoon, Jung Hwan;Lee, Seung Sang;Um, Chun Sup
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.16 no.2
    • /
    • pp.87-96
    • /
    • 2020
  • In this paper we proposed the test design method of reliability growth management. First, we presented the process for establishing the reliability growth management test design considering the number of failures and the termination test time. Reliability growth analysis of continuous system was performed in accordance with the test design process presented. In case the reliability test result is not met with the reliability target value after more than three failures occurred, the required test times were analyzed that 1,725 hrs for one corrective action, 1,950 hrs for two corrective actions. If the number of failures is less than three, design a reliability demonstration test according to confidence level 80% and 90% was performed using RGA 11 Software. As a result, it is possible to establish the reliability growth management test design with sufficient use of available resources. The results of this study can be used when establishing a test design for assessment of reliability growth management of all continuous systems.

Verification for the design limit margin of the power device using the HALT reliability test

  • Chang, YuShin
    • Journal of the Korea Society of Computer and Information
    • /
    • v.23 no.11
    • /
    • pp.67-74
    • /
    • 2018
  • The verification for the design limit margin of the power device for the information communication and surveillance systems using HALT(Highly Accelerated Life Test) reliability test is described. The HALT reliability test performs with a step stress method which change condition until the marginal step in a design and development phase. The HALT test methods are the low temperature(cold) step stress test, the high temperature(hot) step stress test, the thermal shock cyclic stess test, and the high temperature destruct limit(hot DL) step stress test. The power device is checked the operating performance during the test. In this paper, the HALT was performed to find out the design limit margin of the power device.

The Mass Production Weapon System Environmental Stress-Screening Test Design Method based on Cost-effective-Optimization (비용 효과도 최적화 기반 양산 무기체계 환경 부하 선별 시험 설계 방법)

  • Kim, Jangeun
    • Journal of Applied Reliability
    • /
    • v.18 no.3
    • /
    • pp.229-239
    • /
    • 2018
  • Purpose: There is a difficulty in Environmental Stress Screening (ESS) test design for weapon system's electrical/electronic components/products in small and medium-sized enterprises. To overcome this difficulty, I propose an easy ESS test design approach algorithm that is optimized with only one environment tolerance design information parameter (${\Delta}T$). Methods: To propose the mass production weapon system ESS test design for cost-effective optimization, I define an optimum cost-effective mathematical model ESS test algorithm model based on modified MIL-HDBK-344, MIL-HDBK-2164 and DTIC Technical Report 2477. Results: I clearly confirmed and obtained the quantitative data of ESS effectiveness and cost optimization along our ESS test design algorithm through the practical case. I will expect that proposed ESS test method is used for ESS process improvement activity and cost cutting of mass production weapon system manufacturing cost in small and medium-sized enterprises. Conclusion: In order to compare the effectiveness of the proposed algorithm, I compared the effectiveness of the existing ESS test and the proposed algorithm ESS test based on the existing weapon system circuit card assembly for signal processing. As a result of the comparison, it was confirmed that the test time was reduced from 573.0 minutes to 517.2minutes (9.74% less than existing test time).

Contribution of thermal-hydraulic validation tests to the standard design approval of SMART

  • Park, Hyun-Sik;Kwon, Tae-Soon;Moon, Sang-Ki;Cho, Seok;Euh, Dong-Jin;Yi, Sung-Jae
    • Nuclear Engineering and Technology
    • /
    • v.49 no.7
    • /
    • pp.1537-1546
    • /
    • 2017
  • Many thermal-hydraulic tests have been conducted at the Korea Atomic Energy Research Institute for verification of the SMART (System-integrated Modular Advanced ReacTor) design, the standard design approval of which was issued by the Korean regulatory body. In this paper, the contributions of these tests to the standard design approval of SMART are discussed. First, an integral effect test facility named VISTA-ITL (Experimental Verification by Integral Simulation of Transients and Accidents-Integral Test Loop) has been utilized to assess the TASS/SMR-S (Transient and Set-point Simulation/Small and Medium) safety analysis code and confirm its conservatism, to support standard design approval, and to construct a database for the SMART design optimization. In addition, many separate effect tests have been performed. The reactor internal flow test has been conducted using the SCOP (SMART COre flow distribution and Pressure drop test) facility to evaluate the reactor internal flow and pressure distributions. An ECC (Emergency Core Coolant) performance test has been carried out using the SWAT (SMART ECC Water Asymmetric Two-phase choking test) facility to evaluate the safety injection performance and to validate the thermal-hydraulic model used in the safety analysis code. The Freon CHF (Critical Heat Flux) test has been performed using the FTHEL (Freon Thermal Hydraulic Experimental Loop) facility to construct a database from the $5{\times}5$ rod bundle Freon CHF tests and to evaluate the DNBR (Departure from Nucleate Boiling Ratio) model in the safety analysis and core design codes. These test results were used for standard design approval of SMART to verify its design bases, design tools, and analysis methodology.

Static Test and Analysis of Wing Support Structure for External Stores (외부장착물지지 주익구조 정적 시험 및 해석)

  • Uhm, Wonseop;Yoon, Jongmin
    • Journal of Aerospace System Engineering
    • /
    • v.9 no.1
    • /
    • pp.28-34
    • /
    • 2015
  • Armed aircraft of a basic trainer class installs external stores under wing box by using pylon and performs an operation such as weapon delivery and jettison, and should be designed to withstand all kinds of loads applied to external stores. The static strength test of pylons and wing box was performed to assess the static strength of pylon and their support structures for substantiation. Based on the test, the structures were verified to fully satisfy a given design requirement. In this paper, methods of test load generation of wing box and pylon, evaluation of test result data and design result of test set-up were presented. Comparing the FEM analysis with the same test data can lead to good match and reasonable deviation between both. Finally, based on the test and the analysis, the static strength of test article was substantiated and the reliability and effectiveness of analysis math model were obtained.

Design of Whirl Tower Test Facility for Helicopter Rotor System (헬리콥터 로터시스템 회전시험설비의 설계)

  • Kim, Seung-Bum;Song, Keun-Woong;Choi, Hee-Ju;Kim, Eun-Jong;Park, Byung-Kwan
    • Proceedings of the KSME Conference
    • /
    • 2008.11a
    • /
    • pp.1136-1141
    • /
    • 2008
  • The helicopter rotor system generates lift, thrust, maneuvering force and moment to the helicopter with the torque and pitch control force transferred from the main rotor hub/control. And the tail rotor system generates the thrust for yaw axis control of the helicopter with the torque and pitch control force transferred from the tail rotor hub/control. Ground whirl test shall be performed to verify the compliance of requirement performance test and dynamic test of rotor blade and hub/control. This paper describes a design of whirl tower test facility for helicopter rotor system test and evaluation. Design results are summarized and compared with design requirements.

  • PDF

A Study of the Effects on Applying Test Design to Information Communication Authority Module

  • Jang, Jinwook
    • Journal of Advanced Information Technology and Convergence
    • /
    • v.8 no.2
    • /
    • pp.111-118
    • /
    • 2018
  • Information communication authority module software contains various functions and services. A software test is the only acceptance test step. Recently, however, all development steps have become important. In particular, the software acceptance step is very high, and a study of the effective use of limited time and resources on acceptance step is needed. This study examined the efficiency of the Test Design Technique for Software Test. The proposed Test Design process was applied to the domain systems of info-communication and the degree of improvement was measured. This paper establishes Software Test design process Infrastructure based on the developed software.

Effect of complex sample design on Pearson test statistic for homogeneity (복합표본자료에서 동질성검정을 위한 피어슨 검정통계량의 효과)

  • Heo, Sun-Yeong;Chung, Young-Ae
    • Journal of the Korean Data and Information Science Society
    • /
    • v.23 no.4
    • /
    • pp.757-764
    • /
    • 2012
  • This research is for comparison of test statistics for homogeneity when the data is collected based on complex sample design. The survey data based on complex sample design does not satisfy the condition of independency which is required for the standard Pearson multinomial-based chi-squared test. Today, lots of data sets ara collected by complex sample designs, but the tests for categorical data are conducted using the standard Pearson chi-squared test. In this study, we compared the performance of three test statistics for homogeneity between two populations using data from the 2009 customer satisfaction evaluation survey to the service from Gyeongsangnam-do regional offices of education: the standard Pearson test, the unbiasedWald test, and the Pearsontype test with survey-based point estimates. Through empirical analyses, we fist showed that the standard Pearson test inflates the values of test statistics very much and the results are not reliable. Second, in the comparison of Wald test and Pearson-type test, we find that the test results are affected by the number of categories, the mean and standard deviation of the eigenvalues of design matrix.

A Study on Test Working of Signalling System (신호시스템 시운전 시험 연구)

  • 정의진;황종규;이종우
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.157-163
    • /
    • 2000
  • Testing evaluation is a part of process for design, production, evaluation, operation and abolition, and is the process of certifying system performance. The main purpose of testing evaluation is to reduce the risk factor under the determining process. Testing process has the three step such as design qualification, integration and validation test in factory, system integration and commissioning test. Design Qualification is to verify errors on the design process. Integration and validation test in factory is for the H/W and S/W of an equipment and is to verify interface of subsystem, communication protocol and main functions. System integration and commissioning test is a functional test to adjust successful installation of equipment. According to the testing process, briefly consideration for test item, test method and test contents about signalling system is carried out.

  • PDF

A Study of Test and Evaluation Methods for Manpower of System of System (함정 전투성능 신뢰성 보장을 위한 승조원 수 적절성 시험평가 제한점 및 시험평가 제도 개선방안)

  • Byeongjun An;Jeongho Song
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.20 no.1
    • /
    • pp.16-25
    • /
    • 2024
  • By deriving the limitations of the test evaluation, it was intended to suggest a plan to improve the test evaluation system for the appropriateness of the number of ship crews according to the design and construction of troops-saving ships. Currently, the number of crew members by ship type is confirmed and specified in the ROC(Operation Requirement Performance) in the early stages of design, such as conceptual design, but there is a limit to testing and evaluating the appropriateness of ensuring reliability of combat performance.