• Title/Summary/Keyword: Design Project Planning

Search Result 584, Processing Time 0.028 seconds

A Study on the Analysis of Factors for Landscape Architect Scheme Modification for the Restoration Project of Cheonggyecheon (청계천복원사업의 조경설계안 변경 요인 분석)

  • Kim, Yu-Ri;Yang, Byoung-E
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.35 no.5
    • /
    • pp.16-28
    • /
    • 2007
  • In this study, the implications for landscape architecture in the restoration Project of Cheonggyecheon will be shown through the analysis of factors for landscape architect scheme modification. The method of study consists of theoretical study, analysis of the plan and design of landscape architecture of the restoration project of Cheonggyecheon, and deduction of implications thereof. The controversial feints included the many difficulties in realizing the productive design of landscape architecture due to the selective collecting of public opinion and the problems of settling the complications, the design limit of the turnkey and MA systems, the lack of hydraulic knowledge and technology and the shortage of vegetation monitoring data and experimental materials. The alternative proposals are as follows: 1) there should be agreement between the government organization and the civil group, 2) in the turnkey bidding for the river restoration projects, the river restoration design based on the volume divided into some parts should be reconsidered in order to maintain consistency in the total design, 3) in order to maintain consistency in the planning policies, MA designs should also be introduced and applied from the first stage of the project through its completion, and 4) data such as the safe water level in case of flooding for the facilities and the vegetation and data in connection with the ecological restoration of river should be accumulated. If these controversies are not settled effectively, the river restoration project will be delayed due to complications with the citizens and wasted time and effort will result from the frequent design changes. In addition, landscape architecture in this kind of restoration project is bound to decrease in the future due to frequent changes in the hydraulic-centered design.

Environment Design of an Estuary Dike on the Youngsan-River (영산강 하구둑 환경설계)

  • 배현미
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.30 no.1
    • /
    • pp.44-51
    • /
    • 2002
  • The objective of this project is to improve the environment of the estuary dike on the Youngsan-River through Re-landscaping. An estuary dike of the Youngsan-River, the largest in the Orient, was constructed in 1981 and connects Mokpo City and Youngam-Gun province. Twenty years ago, when this dike was completed, this place was one of the famous tourist attractions of Korea. It symbolized the development and growth of Korea. But this dike at present is only a dreary sight as a huge concrete construction element. Therefore, a wall painting on the estuary dike was planned to improve this image. The site, an estuary dike of the Youngsan-River, is located in Mokpo City and its length is about 1,360m. The planning focus of this re-landscaping, which is a proposed improvement design through the analysis of characteristics and problems in conventional facilities, is as follows: (1) Introduction of a wall painting that is a symbol of the sea and river (by the creation of an illusion), (2) Production of the wall painting which is under consideration to create a friendly atmosphere of the circumference view and (3) Preparation of a design to establish an approach to the waterfront. By following these steps, an estuary dike can function as a tourist attractions and can be transformed in to cultural space for civilian. This project is good example of environment design that is completed with the regional residents participation through community input in the planning and initiation of a wall painting. The concept of environment design which involves the residents participation and re-landscaping in Korea has not been established up to now on. However, as this projects has proven, consideration for regional residents is a very important factor for the administrative office and planing specialist to address. In the future, it will have a direct influence on the development of design planning. If the establishment of space that can be accepted by residents with love, affection and self-confidence is possible, environment design in which residents participate actively, can be realized.

Applying Innovative Model and Optimize Business Management for Product Market

  • liao, Shih-chung
    • Journal of Distribution Science
    • /
    • v.11 no.3
    • /
    • pp.13-22
    • /
    • 2013
  • Purpose - Product purpose for optimal values solution for synthesize evaluative criteria and optimize product design values. In addition, product designer has to consider the product design to conform to project, laws and regulations, authentication, from the product design stage. Research design, data, methodology - How to use an evaluative criteria model's imprecise market data by evaluative criteria research design; product mapping relationships between design parameters and customer requirements using product predicted value method. An evaluative criteria model and their associated criteria status, product evaluative criteria model of results. Results - Therefore, after the enterprise product design project analysis, effectiveness and the customer degree of satisfaction must be appraised to obtain the maximum value for the benefit on behalf of the implementation goals, the promotion product level and market competition strength. Conclusions - In multi criterion decision making (MCDM), using its searching software capacity to obtain the optimal solution.

  • PDF

A Method for Schedule Simulation Considering Rework and Uncertainty (재작업과 불확실성을 고려한 일정 시뮬레이션 방법론)

  • Kim, Chan-Mook;Park, Young-Won
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.1
    • /
    • pp.135-143
    • /
    • 2009
  • The majority of development projects fail to meet their target schedule and cost, with the overrun typically between 40 and 200 percent. These overruns happen because the planners underestimate the work or do not consider the need to rework at project planning. Representative schedule planning/management techniques such as Gantt Chart, PERT/CPM etc. that are used in domestic project planning are unable to reflect rework. This paper proposes a method to consider rework to provide more realistic estimates at schedule planning. Additionally, to prevent the underestimation of the work this paper proposes a simulation method that calculates a probabilistic estimated schedule and the associated variance based on the random variable modeling of individual task completion dates.

A Study on Analyzing the Factors Affecting Environmental Loads in the Planning Stage of Korean National Highway Projects

  • Park, Jin-Young;Park, June-Seok;Kim, Myeong-Jin;Kim, Sang-Ryong;Kim, Byung-Soo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.508-512
    • /
    • 2015
  • Carbon emission calculation guidelines provided by the Korean Ministry of Land, Infrastructure and Transportation (MOLIT) and existing environmental load assessment studies have suggested a method for estimating based on the volume determined after the design development. Therefore they are not being helpful in the decision making of the environmental economics of road facilities in the planning stage in which specific information on construction output volume is lacking. Based on literature analysis of existing studies and consultation from a group of construction environmental professionals, 12 types of property information considered to be related to environmental load were selected from an inventory of information that will be available in the road planning stage. In addition, multiple regression analysis was performed based on the environmental load computed through the life cycle assessment (LCA) of 40 national highway project cases of Korea to deduce five impact factors of environmental load in the road facilities planning stage.

  • PDF

Review of Construction Business Intelligence Research

  • Baek, Seungwon;Han, Seung Heon;Yun, Sungmin;Jung, Wooyong
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.371-380
    • /
    • 2020
  • With the 4th industrial revolution, many advanced information technologies are being applied to the area of construction engineering and project management. These applications are usually focusing on design, construction and operation stage and are producing many meaningful fruits. Even though these studies are very important for the development of the construction industry, this study insists that the other stage perspective such as construction business also should be emphasized. Because business phase has significant impacts on the success of a construction project as well as design, construction and operation phase. So, this study reviewed the intelligent-approach papers in planning and marketing, estimation and bid, contract and claim, and project financing fields. This study provides some insights such as values, difficulties, limitations and future directions of business intelligence application.

  • PDF

Implementation of Customized EPM for Collaborative Resource Procurement in Small and Medium Size Plant Construction Enterprises (중소플랜트기업의 협업자원조달을 위한 Customized EPM구현)

  • Nam, Jung-Tai;Kim, Sung-Hun;Han, Young-Geun
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.2
    • /
    • pp.133-141
    • /
    • 2008
  • The need for total enterprise management that covers from accepting orders, design, cost, procurement, manufacture, and delivery has been recently raised in order for efficient project management of small and medium size plant construction enterprises. This trend is reflected in the introduction of EPM(Enterprise Project Management) solutions by some shipbuilding enterprises and large construction corporations. In step with the trend, small and medium size plant construction enterprises are enabled to provide knowledge base in terms of reducing cost and production period and managing portfolio for accepting orders and attaining contract by inducing customized EPM This study presents a design of customized EPM based on a case study of a company. It exhibits a collaborative/collaboration resource-supply model which can be universally applied to small and medium size job-order production enterprises. The research discusses that under the assumption that information is shared internally between departments on planning, supply, manufacture, and quality control in order to create collaborative environment and close participation is created externally between suppliers and orderers, productivity can be improved in cost reduction through planning efficient collaborative supply model.

Evalution Study on The Agri.-cum-Industrial Region Development Projects, Contributed to The Regional Developments in Kyungpook area (경북지역 농촌공업화 단지조성사업이 지역개발에 기여하는 영향평가)

  • 서승덕;천만복;윤학기;윤경식
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.32 no.4
    • /
    • pp.45-52
    • /
    • 1990
  • Government has propelled strongly the Agricultural - cum - Industrial region development project in the nation wide. This project will not only provide employment opportunity for rural inhabitants, but also be designed to activate the rural economy. In addition, it will lead to a balanced development between the urban and rural areas. Under this project, building sites of 3 to 30 hactres will be established in the rural area in order to settle factories which are suitable to the rural condition. In this report, the researches which relating to the achievement conditions of planning, design and constructions of the building sites and the contribution conditions of Agri. - cum - Industrial Region development projects, activated to the rural economy and regional development in the Kyungpook regional areas, were surveyed and studied. On the average evaluation studies the results are as follows : 1. The achievement conditions of the planning, design and construction of the building sites. Very good 27.0 % Good 47.0 % Fair 24.0 % Poor 2.0 % 2. The contribution conditions of the Agri - cum - Industrial factories managements. Very good 17.0 % Good 41.0 % Fair 32.0 % Poor 10.0 %

  • PDF

The Planning and Design of Agricultural Water Resources Development Project using Digital Topographic Data (수치지형정보를 활용한 농업용수개발 사업의 계획 및 설계)

  • 이재기;이현직;최석근
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.13 no.1
    • /
    • pp.49-59
    • /
    • 1995
  • This thesis is purposed to economical and rational accomplishment of the agricultural water resources development project as to utilize digital topographic information in basic investigation, preliminary planning and detail design process of the agricultural water resources development. In this study, the digital topographic data is acquired to stereo aerial photography of test field and the digital elevation model(DEM) is generated by interpolation of acquired data. Also, the database of basic investigation which is constituted to graphic and at-tribute data is designed. As the results of this study, the method that is determined to this study makes a contribution to effective accomplishment of the agricultural water resources development project.

  • PDF