• 제목/요약/키워드: Design Project Planning

검색결과 584건 처리시간 0.029초

Design Procedure for System in Package (SIP) Business

  • Kwon, Heung-Kyu
    • 한국마이크로전자및패키징학회:학술대회논문집
    • /
    • 한국마이크로전자및패키징학회 2003년도 International Symposium
    • /
    • pp.109-119
    • /
    • 2003
  • o In order to start SIP Project .Marketing (& ASIC team) should present biz planning, schedule, device/SIP specs., in SIP TFT prior to request SIP development for package development project. .In order to prevent (PCB) revision, test, burn-in, & quality strategy should be fixed by SIP TFT (PE/Test, QA) prior to request for PKG development. .Target product price/cost, package/ test cost should be delivered and reviewed. o Minimum Information for PCB Design, Package Size, and Cost .(Required) package form factor: size, height, type (BGA, QFP), Pin count/pitch .(Estimated) each die size including scribe lane .(Estimated) pad inform. : count, pitch, configuration(in-line/staggered), (open) size .(Estimated) each device (I/O & Core) power (especially for DRAM embedded SIP) .SIP Block diagram, and net-list using excel sheet format o Why is the initial evaluation important\ulcorner .The higher logic power resulted in spec. over of DRAM Tjmax. This caused business drop longrightarrow Thermal simulation of some SIP product is essential in the beginning stage of SIP business planning (or design) stage. (i.e., DRAM embedded SIP) .When SIP is developed using discrete packages, the I/O driver Capa. of each device may be so high for SIP. Since I/O driver capa. was optimized to discrete package and set board environment, this resulted in severe noise problem in SIP. longrightarrow In this case, the electrical performance of product (including PKG) should have been considered (simulated) in the beginning stage of business planning (or design).

  • PDF

복합단지 설계 업무의 효율성 향상을 위한 개선방안 연구 (Study to Suggest Improvement Method for Increasing Efficiency of Multi-complex Design Work)

  • 구자경;박은수;전영준;이태식
    • 대한토목학회논문집
    • /
    • 제28권4D호
    • /
    • pp.505-512
    • /
    • 2008
  • 단지개발사업은 다양한 구조물이 결합된 사업으로 과거에는 주거, 상업단지 등 단일목적을 갖는 사업위주로 진행되었으나, 최근에는 IT 기술의 발전, 삶의 질 향상 및 생활패턴 변경 등에 따라 U-city를 비롯한 다양한 목적을 갖는 복합단지 형태의 개발이 이뤄지고 있다. 이러한 단지개발과 관련된 인적자원은 각 대학의 도시계획 및 공학, 토목 및 건축공학과에서 이뤄지고 있으며, 도시계획 및 도시공학과에서는 단지개발계획을, 토목 및 건축공학과는 계획을 바탕으로 하는 설계 및 시공과 관련한 교육을 담당하고 있다. 사업의 원활한 진행을 위해 계획 및 설계, 시공은 연속적으로 이뤄져야 하나 현재의 교육과목을 살펴보면 이러한 연속성을 기대하기에는 어려움이 있다. 이에 단지개발 계획수립의 전문가 가 기초적인 엔지니어링 지식을 확보하고 또한 단지개발사업의 설계 및 시공인력은 단지계획 전반을 이해할 수 있도록 기존의 교과목 또는 내용이 개선되어야 할 필요가 있다. 이에 본 연구는 기존 도시계획 및 공학과와 단지개발의 주요 구조물 설계 및 시공과 관련한 토목공학 관련 학과의 교육 내용을 살펴보고, 두 학과의 업무교차가 발생하는 설계단계에 대해 업무를 수행하는 전문인력을 대상으로 업무 중요성을 조사하였다. 이를 통해 단지개발 사업진행 간 설계업무를 이해하고 이와 관련한 설계업무의 효율성을 개선하기 위한 방안을 제시하고자 한다.

실적자료에 의한 농어촌정비사업 사업비 결정에 있어서의 단가모델 구축 (Development of Construction Cost Estimation Model with the Actual Cost Data for Rural Development Project)

  • 배연정;이정재;윤성수
    • 한국농공학회:학술대회논문집
    • /
    • 한국농공학회 1999년도 Proceedings of the 1999 Annual Conference The Korean Society of Agricutural Engineers
    • /
    • pp.359-364
    • /
    • 1999
  • Providing the reasonable construction cost at the initial stage of the rural development project, is a kety factor of the each step of project , such as propriety analysis , cost planning , design, and planning the progress of work. The explainable construction cost can be estimated at the early stage using the actual cost data by statistical analysis. In this study, the influence factors are extracted by factor analysis with the actual cost data of rural development project, object cost model is developed by multiple regression analysis, and verify the developed cost model by Monte-Carlo simulation .

  • PDF

농촌지역개발의 주민참여와 사업성과에 관한 사례 연구 - 미얀마 농촌공동체 개발사업을 중심으로 - (A Case Study on Villagers' Participation and Project Achievement in Rural Development - Focusing on Saemaul Undong Project in Myanmar -)

  • 이승원;심성희
    • 농촌계획
    • /
    • 제26권3호
    • /
    • pp.79-89
    • /
    • 2020
  • Since the Republic of Korea had been registered as the 24th member of OECD DAC in 2009, recent trend of Korea's ODA has showed drastic increase including agriculture and rural development sector. Particularly, various rural development projects have been implemented adopting development experience and methodology of Saemaul Undong (SMU, New Village Movement). This study implemented statistical analysis between villagers' participation and achievement of rural community development project, based on practical data out of 'Saemaul Undong Project in Myanmar', to suggest meaningful implication in terms of participatory rural development. It emphasized the importance and necessity of villagers' participation in rural development through regression analysis that proved positive correlation between villagers' participation and rural development project. It proves that income-generation part has significantly greater influence than capacity-building and living environment part in terms of rural community development project: Based on the analysis, comparing impact of each independent variable, income generation has 1.88 and 1.68 times greater impact than capacity-building and living environment respectively. The result, on the other side, rather raise the importance of careful consideration for project design and implementation to harmonize those three parts altogether especially rural development for developing countries: capacity-building and living environment parts suggests essential foundation to make income generation successful that enables to secure project achievement and sustainability.

지속 가능한 개발 및 생태조경분야의 연구경향과 과제 (Issues and Trends concerning of Ecological Landscape Planning and Design with ESSD)

  • 이명우
    • 한국조경학회지
    • /
    • 제32권1호
    • /
    • pp.139-156
    • /
    • 2004
  • All Papers on Ecological Landscape Degign in KILA from 1973 to 2003 are listed herein for finding research issues and trends. The emerging field of Ecological studies of landscape design is based on Landscape Ecology and Watershed Ecology, the Principles of which can be applied to surveying and evaluation, Planning and design, construction and management focusing preservation of wildlife habitat and niche. This field can be classified into six categories: 1. Sustainable site planning and index, 2. Ecological planning process and regulation, 3. landscape ecology and biotope map, 4. Watershed and eco corridor project, 5. Urban forestry and environment, and 6. artificial ground and restoration ecology. The following is the summary of the findings from Paper review: 1. Sustainable index shall be studied about more specified sites. Water recycling facilities, and reservation wet land need to be studied. 2. Policy and legislation research on Ecological design shall be researched by expanding of the application field. Nature park planning and management fields shall be considered as the main theme of green networking Parts. 3. Landscape Ecological studies should be connected to practical surveying data, e.g. the eco-maps published by Environment Ministry. Traditional culture and science should be joined with the modem science. 4. Eco-corridor planning will go with the scenarios and theories of watershed ecology. 5. Urban forestry shall be studied with the wildlife's behavior and habitat. 6. Restoration engineering techniques should be reconsidered with the wildlife's existence and environmental affiliation.

고층 사무소건축의 공사비계획을 위한 웹 기반 개산견적 프로그램 (Web-Based Cost Planning Program for High-Rise Office Building)

  • 김기홍;박찬식;장선호
    • 한국건설관리학회논문집
    • /
    • 제6권2호
    • /
    • pp.69-79
    • /
    • 2005
  • The Purpose of cost Planning at the early Phase of construction Projects is to provide the clients with the appropriate cost information during the design decision-making process. Therefore, the cost planning process is expected not only to predict projects' cost accurately but also closely to coordinate with the design decision-making activities. This paper proposes a new cost planning method for the effective and efficient directions relating a design decision-making process. Strategies for this method are i ) to utilize elemental cost breakdown system, and ii ) to apply probabilistic distribution theories. Based on these strategic direction, this paper proposed a probabilistic cost planning model for high-rise office building projects. The suggested model provides appropriate cost information to meet clients limited budget and various project' requirements during the design decision-making process. This study is based on probabilistic distribution variables theories and the range estimating technique. This study also develops a web-based software program in order to apply the proposed cost planning model effectively in high-rise of office building construction practices.

파라메트릭 기술을 이용한 토공용 임시 구조물의 3D BIM 모델링 (3D BIM Modeling of Temporary Structure for Earthwork using Parametric Technique)

  • 와카스 아샤드 타놀리;하스나인 라자;이승수;박상일;서종원
    • 한국BIM학회 논문집
    • /
    • 제8권2호
    • /
    • pp.1-9
    • /
    • 2018
  • Nowadays Building Information Modeling (BIM) is a significant source of sharing project information in the construction industry. This method of sharing the information enhances the project understanding among stakeholders. Modeling of information using BIM is becoming an essential part of many construction projects around the globe. Despite rapid adoption of BIM in construction industry still, some sectors of the industry like earthwork have not yet reaped its full benefits. BIM has brought a paradigm shift through identification and integration of the roles and responsibilities of project participants on a single platform. BIM is a 3D model-based process which provides the insight into the efficient project planning and design. The 3D modeling can also be used significantly for the design of temporary structures in an earthwork project. This paper presents the quantity take-off methodology and parametric modeling technique for creating the temporary structures using 3D BIM process. A case study is conducted to implement the proposed temporary structure family design on a real site project. The study presented is beneficial for the earthwork project stakeholders to extract the relevant information using 3D BIM models in a project. It provides an opportunity to calculate the quantity of material required for a project accurately.

Dynamic Modeling of Building Services Projects: A Simulation Model for Real-Life Hospital Project

  • Abhishek, V.;Jagadeesh, P.
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권3호
    • /
    • pp.35-41
    • /
    • 2013
  • All infrastructure projects are said to be inter-dependent, uncertain and labour-intensive in nature. There is no exception for building services sub sector. For a real time project such as 'The construction, extension and refurbishment of Employees' State Insurance Corporation (ESIC) Hospital at Tirupathy, India with total area of 45,000 square feet at an estimated cost of 1100 million rupees, a generic process model is developed to simulate the effect of set of identified variables on construction project. The 'Stocks and Flows' of dynamic model affords relevant insights to project managers, who apply this knowledge when designing better performance through more appropriate project planning. It is concluded from the model-based approach that building services works can be improved through specific better focussed managerial efforts, such as an increasing coordination effectiveness at the planning stage, clarifying prerequisite conditions prior to installations. Otherwise, pending works arising from work clashes can lead to knock-on effects resulting in productivity constraints and pressures, as well as more rework and demolition. Current study reveals that the model enables deep insight into various interdependent processes, their by improving construction performance levels, by addressing the dynamics of design errors and defective works, and recovering delayed schedule.

하천시설물 공사의 기획단계 개략공사비 산정체계 개발 (Development of an Approximate Cost Estimating Framework for River Facility Construction at Planning Stage)

  • 신정민;우성권;이시욱;김옥기
    • 대한토목학회논문집
    • /
    • 제28권3D호
    • /
    • pp.371-381
    • /
    • 2008
  • 국내 하천시설물 건설공사는 도로 등의 다른 토목시설공사에 비해서 사업의 금액규모가 상대적으로 작다는 등의 특성으로 인해 사업의 기획 및 계획단계에서의 개략적인 공사비용을 예측하는 기준 단가가 정립되어 있지 않으며, 시설물의 특성을 고려한 합리적이고 체계적인 견적 방법론 또한 존재하지 않는다는 문제점을 가지고 있다. 본 연구는 하천시설물 건설공사의 실적자료를 수집하고 분석하여, 4단계로 이루어진 하천 제방공사 실적정보 구성 체계를 제시하고, 공사비에 영향을 끼치는 인자들을 주요 공종별로 도출하여, 하천시설물 공사의 기획단계에서 적정한 개략공사비를 산정하는 체계적인 방법론을 제시한다.

IMPLEMENTATION OF PRODUCT DATA MANAGEMENT SYSTEM FOR DESIGN OF BRIDGE STRUCTURES

  • Jin-Suk Kang;Seung-Ho Jung;Yoon-Bum Lee;Kwang-Myong Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1318-1323
    • /
    • 2009
  • In recent years, dramatic advances in information technology have motivated the construction industry to improve its productivity. Computer-based information technology includes Computer-Aided Design (CAD), Computer-Aided Engineering (CAE), Computer-Aided Manufacturing (CAM), Enterprise Resource Planning (ERP), Digital Mock-Up (DMU) and Product Data Management (PDM). Most construction industries are trying to apply these technologies for quality improvement, reduction of construction time and cost. PDM is very useful for managing data and process related to product design and manufacturing. PDM system has various functions such as drawing and engineering document management, product structure and structure modification management, part classification management, workflow management, and project management. In this paper, PDM system was applied to the design of steel-concrete composite girder bridge. To make a practical guidance for PDM implementation to bridge design, the procedure for its implementation was presented. Consequently, this paper could be useful to enhance the efficiency of bridge design.

  • PDF