• Title/Summary/Keyword: Design Project Planning

Search Result 584, Processing Time 0.028 seconds

A Study on the Analysis and Estimation of the Construction Cost by Using Deep learning in the SMART Educational Facilities - Focused on Planning and Design Stage - (딥러닝을 이용한 스마트 교육시설 공사비 분석 및 예측 - 기획·설계단계를 중심으로 -)

  • Jung, Seung-Hyun;Gwon, Oh-Bin;Son, Jae-Ho
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.25 no.6
    • /
    • pp.35-44
    • /
    • 2018
  • The purpose of this study is to predict more accurate construction costs and to support efficient decision making in the planning and design stages of smart education facilities. The higher the error in the projected cost, the more risk a project manager takes. If the manager can predict a more accurate construction cost in the early stages of a project, he/she can secure a decision period and support a more rational decision. During the planning and design stages, there is a limited amount of variables that can be selected for the estimating model. Moreover, since the number of completed smart schools is limited, there is little data. In this study, various artificial intelligence models were used to accurately predict the construction cost in the planning and design phase with limited variables and lack of performance data. A theoretical study on an artificial neural network and deep learning was carried out. As the artificial neural network has frequent problems of overfitting, it is found that there is a problem in practical application. In order to overcome the problem, this study suggests that the improved models of Deep Neural Network and Deep Belief Network are more effective in making accurate predictions. Deep Neural Network (DNN) and Deep Belief Network (DBN) models were constructed for the prediction of construction cost. Average Error Rate and Root Mean Square Error (RMSE) were calculated to compare the error and accuracy of those models. This study proposes a cost prediction model that can be used practically in the planning and design stages.

Suggestion and Verification of Assessment model on Construction-Cost of Steel Bridge in Project Performance Phases

  • Kab-Soo Kyung;Hye-Yeon Park;Sin-Hwa Kang;Eun-Kyoung Jeon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.606-615
    • /
    • 2009
  • Estimating the reasonable construction-cost according to the construction phase in public construction is an important element for securing and executing a national budget efficiently. As a general rule, the predetermined cost of construction is estimated at the end of the design of the target structure. Therefore, it seems to be a considerably difficult problem to estimate the approximate cost of construction, only with its basic information of the bridge in the design planning phase and the early design stage where we can not have specific detailed-section of the target structure. In this paper, we present the calculation of construction-cost in the planning phase based on the analysis of factors affecting the cost of construction conducted in the previous study. Beside, to estimate the cost of construction in early design phase, we would like to present the calculation of construction-cost in the early design phase by executing the analysis of data collected from 61 steel box bridges. It was found from the result of study that the estimated cost of construction gained by the calculation of construction-cost in this paper reduces the error between the real cost of construction and that by the existing method of using.

  • PDF

Assessment of BIM-Based Government Funded Projects at the Design Phase (BIM 적용 공공 프로젝트 설계단계의 평가 방안에 관한 연구)

  • Shin, Seung-Hyup;Ham, Nam-Hyuk;Kim, Jea-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.213-216
    • /
    • 2010
  • Nowadays BIM(Building Information System) is applied to the public construction delivery system. BIM can help communications between project applicants through the extraction of the exact and prompt information. It also increases the efficiency of planning, construction, economic feasibility and maintenance in the whole project. Due to increasing demands of BIM, project evaluation and its process on the final deliverables have been in major interests. Thus, through the analysis of the current BIM project, characteristics, types and applications have been researched. We have discussed completeness, relationship and planning of BIM data, which are the standards of evaluation.

  • PDF

A vision and strategy for developing virtual construction system (가상 건설 시스템 비전과 구축 방향)

  • Choi, Cheol-Ho;Chin, Sang-Yoon;Kim, Jae-Jun;Shin, Hyun-Mock;Lee, Kwang-Myong;Yoon, Su-Won
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.62-67
    • /
    • 2007
  • The research team for the virtual construction development was established with the support of Korea Ministry of Construction and Transportation, and KICTEP (Korea Institute of Construction and Transportation Technology Evaluation and Planning). Its aims are to develop system that is to improve productivity & quality, to create a higher value-added business, and to cultivate international competitiveness in the construction industry. The virtual construction system is a design, engineering, and construction management information system that allows the project participants to effectively share the information throughout the construction life cycle with the support of 3D and design information. To achieve this, the research team focuses on developing several systems. First, the team focuses on developing for the pre-planning, the structural engineering, MEP, and the 3D based estimation system. Second, they focus on developing a simulation system for the construction process planning and feasibility study with help of the virtual reality technologies. Third, they focus on developing the CPLM (Construction Project Life-cycle Management) system for managing construction project data, and the decision support system that makes the collaboration among the project participants based on 3D technologies and information. We also focus on developing the SDAI (Standard Data Access Interface), the localized guideline for 3D design, and a training program. In addition, we focus on developing the undeveloped area of the commercial system and building an environment that can support the communication and collaboration in the construction life-cycle rather than developing the existing and commercialized system.

  • PDF

Design of Architecture for Collaborative Project Management System based on Business Process (프로세스 기반의 협업 프로젝트 관리 시스템 구조 설계)

  • Baek, Jae-Yong;Jung, So-Young;Kim, Bo-Hyun;Yoo, Seock-Kyu;Lee, Seok-Woo;Choi, Hon-Zong
    • Korean Journal of Computational Design and Engineering
    • /
    • v.14 no.5
    • /
    • pp.338-345
    • /
    • 2009
  • c-PMS(collaborative project management system) is a business process(BP) based tool to manage collaborative projects which accomplish common business objectives determined by mutual agreement of companies using limited resources and time. This study analyzes collaborative BP, collaborative projects, and their relation, and proposes the architecture and operation scenario of c-PMS consisted of business process asset management(BPAM) sub-system and project manage(PM) sub-system. BPAM sub-system models private and public BP using a client/server based modeler, defines collaborative BPs process from public BPs, and manages them as companies' asset on a web portal. PM sub-system globally manages collaborative project using planning, execution, monitoring, and analyzing functions.

Teaching-Learning Model of Convergence Project Based on Team Teaching in Engineering Education (공학교육에서의 팀티칭기반 융합프로젝트중심 교수학습모형의 개발)

  • Park, Kyungsun
    • Journal of Engineering Education Research
    • /
    • v.17 no.2
    • /
    • pp.11-24
    • /
    • 2014
  • The purpose of this study is to develop a teaching-learning model of convergence project based on team teaching. Based on development research methodology which explored a university case, the teaching-learning model was developed including three phases such as preparation, planning, and implementation & evaluation. The preparation phase has three steps as follows: to organize team teaching faculty; to develop convergence projects cooperated by industry and university; and to design instructions based on supporting convergence projects. The last step of preparation phase consists of five design activities of: (1) instructions and teaching contents; (2) communication channel among faculty members; (3) feedback system on students' performance; (4) tools to support learners' activity; and (5) evaluation system. The planning phase has two steps to analyze learners and to introduce and modify instruction and themes of convergence projects. The implementation & evaluation phase includes five steps as bellow: (1) to organize project teams and match teams with faculty members; (2) to do team building and assign duties to students of a team; (3) to provide instruction and consulting to teams; (4) to help teams to conduct projects through creative problem solving; and (5) to design mid-term/final presentation and evaluation. Lastly, the research implications and limitations were discussed for future studies.

A Study on the Improvement of SOC Project Planning Process and Systems (국내 SOC 사업의 기획업무 개선에 관한 연구)

  • Shin Dongwoo;Kim Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.45-52
    • /
    • 2000
  • In Korea, demand for the Social Overhead Capital(SOC) projects has tremendously increased since 1970's and is expected to keep growing to support national economic development as well as to enhance the quality of life. In these projects, project planning and feasibility study phase is one of the most critical phases because it determines the success of later phases. However, we have experienced trial and errors repeatedly such as cost overruns and schedule delays in many of the SOC projects. These problems can be prevented or at least expected in the earlier phase and it requires well-developed and standardized project planning process and systems before design, procurement, and construction phases begin. Therefore, the purpose of this research is to investigate current problems in this phase and provide framework for a model for the project planning management which can be used for the SOC projects to insure the whole project success.

  • PDF

The Study on the Characteristic of the Ordinances Related to Community Planning in Seoul Focusing on the Activation of Community Planning (마을만들기 활성화 관점에서 본 서울시 마을만들기 조례 특성에 관한 연구)

  • Shin, Hwa-Kyoung;Jo, In-Sook;Ji, Ye-Jin
    • Journal of the Korean housing association
    • /
    • v.28 no.3
    • /
    • pp.23-33
    • /
    • 2017
  • The purpose of this study is to identify the characteristics of the community design ordinance in Seoul as view of the community design activation and to seek improvement. The findings of this study are as followings; Most of the provisions of the ordinance, such as the concept of community design, the basic plan, and the contents of the project, are defined in a similar manner. From the establishment of the concept of community design, it is necessary to establish the regulations that reflect the actual situation and characteristics of the village. In addition to physical facilities improvement, the ordinance should include support for securing space at the core center, which plays an important role in revitalizing community design. Step-by-step approaches are needed to understand the residents at the beginning of the project, because there is not enough practical support related to resident capacity and community solidarity. As the importance of the competent residents increases, the support elements related to humanware areas should also be expanded. In particular, the supporting process and contents for the support system and program for the training of village leaders and the securing of professional manpower should be well established.

A Systematic Approach Of Construction Management Based On Last Planner System And Its Implementation In The Construction Industry

  • Hussain, SM Abdul Mannan;Sekhar, Dr.T.Seshadri;Fatima, Asra
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.2
    • /
    • pp.11-15
    • /
    • 2015
  • The Last PlannerSystem (LPS) has been implemented on construction projects to increase work flow reliability, a precondition for project performance againstproductivity and progress targets. The LPS encompasses four tiers of planning processes:master scheduling, phase scheduling, lookahead planning, and commitment / weeklywork planning. This research highlights deficiencies in the current implementation of LPS including poor lookahead planning which results in poor linkage between weeklywork plans and the master schedule. This poor linkage undetermines the ability of theweekly work planning process to select for execution tasks that are critical to projectsuccess. As a result, percent plan complete (PPC) becomes a weak indicator of project progress. The purpose of this research is to improve lookahead planning (the bridgebetween weekly work planning and master scheduling), improve PPC, and improve theselection of tasks that are critical to project success by increasing the link betweenShould, Can, Will, and Did (components of the LPS), thereby rendering PPC a betterindicator of project progress. The research employs the case study research method to describe deficiencies inthe current implementation of the LPS and suggest guidelines for a better application ofLPS in general and lookahead planning in particular. It then introduces an analyticalsimulation model to analyze the lookahead planning process. This is done by examining the impact on PPC of increasing two lookahead planning performance metrics: tasksanticipated (TA) and tasks made ready (TMR). Finally, the research investigates theimportance of the lookahead planning functions: identification and removal ofconstraints, task breakdown, and operations design.The research findings confirm the positive impact of improving lookaheadplanning (i.e., TA and TMR) on PPC. It also recognizes the need to perform lookaheadplanning differently for three types of work involving different levels of uncertainty:stable work, medium uncertainty work, and highly emergent work.The research confirms the LPS rules for practice and specifically the need to planin greater detail as time gets closer to performing the work. It highlights the role of LPSas a production system that incorporates deliberate planning (predetermined andoptimized) and situated planning (flexible and adaptive). Finally, the research presents recommendations for production planningimprovements in three areas: process related, (suggesting guidelines for practice),technical, (highlighting issues with current software programs and advocating theinclusion of collaborative planning capability), and organizational improvements(suggesting transitional steps when applying the LPS).

A Study on the Analysis of Project Implementations at Public Design - Improving Project for Public Design in Daegu, Dongseong Street - (공공디자인 개선사업의 추진실태 분석에 관한 연구 - 대구시 동성로 공공디자인 개선사업을 중심으로 -)

  • Lee, Jong-Kuk
    • Journal of the Korean housing association
    • /
    • v.25 no.6
    • /
    • pp.67-74
    • /
    • 2014
  • Dongseong-ro public design was reformed for a short time to be short of connection and riffle effect of another project and to have limitation on long term and integrated development, so that systematic plan from beginning of the project was needed to produce synergy effects. The purpose of the study was to investigate reformation of Dongseong-ro public design and to check on existing development project again and to take actions against future projects in advance and to reexamine and make long term plan from point of view of development of downtown. This study investigated reformation of Dongseong-ro public design of Junggucheong office of Daegu that was done from May 2007 to December 2010. The study consisted of purpose of the project, scope, time, the committee of promotion, questionnaire survey, residents' participation and follow up to suggest reformation based on questionnaire survey. This study had limitation of investigation into internal materials of 'Dongseong-ro public design reformation's master planning service' of Junggucheong office of Daegu. Further studies were needed to investigate empirically.