A Study on the Requirement Information Management Model and Process Linked to Space Planning in the Early Design Stage

  • Jae Ho, Cho;Sang Woo, Kim;Bo Sik, Son;Jae Youl, Chun
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.566-569
    • /
    • 2013
  • The purpose of this research is to develop the technology to meet the requirements of the design content, and to build a 'Requirement Information Management Model' for the design project. The model that should be used in the early design stage will undergo the following process: First, basic requirements would be defined by extracting the design content in the form of a reusable library of space units. At the next stage, requirement information should be modified after considering unique characteristics for the project and conflict problems between function and performance.

  • PDF

An Empirical Study of the Mediating Effect of Governance in Relationship between Resident Participation and Rural Community Design Project Performance - Focused on the Case of Utturu Village - (주민참여와 농촌 마을만들기 사업성과의 관계에서 거버넌스의 매개효과 실증분석 - 제주 웃뜨르권역 사례를 중심으로 -)

  • Kang, Ki-Ho;Lee, Jin-Hee
    • Journal of Korean Society of Rural Planning
    • /
    • v.21 no.1
    • /
    • pp.103-115
    • /
    • 2015
  • As rural development projects, mostly carried out in a top-down development method in the past came to take a bottom-up development method in earnest, entering the 2000s, resident participation became an essential element of a rural community design project, to the extent that it can influence the success or failure of a rural community design project. It is taken for granted that rural residents independently participate in community design projects, but as they are accustomed to various subsidy projects carried out by the government and become increasingly aging, it is not easy to induce their spontaneous participation in farming areas with such problems. Especially, to prevent the distrust between administrative agencies and residents from serving as an obstacle in the residents' spontaneous participation, it is necessary to construct horizontal governance among the village residents, administrative agencies and the group of experts supporting for the project. This study attempted to verify the mediating effect of governance in the relationship between resident participation and the performance of the rural community design project based on this problem recognition, and for this purpose, the results of a survey with residents in Utturu Village, Hangyeong-myeon, Jeju-si, which was completed by carrying out a comprehensive rural development project, the typical bottom-up community design project was used for an empirical analysis. The results of the study can provide implications for setting directions, establishing strategies and constructing governance of rural community design projects in the future, and especially, it can be said that this study has academic significance in that governance is recognized as an important variable related to the project performance.

Action to Improve the Reliability of Production Planning

  • Kim Daeyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.139-144
    • /
    • 2002
  • Management of today's dynamic projects requires a shift of focus from product to process. The purpose of traditional project controls is to conform performance to plan. The purpose of lean project controls is to make the best possible choices at each point in time during the course of the project, as well as contributing knowledge to the parent organizations so they can learn from project experience. The Lean Construction Institute(LCI) proposed the Last Planner System(LPS) capable of accomplishing that purpose, principally through controlling the quality of planning and of management processes themselves, as distinct from concentrating exclusively on project performance. The case project was a pilot project for the implementation of the Last Planner. Consequently, the coordination of the work on this project was extremely successful. The project had its share of challenges. The coordination did not prevent design problems, or supplier errors, but helped the team deal with the problems effectively while maintaining the work flow. The last planner helped the contractors know: a) who will be doing what and where, b) what each one needs from the others, and c) what are the project priorities. The system itself created a more collaborative environment, because it 'demands' that the subcontractors address these issues.

A Basic Study on the Development of Simulation Systems for Supporting the Pre-design Phase of Construction Projects (건축 기획 지원 시뮬레이션 시스템 개발에 관한 기초 연구)

  • Min, Kyung-Min;Ham, Nam-Hyuk;Kim, Joo-Hyung;Kim, Jae-Jun
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.176-181
    • /
    • 2007
  • The widespread of IT technology caused a remarkable change in many industries and the construction industry is also one of them being influenced in the form of CIC(Computer Integrated Construction) and BIM(Building Information Modeling). Construction projects have many participants from various disciplines involved throughout the entire process. Therefore the success of the project greatly depend on the efficiency of decision-making using the information generated from each process stage. Looking from this aspect, the greatest potential value lies in the planning and pre-design stage when considering the construction life cycle. In this paper, we propose a project on developing a 3D object oriented simulation system for supporting the pre design phase. We define the needs for such system through previous case studies and suggest a to be process model. Finally we anticipate the effects that the project will eventually contribute to the construction industry.

  • PDF

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

Data-driven Interactive Planning Methodology for EPC Plant Projects (EPC 플랜트 프로젝트의 초기 공정계획을 위한 통합 데이터 활용 방안)

  • Wang, Hankyeom;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.95-104
    • /
    • 2019
  • EPC plant projects are large and complex, requiring systematic working methodologies, accumulated data, and thorough planning through communications between the entities. In this study, the method of extracting the process planning information using asset data of the plant project and using it to present the initial process plan is presented through the concept of IAP(Interactive Planning). In order to carry out the effective IAP at the early stage of the project, this study extracted the schedule element information from the asset data, created the process plan for each work package, and applied it to the sample project case. Through the proposed IAP methodology, it is possible to promote the utilization of asset data, to identify schedule risks, and to develop countermeasures, which can form the basis for establishing the process management strategy to successfully complete the project.

A Study on the Practices of Landscape Planning & Design Services in Korea (조경계획.설계 기술용역의 수행실태에 관한 조사연구)

  • 권오준;심경구;김유일;고동완
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.21 no.4
    • /
    • pp.113-129
    • /
    • 1994
  • This study is designed to analyze the trends of professional services in Landscape Architecture during the past 5 years(1987-1991) in Korea. The data were collected from 1,117 projects from 56 engineering and landscape architecture firms. The findings are summarized as follows: 1) The projects have been increased annually by 19 percent in numbers and by 47 percent in money terms. 2) The main sources of projects are local governments and corporations. However the private sector comprise 31 percent in projects number and 46 percent in money terms. 3) The public park and tourism site development comprise a half of the projects. Recently recreational forest, golf, amusement and large housing site development have increased very rapidly. 4) In terms of workscope they are devided by 'complex' project which include extensive engineering works and 'simple' project which contain mostly planting design. The former include receational project with average 5 or 6 months contract period, and the later include housing and building site design with 2 or 3 months period. 5) Two types of consulting firms are typical. One is comprehensive engineering firms with urban planning section and few landscape section. The other is specialized professional firms with urban planning or landscape architecture. 50 percent of the project was done by comhensive engineering firms and 60 percent was done by urban planning section. The implication of these findings are broad: Firstly, We have to meet the demands in private secter mostly in recreation and leisure related projects. Secondly, landscape architects and project managers need more professional skills and coordination ability to deal with 'complex' projects. Thirdly, to enhance the quality of professional services it is required to have enough work time and higher service fee through legal and institutional enforcements.

  • PDF

Technical Management Planning Process of Engineering Project (개발 프로젝트의 기술관리 계획 프로세스)

  • Yoo, Il Sang;Park, Young Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.1 no.2
    • /
    • pp.63-68
    • /
    • 2005
  • This study developed the planning process for technical management of engineering project applying systems engineering process in order to correctly design technical management activities early during the system development projects. The developed process describes a systemic design process of a product to be developed as well as the development process and the personnel team of project organization. As an outcome of the process implemented by a Model-Based Systems Engineering(MBSE) software, a systems engineering management plan(SEMP) and a risk management plan can easily be produced.

  • PDF

A Note on the Quantitative Approach to the Study of Community Design - Focused on the Relationship between Project Scale and Outcomes - (마을 만들기 연구의 정량적 접근에 관한 소고 - 마을 만들기 사업규모와 성과의 관계를 중심으로 -)

  • Kim, Dong-Yoon;Kim, Sun-Jick;Kang, Rae-Cheon
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.11 no.2
    • /
    • pp.41-50
    • /
    • 2011
  • Skeptical responses to urban design based on the Physical Planning theory assuming the existence of social agreement and the absolute authorities of planners bring about alternatives such as Participatory Planning and Community Design derived from Harbermas' Communicative Rationality. But the normative contentions do not progress any more to the stage of presenting practical strategies. This is the cause why there should be systematic approaches to reveal the relationships among various concepts or variables. With regard to the Community Design this study intends to take a statistical approach to find relationship between project scale and its accomplishment. The hypothesis that the smaller scale of project begets the better outcomes was tested to be rejected as a result of the analysis of variance. But the result also shows that appropriate density in relatively large area makes residents' expected satisfaction high. Although this discovery has its own meaning the tryout is anticipated to laying the cornerstone of quantitative analyses in the following studies.

A Study on the Application of Scheduling & Planning for Nuclear R &D Projects : Cas of LMR Project (원자력연구개발사업의 공정관리 적용 사례 연구)

  • 한도희
    • Journal of Korea Technology Innovation Society
    • /
    • v.2 no.3
    • /
    • pp.118-128
    • /
    • 1999
  • This study attempts to provide an efficient method for managing the Nuclear R&D projects. It should be noted that the technology and experiences to develop a well-balanced plan and mon-itoring for the R&D project are not yet well established when compared with the commercial con-structionand engineering projects. This study recommends that the R&D project manager utilize the scheduling techniques to establish an integral management system taking in to account the un-certainties in the research environment. Based upon the results of a case study for the Liquid Metal Reactor Design Technology Development Project which is led by the KAERI this study also con-firms that it is possible to run the national nuclear R&D projects with the Scheduling & Planning.

  • PDF