• 제목/요약/키워드: Design Cost Estimation Model

검색결과 173건 처리시간 0.025초

오브젝트-파라미터 통합 오피스 마감공사비 개산견적 모델 (Object-Parameter Integrated Schematic Estimation Model for Predicting Office Building Interior-finishing Costs)

  • 박성호;구교진;박성철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 추계 학술논문 발표대회
    • /
    • pp.159-165
    • /
    • 2008
  • For deciding the profitability and feasibility of the construction project, the schematic estimation has to not only link the design decision-making but also estimate the cost with reliability. The Object-based schematic estimation system was developed for easily linking with design-making and supports to evaluate the design alternatives in the design development stage but didn't consider the cost estimated by object supplementary and parameter work item. This research presents the Integrated Object-Parameter Schematic Estimation Model in the design development stage that can lead to more accurately estimate the cost through analyzing historical data from the high-storied office buildings. For the development of the proposed model for schematic estimation, after analyzing and classifying the work items from the Bills of Quantities(BOQs) and drawings of historical data, this research proposed the methods of estimating cost in accordance with attributes of each work item using regression analysis. In addition, a case study is performed for the effectiveness as comparing the proposed model with the previous estimating model.

  • PDF

도로분야 BIM 라이브러리를 활용한 실적공사비 산정모델 구축 (An Estimation Model of Historical Cost Using BIM Library for Road Project)

  • 문현석;주기범
    • 한국CDE학회논문집
    • /
    • 제20권4호
    • /
    • pp.431-442
    • /
    • 2015
  • Currently, a BIM-based quantity takeoff (QTO) system is mainly focused on architectural projects. To perform this, diverse quantity takeoff methods such as an object-based automatic quantity takeoff, manual quantity and base functions of calculation have widely been utilizing. However, since BIM library for road projects includes structural elements associated with alignment, it is necessary to establish cost estimation system interlocked with historical cost using 3D library by each unit length. Accordingly, the aim of this study is to develop cost estimation model with using a historical cost approach so that it can be utilized in construction planning based on the BIM library for road projects. For this, based on the BIM library for road, the standardized quantity is estimated, and a process for calculating historical cost and a verification model with a 5D simulation was developed by mapping a WBS code with each BIM library object. This can be applied during the approximate cost estimation process in a project planning and an initial design phase for road projects. Besides, it is expected that these results will be utilized in constructing an optimal historical cost estimation process for project libraries.

가치중심의 SI (System Integration) 사업 규모 및 비용산정 모형 구축 연구 (A Value-oriented System Integration Project Sizing and Cost Estimation Model)

  • 김현수
    • Asia pacific journal of information systems
    • /
    • 제8권3호
    • /
    • pp.101-118
    • /
    • 1998
  • The purpose of this study is to construct a value-oriented sizing and cost estimation model for system integration projects. In particular, this study is to build a system architecture design and integration cost model, and a network design and implementation cost model. Unlike software development projects, system integration projects include knowledge-intensive professional services on system architecture and network design areas. Because of these work's high invisibility, the cost of these services is hard to estimate and measure. Therefore, we need to develop value-oriented cost models. This study presents 6 value-oriented cost models, and tests statistical significance of these models with real system integration project data. The results show that cost factors on these models are valid, and models are statistically significant. Future work is needed to integrate various cost models and apply the whole model to field projects to increase model's prediction accuracy.

  • PDF

오브젝트-파라미터기반 건축마감공사비 개산견적 모델 (Object & Parameter based Schematic Estimation Model for Predicting Cost of Building Interior finishings)

  • 구교진;박성호;박성철;송종관
    • 한국건설관리학회논문집
    • /
    • 제9권6호
    • /
    • pp.175-184
    • /
    • 2008
  • 건설 프로젝트의 수익성 및 타당성을 판단하기 위한 기준으로 설계초기단계에 활용되는 개산견적은 설계의사결정 업무와 밀접한 연계성을 가지고 수행되어야 할 뿐만 아니라, 정확하고 신뢰성 있는 견적결과를 도출해야 한다. 설계초기단계에서 설계자의 의사결정 지원과 설계변경에 대한 즉각적인 대처를 위해 프로토타입기반 개산견적 시스템이 개발되었지만, 파라미터에 의해 산정되는 공사항목 및 사용자에 의한 추가공사에 대한 공사비 고려가 미흡하였다. 따라서 본 연구에서는 견적의 정확도를 향상시키기 위해 실제 고층 오피스 빌딩 프로젝트의 실적자료 분석을 통해 기본설계단계에서 오브젝트-파라미터기반 건축마감공사비 산정 모델(Object & Parameter based Schematic Estimation Model, OPSEM)을 개발하였다. 모델 개발을 위해 공사비 내역서, 도면으로부터 얻은 작업항목에 대한 정보를 분석 및 분류하고, 각 작업항목 속성에 맞는 공사비 산정 방식을 제안하였다. 본 연구의 실무 효용성 검증을 위해 유사 사례 프로젝트를 바탕으로 기존의 견적방식과 제시된 모델을 활용한 견적방식의 오차율을 분석하여 정확도 비교를 실시하였다.

LCA 및 LCC를 고려한 환경친화적 리모델링의 평가방법에 관한 연구 (A Study on the Evaluation Method of Green Remodeling Considering LCA and LCC)

  • 이관호;김남규;이언구
    • 한국태양에너지학회 논문집
    • /
    • 제23권1호
    • /
    • pp.57-67
    • /
    • 2003
  • This study aims to presents Evaluation Method of Green Remodeling that analyze the value of environment through expense, using the method of life cycle cost and life cycle assessment simultaneously. The results of this study are summarized as follows. Evaluation Model developed in this study can convert economical value of environment into cost by integrating. In addition, the model can apply as a useful tool to estimation of economical design alternative as well as quantification of environmental loads and costs. Evaluation Model presented In this study observe energy consumption and the environmental load emission with qualification, it can forecast effect of environmental cost that cost estimation is expected to be added to energy cost rate by being possible. Synthetically, when Estimation Model and computer program that developed in this study is applies to the construction industry; reasonable management of environmental load is convenient at each step of Green Remodeling. In addition, at preliminary design phase, practical use may be possible by reasonable yardstick about various alternatives and improvement of design alternatives likewise by grasping environmental effect.

Product Configuration Model 개념 기반의 함정 건조공수 추정 연구 (Construction Cost Estimation on the Initial Design Stage of Naval Ships based on a Product Configuration Model)

  • 오대균;정연환;신종계;최양열
    • 대한조선학회논문집
    • /
    • 제46권3호
    • /
    • pp.351-361
    • /
    • 2009
  • Many manufacturers define the system of a new product flexibility, and take advantage of previous-product information using the product configuration concept. Product configuration is an approach that defines the system of a new product centered on the product structure by referring to the previous-product information. In this paper, it is established how to apply the concept of a product configuration utilizing previous-ships information in construction cost estimation process systematically and effectively. For this, we define the advanced-construction cost estimation process based on a naval ship product model, and design construction cost estimating model. It is validated that this process and model have the applicability through the case study of the construction cost estimating of the mine-warfare ship.

공동주택 지하주차장 확대 리모델링 개략 공사비 산정 모델 개발 (Development of Basic Construction Cost Estimation Model for Expansion of Underground Parking Lot Remodeling in Apartment Housing)

  • 정은빈;구충완;김태완;이찬식
    • 한국건설관리학회논문집
    • /
    • 제22권2호
    • /
    • pp.42-52
    • /
    • 2021
  • 공동주택 주차장 리모델링 공사비는 전체 리모델링 공사비의 대략 20%를 차지한다. 지하주차장 공사비를 알면 전체 공사비 예측이 가능한 것이다. 공사비 산정 시 참고하는 표준품셈은 리모델링 공사비 산정에 적용하기 곤란하여 리모델링 공사의 특징을 반영할 수 있는 공사비 산정 모델이 필요하다. 이 연구에서는 리모델링의 특징 및 설계 요소를 반영하여 개략 공사비를 산정하는 공동주택 지하주차장 확대 리모델링의 개략 공사비 산정 모델을 개발하였다. 선행 연구 고찰 및 전문가 자문을 통해 지하주차장 리모델링 공사의 Activity를 37개 도출하였다. 리모델링 설계도면이 확정되기 전 개략 공사비를 산정할 수 있도록 Activity 별 물량 산출식 및 단가를 제시하였다. 전문가 자문을 통해 공사비 상승에 영향을 미치는 요인 13개와 요인 별 가중치를 결정하였다. 리모델링 사례단지 3개를 개략 공사비 산정 모델에 적용한 결과, 정확도는 평균 93%로 나타났다.

고층건물 수직·수평 요소기반 골조공사 개산견적 모델 (A Schematic Estimation Model for Structure Costs of High-rise Buildings based on Vertical and Horizontal Elements)

  • 남동희;박형진;구교진
    • 한국건설관리학회논문집
    • /
    • 제15권1호
    • /
    • pp.3-10
    • /
    • 2014
  • 고층건물은 공사비 규모가 크고 어느 건설사업보다 공사비 리스크가 높다는 점에서 면밀하고도 철저한 공사비 관리가 필요하다. 공사비 관리는 계획 단계에서부터 세부적인 요소를 설정하고 분석하여 예산을 수립하고 설계 진행 단계별로 공사비의 추적 관리가 필요하며 이를 차기 설계에 반영하는 것이 중요하다. 따라서 본 연구는 설계초기단계 골조공사비 예측시 오차범위를 줄이고, 설계단계별 추적 관리의 기초자료로 활용하기 위하여, 고층건물의 골조공사비를 대상으로 수직 수평 요소(Element)를 기반으로 한 설계초기단계 골조공사비 예측모델을 개발한다. 사례 비교를 통해 본 연구에서 제안한 모델의 유용성을 확인하였다. 예측모델은 설계가 진행됨에 따라 발주자의 요구사항반영, 기타요인에 의한 설계변경 등의 추적 관리가 가능하고, 향후 제시된 기준에 따라 데이터를 축척하고 활용함으로써 골조 물량 및 골조공사비의 대비 오차율을 줄일 수 있을 것으로 기대된다.

단지공사의 공사비 예측모형 개발 - 토공사를 중심으로 - (A Development for Construction Cost Prediction Model of Site Development Project)

  • 이원용;이태식;박종현;배건
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.419-422
    • /
    • 2002
  • 현대 건설산업의 특징은 전문화, 복잡화, 대형화 등으로 다각적으로 변하고 있다. 따라서, 전통적인 공사비 관리체계로는 증가하는 건설공사의 불확실성을 감당할 수 없는 것이 현실이다. 이로 인하여 수많은 공사에서 공사비 증가현상이 발생하면서 건설사업의 성공적인 수행에 영향을 주고 있다. 따라서, 공사비 증가 현상을 방지하고, 효과적인 공사비 관리를 위해서는 정확한 견적을 통하여 관리 목표를 설정하고, 목표를 달성하기 위한 활동들이 필요하다. 본 연구에서는 효율적 공사비 관리를 위하여 기존에 사용된 공사비 모형을 분석하고, 단지조성 공사의 공사비 모형 구축에 필요한 표준 분석체계를 구축하여, 실제 단지조성 공사 사례 분석을 통하여 계획 및 설계단계에서 이용할 수 있는 공사비 모형을 제시하고자 한다.

  • PDF

RC라멘교의 기본설계단계 개략공사비 산정모델 (The Conceptual Cost Estimate Model on Preliminary Design Phase for RC Rahmen Bridge)

  • 김병수;권석현
    • 한국건설관리학회논문집
    • /
    • 제10권2호
    • /
    • pp.111-120
    • /
    • 2009
  • 건설공사에 소요되는 공사비의 개략적인 산정은 건설프로젝트의 계획단계뿐만 아니라 기본설계단계에서 예산을 확정하기 위해서 필수적이다. 현재 국내의 개략공사비 산정모델은 단위길이당 단가 또는 단위면적당의 단가를 이용하여 계산하는 선형적인 단순 모델로써 오차율이 너무 큰 문제점이 있다. 본 연구에서는 과다한 오차율의 문제를 해결하기 위하여 RC라멘교의 특성을 고려하였으며 공사비의 변동특성에 따라 그룹핑(Grouping) 및 대표물량방식 그리고 합성단가를 사용한 모델을 개발하였다. 본 연구의 결과 실제 설계공사비와의 오차를 상당히 줄일 수 있었으며 따라서 발주처나 용역업체에서 RC라멘교의 예산을 산정하는데 기여할 것으로 기대한다.