Park, Hoon;Jang, Seong-Ok;Park, Hyong-Ki;Kim, Nae-Hoi;Suk, Chul-Gi
Explosives and Blasting
/
v.26
no.2
/
pp.52-63
/
2008
Recently the demand of demolition for the unnecessary cylindrical silo structure is increasing due to deterioration and unsatisfactory functional conditions and the issue of demolition is becoming a major highlight. This case study introduced the explosive demolition of the cylindrical silo structure by felling method. The results of explosive demolition conducted on cylindrical silo structure using the felling method show, A silo had collapsed precisely according to estimated direction but in case of B silo there was a minor difference. The lower colunms and ring girder support was designed to the hinge line but in reality the lower colunms of the silo did not do its structural support role and only the ring girder support did its role successfully. As for the impact vibration, most of the measurements were within the estimated range.
In this study, a demolition analysis code using the adaptively shifted integration (ASI)-Gauss technique, which describes structural member fracture by shifting the numerical integration point to an appropriate position and simultaneously releasing the sectional forces in the element, is developed. The code was verified and validated by comparing the predicted results with those of several experiments. A demolition planning tool utilizing the concept of a key element index, which explicitly indicates the contribution of each structural column to the vertical load capacity of the structure, is also develped. Two methods of selecting specific columns to efficiently demolish the whole structure are demonstrated: selecting the columns from the largest index value and from the smallest index value. The demolition results are confirmed numerically by conducting collapse analyses using the ASI-Gauss technique. The numerical results suggest that to achieve a successful demolition, a group of columns with the largest key element index values should be selected when explosives are ignited in a simultaneous blast, whereas those with the smallest should be selected when explosives are ignited in a sequence, with a final blast set on a column with large index value.
Park, Hoon;Nam, Sung-Woo;Noh, You-Song;Suk, Chul-Gi
Explosives and Blasting
/
v.40
no.3
/
pp.54-65
/
2022
Recently, the demand for the dismantling of large-scale industrial structures is increasing, and the construction of restoring the dismantled industrial to their original natural environment is underway. This case was an application of the explosive demolition method to the demolition of a large section turbine foundation structure which structural obsolescence and failure to meet functional requirements. As a result of the explosive demolition, the fracture condition of the turbine foundation was satisfactory, and the explosive demolition was completed without causing any damage to the surrounding facilities.
Korean Journal of Construction Engineering and Management
/
v.14
no.1
/
pp.124-132
/
2013
An influx of the population to the city has soared due to industrialization. As times go by, cities become densely populated so Korean government started to construct a number of buildings including apartment housings. Because they have become functionally, structurally, esthetically deteriorated over the past two decades. some improvements are needed. There are mainly two ways to improve old buildings: remodeling and reconstruction. Between the two, the first one is more popular as it is less time-consuming and more eco-friendly. Demolition work comes first for both of them and it should not give negative effects since it is regarded as a CP(Critical path) in the overall process. For this reason, a thorough construction management must be done. The reality, however, demolition is managed by the construction manager's experiences and decisions. If the key factor of demolition which is the planning of manpower and machine equipment, is determined by unscientific and subjective judgments, its period and risk also will increase. In particular, eco-friendly demolition can be more risky because it's been rarely conducted. Therefore, scientific and objective ways of demolition management are needed. In this context, this paper aims at analyzing productivity in each process of demolition focusing on manpower and machinery equipment which are the main parts of demolition assuming that the demands of eco-friendly remodeling demolition projects will be increasing. At the same time, by estimating working period through the output, this paper would be helpful to set up the plans for overall project in earlier stage.
Domestic explosive demolition techniques have been developed and applied for low-rise structures up to now. However, the demand for the development of those techniques that can be applied economically, safely and environment-friendly rapidly increases because the old high-rise RC rahmen structures that were built since around 1970s are now required to rebuild. As a result, element technologies of explosive demolition for low-rise structures were applied to take advantage of technology in high-rise structures that performed application testing at Chungang Department demolition field in Daejeon city. It could judge elements technology establishment for high-rise structure demolition and field application and suggest the improvements when the problems occurred to develop High-rise building demolition techniques for method of protection a field test and the dust reduction test. The water cannon test was applied to reduce the dust site and the drilling tests are performed to select the best components for explosives demolition elements techniques of the reliability. This paper shows that we have the ability to remove a high-rise building using environmentally friendly safe and economical explosives demolition method. It would contribute to prevent a foreign company from entering the domestic market and should contribute to acquire competitiveness of domestic demolition industry.
Kim, Hyo Jin;Kang, Leen Seok;Lee, Dong Wook;Kim, Chang Hak
KSCE Journal of Civil and Environmental Engineering Research
/
v.34
no.3
/
pp.1007-1015
/
2014
The importance of construction waste reusing and recycling is becoming increasingly large because the demolition industry is in current trend to pursue for sustainable growth. As the considering situation of the domestic housing construction and existing house, a scale of demolition industry is expected to be increased continuously. But the related cost regulations that are used in tendering in the demolition industry are insufficient, also the computer system for estimating the demolition costs have not been developed yet. Therefore, in this study suggests man-hours of 21EA items which are utilized to estimate demolition cost and work rate of $1.0m^3$ breaker which is used mostly in domestic demolition industry after analyzing a case study for deconstruction works. The computer system is developed for the estimating demolition cost easily, which are including five modules such as a project information, a unit cost management, a standard unit cost table, a bill of quantity, and a reporting system. This computer system is possible to apply for estimating cost of both mechanical demolition and blasting demolition. The biggest advantage of this system is to estimate cost to utilize standard WBS which is linked with standard unit table and each DB. This can help unskilled users use easily for it.
The blast demolition technology has been used to demolish various industrial facilities and tall buildings since 1950s in the advanced countries such as USA and U.K. It is now considered as one of safe demolition methods in the above countries. In Korea, several companies have tried to introduce blast demolition technology in the early days of the 1990s. However, this technology is still at the beginning stage and not fully adopted due to situation of avoiding technology transfer by overseas technical tie-up companies, lack of objects to be demolished and low level recognition on blast demolition. This technology shall be considered as a cutting edge technology to be applicable to demolition of skyscrapers, various industrial structures and factory buildings in the near future. Blast demolition of a pier structure was carried out under the site condition where there were already the constructed 2 pier structures of up and down line which had safety problems in an expressway construction project. The pier structures need to be demolished and reconstructed for a short period of time in consideration of the construction work process to be followed.
KSCE Journal of Civil and Environmental Engineering Research
/
v.26
no.4D
/
pp.627-634
/
2006
Now, in a domestic country, the rebuilding and redevelopment of existing houses has been rapidly increasing with an economic growth and the improvement of living condition. As a result of that, a lot of C&D waste has been also produced. Nevertheless, it is not easy to find the research results for appropriate treatment and management of C&D waste in domestic. Therefore this study suggests the optimum deconstruction management system for minimizing construction waste and increasing reuse or recycle rate of material different from traditional demolition. The system makes it possible to plan and manage in advance quantity of C&D waste, demolition methods of each structural elements and application methods of produced C&D waste through an integrated and computerized system. The purpose of the system is ultimately to contribute to minimizing environmental damages and reducing construction waste quantity of a country. This system is largely composed of four modules such as planning of preliminary demolition survey, estimating of demolition quantity, planning of demolition schedule and planning of construction waste management and each module can be also used individually according to the purpose of a user.
Kim, Kyeongjin;Cho, Hwangki;Sohn, Dongwoo;Koo, Jaehyun;Lee, Jaeha
Journal of the Computational Structural Engineering Institute of Korea
/
v.31
no.5
/
pp.251-258
/
2018
In construction site, conventional methods such as jackhammer or explosive methods(dynamite) have been often used for the demolition of structures. Use of those methods are more carefully treated in environmentally and historically sensitive area. For those reasons, use of Soundless Chemical Demolition Agent(SCDA) is getting the spotlight. The SCDA is a powder which has expansive strength when it is mixed with water. In these Characteristics, SCDA can destroy the concrete or rock as it is poured into boreholes of the concrete or rock structures. However, there is no industrial standard for the use of SCDA effectively yet. In this study, experimental study to measure the expansive pressure was conducted depending on various boundary conditions such as waterproof, length of the steel pipe, submerged of steel pipe. Furthermore, computational analysis using damage plasticity model to predict the minimum required pressure of the SCDA for the concrete demolition depending on spacing between holes(k-factor) and compressive strength of the concrete was conducted. Obtained results indicates that water heat dissipation with submerged steel pipe shows the stable pressure for measuring the SCDA and hole distance(k-factor) is the most important factor for crack initiation of concrete.
Geun-Ho Kim ;Dooseong Hwang;Jung Ho Song;Junhyuck Im;Junhee Lee ;Minyoung Kang ;Kwang Pyo Kim
Nuclear Engineering and Technology
/
v.55
no.6
/
pp.1959-1965
/
2023
The objective of this study was the establishment of clearance method that can ensure radiological safety and reasonably minimize radioactive waste when demolishing contaminated buildings at KRR-1&2. By reviewing Korean and international laws related to decommissioning, the method for clearance of contaminated buildings presented in this study is to first decontaminate the building and then conduct a radiological safety assessment, such as measuring residual radioactivity, to determine whether the radiation dose criteria for clearance are satisfied. The measurement results meet the radiation dose criteria, the contaminated buildings are regarded as clearance and can be converted into the general buildings. The demolition of the cleared buildings is carried out using conventional demolition methods. The waste generated during the demolition is classified as general construction waste and is disposed of according to relevant laws. The proposed method significantly optimized the number of samples analyzed and reduced the time and cost associated with the decommissioning. The established method will be applied to the ongoing decommissioning of contaminated buildings at KRR-1&2, and its application will be verified by regulatory bodies. The study suggests that this method could be used for the decommissioning of contaminated buildings at other Korean nuclear facilities in the future.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.