Abstract
Recently the demand of demolition for the unnecessary cylindrical silo structure is increasing due to deterioration and unsatisfactory functional conditions and the issue of demolition is becoming a major highlight. This case study introduced the explosive demolition of the cylindrical silo structure by felling method. The results of explosive demolition conducted on cylindrical silo structure using the felling method show, A silo had collapsed precisely according to estimated direction but in case of B silo there was a minor difference. The lower colunms and ring girder support was designed to the hinge line but in reality the lower colunms of the silo did not do its structural support role and only the ring girder support did its role successfully. As for the impact vibration, most of the measurements were within the estimated range.
최근 노후화와 기능적 요건을 만족하지 못하여 불용되는 원통형 사일로의 해체 수요가 증가되면서 원통형 사일로의 해체에 대한 관심이 부각되고 있다. 본 연구에서는 전도공법에 의한 원통형 사일로의 발파해체를 수행하였다. 발파해체 결과, A 원통형 사일로는 예측된 방향으로 정확히 전도되었으며, B 원통형 사일로의 실제 전도방향은 예측방향과 약간의 차이를 보였다. 이것은 하단부 기둥과 링거더 지지부가 힌지 라인으로 설계되었으나, 실제 거동에서는 링거더 지지부만이 힌지 라인의 역할을 하였기 때문이다. 충격진동의 경우에는 예측 범위 이하로 측정되었다.