• Title/Summary/Keyword: Demand scheduling

Search Result 238, Processing Time 0.026 seconds

A Study on Economic Demand Response NBT and Performance (우리나라 전력시장에서 경제성 DR의 NBT 및 낙찰 관계 분석)

  • Yang, Min Seung;Lee, Sung Moo
    • Current Photovoltaic Research
    • /
    • v.5 no.3
    • /
    • pp.100-104
    • /
    • 2017
  • This paper analyzes the correlation between Net Benefit Test (NBT) and System marginal price (SMP), which has a significant impact on the allocation of demand response (DR) resources in resource scheduling and commitment (RSC) process, based on the performance data of the demand resource market which has been established in 2014. Demand resources compete with generation resources in the RSC process, and it is prescribed to use demand resources only when net benefit occurs. Analysis result shows that the larger the SMP than the Net Benefit Threshold Price (NBTP), the more the winning bid of demand response resource was. It is interpreted that the introduction of NBT in DR market is justified. The demand resource market has been steadily growing. It is required to expand the scope of resources up to the small-sized DR, and to expand the functionalities of demand resources not only in the current energy market but also in the reserve market in the future. In order for that, institutional improvements are required.

Scheduling Algorithm for WDM-PON in SUCCESS Network Architecture (SUCCESS 네트워크 구조에서의 WDM-PON을 위한 스케줄링 알고리즘)

  • Kim, Hyun-Sook
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.30 no.7B
    • /
    • pp.427-432
    • /
    • 2005
  • Emerging high broad band multimedia service with high quality has led to demand for challenge of optical access network and Passive Optical Network is one of the most important technologies for future optical access network. In this paper, we study the scheduling algorithm for WDM-PON in SUCCESS network architecture, a next generation hybrid WDM/TDM optical access network architecture. Due to economic implementation of this architecture, the shared resources efficiently need to be assigned and then we propose the efficient scheduling algorithm based on specific architecture and characters of SUCCESS. We evaluate and analyze the performance in terms of the average packet delay and throughput of the whole system.

A Study on the Process Design of Advanced Planning & Scheduling for Transformer Operation Improvement (변합기 공정 개선을 위한 APS(Advanced Planning & Scheduling) 프로세스 설계에 관한 연구)

  • Hwang, Duk-Hyuong;Nam, Seung-Don;Cho, Young-Wook;Oh, Sun-Il;La, Seoung-Hun;Kang, Kyong-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.2
    • /
    • pp.159-166
    • /
    • 2012
  • As enterprises, based on the forecast of the customer's demand and collaboration with the suppliers, establish the integrated system directing supply, production, and distribution for the increase of productivity, Thus, this study intends to find the most urgent and critical factors for the improvement of the information system by externalizing factors affecting the operation of information system, suggest the process to improve the relevant functions of information system, and design the process. As a result of the analysis of the previous studies on the improvement of the information system, many studies were conducted on the improvement of ERP and SCM, yet there was no study conducted targeting about APS (Advanced Planning & Scheduling). Thus, this study chose APS as the subject for the design of the process for the improvement for the information system.

Transient Coordinator: a Collision Resolution Algorithm for Asynchronous MAC Protocols in Wireless Sensor Networks

  • Lee, Sang Hoon;Park, Byung Joon;Choi, Lynn
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.6 no.12
    • /
    • pp.3152-3165
    • /
    • 2012
  • Wireless sensor networks (WSN) often employ asynchronous MAC scheduling, which allows each sensor node to wake up independently without synchronizing with its neighbor nodes. However, this asynchronous scheduling may not deal with collisions due to hidden terminals effectively. Although most of the existing asynchronous protocols exploit a random back-off technique to resolve collisions, the random back-off cannot secure a receiver from potentially repetitive collisions and may lead to a substantial increase in the packet latency. In this paper, we propose a new collision resolution algorithm called Transient Coordinator (TC) for asynchronous WSN MAC protocols. TC resolves a collision on demand by ordering senders' transmissions when a receiver detects a collision. To coordinate the transmission sequence both the receiver and the collided senders perform handshaking to collect the information and to derive a collision-free transmission sequence, which enables each sender to exclusively access the channel. According to the simulation results, our scheme can improve the average per-node throughput by up to 19.4% while it also reduces unnecessary energy consumption due to repetitive collisions by as much as 91.1% compared to the conventional asynchronous MAC protocols. This demonstrates that TC is more efficient in terms of performance, resource utilization, and energy compared to the random back-off scheme in dealing with collisions for asynchronous WSN MAC scheduling.

Schedule Optimization in Resource Leveling through Open BIM Based Computer Simulations

  • Kim, Hyun-Joo
    • Journal of KIBIM
    • /
    • v.9 no.2
    • /
    • pp.1-10
    • /
    • 2019
  • In this research, schedule optimization is defined as balancing the number of workers while keeping the demand and needs of the project resources, creating the perfect schedule for each activity. Therefore, when one optimizes a schedule, multiple potentials of schedule changes are assessed to get an instant view of changes that avoid any over and under staffing while maximizing productivity levels for the available labor cost. Optimizing the number of workers in the scheduling process is not a simple task since it usually involves many different factors to be considered such as the development of quantity take-offs, cost estimating, scheduling, direct/indirect costs, and borrowing costs in cash flow while each factor affecting the others simultaneously. That is why the optimization process usually requires complex computational simulations/modeling. This research attempts to find an optimal selection of daily maximum workers in a project while considering the impacts of other factors at the same time through OPEN BIM based multiple computer simulations in resource leveling. This paper integrates several different processes such as quantity take-offs, cost estimating, and scheduling processes through computer aided simulations and prediction in generating/comparing different outcomes of each process. To achieve interoperability among different simulation processes, this research utilized data exchanges supported by building SMART-IFC effort in automating the data extraction and retrieval. Numerous computer simulations were run, which included necessary aspects of construction scheduling, to produce sufficient alternatives for a given project.

The Way of Production Planning Using the Inventory Control Method, Responding the Demand Fluctuation (불안정한 주문 패턴의 수요에 대응하는 재고 관리 기법을 응용한 생산계획 수립 방법)

  • Bae, Byeong-Gan;Cho, Joong-Hyun;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.3
    • /
    • pp.119-125
    • /
    • 2007
  • As competition in manufacturing enterprise is contested, the scope of safely production planning, manufacturing enterprise should ensure, has been reduced. The more upstream of SCM, the more reduction of scope of production planning. As a result, order fluctuation is more sharply contested. Through improving the logistics network, it is best way that the end user's demand information is conveyed to upstream of SCM, but it is difficult in fact. In this paper, it mention the way of robustic adjustment, in the suppliers' point of view, the end user's demand information is dammed up, as they postpone responding the customer's order as a possible. And it will show the result of appling the way, as a case study.

A Study of Demand Response Resource in Ancillary Service (계통보조서비스에서 부하자원의 활용방안에 대한 고찰)

  • Kim S.C.;Yoo S.Y.;Kim H.J.;Kim H.J.;Park J.B.;Sin J.R.
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.663-665
    • /
    • 2004
  • There are some demand response program which is Direct Load Control and so on in Korea. These are used to manage lack of power stability or shift peak time for shading load. It is very important not only using stability power system but controling and scheduling power system on the whole. Interruptible loads are essential resources to solve lack of energy and limit of constructing generator On recently days, Demand Response Program's reliability is recognized as ancillary or reserve service in many country. This paper presents a necessity to apply demand resource to our ancillary program. For this reason, it is introduce overseas ancillary program using load resource.

  • PDF

Estimation of Reasonable Price of Battery Energy Storage System for Electricity Customers Demand Management (전력소비자 수요관리용 전지전력저장시스템의 적정 가격 산정)

  • Kim, Seul-Ki;Cho, Kyeong-Hee;Kim, Jong-Yul;Kim, Eung-Sang
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.10
    • /
    • pp.1390-1396
    • /
    • 2013
  • The paper estimated the reasonable market price of lead-acid battery energy storage system (BESS) intended for demand management of electricity customers. As time-of-use (TOU) tariffs have extended to a larger number of customers and gaps in the peak and off-peak rates have gradually risen, deployment of BESS has been highly needed. However, immature engineering techniques, lack of field experiences and high initial investment cost have been barriers to opening up ESS markets. This paper assessed electricity cost that BESS operation could save for customers and, based on the possible cost savings, estimated reasonable prices at which BESSs could become a more prospective option for demand management of customers. Battery scheduling was optimized to maximize the electricity cost savings that BESS would possibly achieve under TOU tariffs conditions. Basic economic factors such as payback period and return on investment were calculated to determine reasonable market prices. Actual load data of 12 industrial customers were used for case studies.

Optimal scheduling of multiproduct batch processes with various due date (다양한 납기일 형태에 따른 다제품 생산용 회분식 공정의 최적 생산계획)

  • 류준형
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1997.10a
    • /
    • pp.844-847
    • /
    • 1997
  • In this paper, scheduling problem is dealt for the minimization of due date penalty for the customer order. Multiproduct batch processes have been dealt with for their suitability for high value added low volume products. Their scheduling problems take minimization of process operation for objective function, which is not enough to meet the customer satisfaction and the process efficiency simultaneously because of increasing requirement of fast adaptation for rapid changing market condition. So new target function has been suggested by other researches to meet two goals. Penalty function minimization is one of them. To present more precisely production scheduling, we develop new scheduling model with penalty function of earliness and tardiness We can find many real cases that penalty parameters are divergent by the difference between the completion time of operation and due date. That is to say, the penalty parameter values for the product change by the customer demand condition. If the order charges different value for due date, we can solve it with the due date period. The period means the time scope where penalty parameter value is 0. If we make use of the due date period, the optimal sequence of our model is not always same with that of fixed due date point. And if every product have due date period, due date of them are overlapped which needs optimization for the maximum profit and minimum penalty. Due date period extension can be enlarged to makespan minimization if every product has the same abundant due date period and same penalty parameter. We solve this new scheduling model by simulated annealing method. We also develop the program, which can calculate the optimal sequence and display the Gantt chart showing the unit progress and time allocation only with processing data.

  • PDF

Air-traffic dispatching scheduling in terminal airspace (공항접근영역 항공교통 Dispatching 스케줄링 연구)

  • Jeong, Sun-Jo;Cho, Doo-Hyun;Choi, Han-Lim
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.44 no.11
    • /
    • pp.973-980
    • /
    • 2016
  • An air traffic management (ATM) has been studied in a variety of fields to utilize an air traffic capacity efficiently and solve a congested air traffic situation due to an increment of an air traffic demand. In this paper, an air traffic management, which is related with controlling and determining the sequencing of an aircraft approaching to an airport, in terminal control area is studied. This paper focuses on scheduling algorithms with a given problem for the air traffic management with operational constraints, such as a space separation, an overtaking on the same air-route, and a route merge point (a scheduling point). For a real-time calculation, the presented algorithms focus on dispatching heuristic rules which are able to assign tasks in a fast time period with an adequate performance, which can be demonstrated as a proper and realistic scheduling algorithm. A simulation result is presented to illustrate the validity and applicability of the proposed algorithm. Each scheduling rule is analyzed on the same static and dynamic air traffic flow scenario with the ATM Monte-Carlo simulation.