This paper illustrates the practical design procedure on a position control of an electrical fin actuator for the guided missile using Time Delay Control(TDC) and Enhanced Time Delay Observer(ETDO). Since TDC is robust to the model uncertainties such as the parameter variation and the external disturbance, it has been frequently used in nonlinear control systems. For a position control of an electrical fin actuator in the missile system, TDC requires the velocity sensor as well as the position sensor. To resolve the problems of the cost, the space and the malfunction due to the velocity sensor, ETDO is used as the velocity observer. ETDO is enhanced version of TDO that has the problems of the reconstruction errors and the restriction on selecting its gains. To maximize the control performance, the parameters of ETDO are optimized by using the genetic algorithm. The effectiveness of this approach is proved through a series of simulation studies and experiments, and the designed controller is compared with the typical TDC and TDC using the reduced oder observer.
Journal of Construction Engineering and Project Management
/
제4권3호
/
pp.33-46
/
2014
Delay is the most common problem in the construction industry. It has many negative effects on project's success in terms of time, cost, quality, and safety. From the literature review, a total of thirty-five factors of delay were selected. These factors were divided into seven groups related to materials, manpower, owner, consultant, contractor, construction, and external problems. This study was carried out to identify the main causes of delay for a construction project through their importance level. The importance level was determined based on the frequency of occurrence and severity of impact. The structured questionnaire has distributed to the respondents who have much experience in construction management in Bangladesh. The results of analysis indicated that top five factors of construction delay according to their level of importance are: (1) price of construction materials increased very rapidly, (2) political situation (revolution/ public strikes), (3) shortages of skilled workers, (4) poor site management and supervision by contractor, (5) incompetent/ immature subcontractors. These findings of this study are expected to be significant contributions to Bangladesh construction industry in controlling current performance of project on time overrun.
Castellanos-Lopez, S. Lirio;Cruz-Perez, Felipe A.;Rivero-Angeles, Mario E.;Hernandez-Valdez, Genaro
Journal of Communications and Networks
/
제16권2호
/
pp.130-139
/
2014
Due to the unpredictable nature of channel availability, carrying delay-sensitive traffic in cognitive radio networks (CRNs) is very challenging. Spectrum leasing of radio resources has been proposed in the so called coordinated CRNs to improve the quality of service (QoS) experienced by secondary users (SUs). In this paper, the performance of coordinated CRNs under fixed-rate with hard-delay-constraints traffic is analyzed. For the adequate and fair performance comparison, call admission control strategies with fractional channel reservation to prioritize ongoing secondary calls over new ones are considered. Maximum Erlang capacity is obtained by optimizing the number of reserved channels. Numerical results reveal that system performance strongly depends on the value of the mean secondary service time relative to the mean primary service time. Additionally, numerical results show that, in CRNs without spectrum leasing, there exists a critical utilization factor of the primary resources from which it is not longer possible to guarantee the required QoS of SUs and, therefore, services with hard delay constraints cannot be even supported in CRNs. Thus, spectrum leasing can be essential for CRN operators to provide the QoS demanded by fixed-rate applications with hard delay constraints. Finally, the cost per capacity Erlang as function of both the utilization factor of the primary resources and the maximum allowed number of simultaneously rented channels is evaluated.
공기지연과 관련하여 발생하는 간접비(Markup)에 구성된 잠재적 기회이익부분이 계약금액의 조정에서 제한된 계약제도, 배상요건으로서의 법익침해 해석문제, 또는 회계의 비용으로서 인식되지 않음으로 인해 배상되지 않고 있다. 국내외적으로 회계기준은 발생주의, 법익의 개념상 손해배상의 범위를 주로 제한배상주의에 기하여 채택하고 있어 불법행위에 의한 후속적 특수손해인 기회이익의 직접상실손해는 채무로서 인정되지 않아 배상되어지지 않기 때문이다. 따라서 일방의 계약위반으로 공기가 지연된다면, 그로 인한 계약당사자간의 직${\cdot}$간접적인 후속 손해가 발생하게 되므로 그 손해의 크기를 정량화하고 법규정의 배상적용타당성 검증과 배상체계에 관한 합리적 적용방안을 마련할 필요가 있다.
In this paper in order to prevent break of operation of equipments resulted from the delay of parts supply, the continuous review(Q, r) inventory model with probabilistic lead time is developed. If the lead tire is random varivable, the cycle also is stochastic. Then it is not easy to obtain the total cost equation of this inventory model. Therefore it is assumed that one cycle is the interval of reorder points. When the lead time is assumed to have exponential probability distribution, the lot-size and reorder point which minimize total cost are obtained. And as the lead time increases, the order quantity and the total cost are greater, but the reorder point increases by a certain point of time and then decreases.
KSII Transactions on Internet and Information Systems (TIIS)
/
제14권7호
/
pp.3057-3075
/
2020
End-to-end network delay plays an vital role in distributed services. This delay is used to measure QoS (Quality-of-Service). It would be beneficial to know all node-pair delay information, but unfortunately it is not feasible in practice because the use of active probing will cause a quadratic growth in overhead. Alternatively, using the measured network delay to estimate the unknown network delay is an economical method. In this paper, we adopt the state-of-the-art matrix completion technology to better estimate the network delay from limited measurements. Although the number of measurements required for an exact matrix completion is theoretically bounded, it is practically less helpful. Therefore, we propose an online adaptive sampling algorithm to measure network delay in which statistical leverage scores are used to select potential matrix elements. The basic principle behind is to sample the elements with larger leverage scores to keep the traits of important rows or columns in the matrix. The amount of samples is adaptively decided by a proposed stopping condition. Simulation results based on real delay matrix show that compared with the traditional sampling algorithm, our proposed sampling algorithm can provide better performance (smaller estimation error and less convergence pressure) at a lower cost (fewer samples and shorter processing time).
Construction projects are facing delay problems. Delays in construction have been immense effect on performance or satisfactory delivery of the project. Delays have been causing project cost overrun as well as it is a source of dispute hence damaging the relationship between the project participants. The purpose of this study was to explore the causes of delay risk through a field survey study. Data were collected from construction professionals working in owner, consultant and contractor organizations. All together 208 questionnaire instruments were used and analyzed by employing statistical tools (SPSS computer program). 19 delay factors were identified by this study, out of which following factors were critical: Frequent interruptions from public (local people, pressure group etc.), changed site condition, failure to provide required construction site, unrealistic project time estimation and design errors.
KSII Transactions on Internet and Information Systems (TIIS)
/
제3권2호
/
pp.209-218
/
2009
In a wireless sensor network(WSN) each sensor node deals with numerous sensing data elements. For the sake of energy efficiency and network lifetime, sensing data must be handled effectively. A technique used for this is data aggregation. Sending/receiving data involves numerous steps such as MAC layer control packet handshakes and route path setup, and these steps consume energy. Because these steps are involved in all data communication, the total cost increases are related to the counts of data sent/received. Therefore, many studies have proposed sending combined data, which is known as data aggregation. Very effective methods to aggregate sensing data have been suggested, but there is no means of deciding how long the sensor node should wait for aggregation. This is a very important issue, because the wait time affects the total communication cost and data reliability. There are two types of data aggregation; the data counting method and the time waiting method. However, each has weaknesses in terms of the delay. A hybrid method can be adopted to alleviate these problems. But, it cannot provide an optimal point of aggregation. In this paper, we suggest a stochastic-based data aggregation scheme, which provides the cost(in terms of communication and delay) optimal aggregation point. We present numerical analysis and results.
International Journal of Control, Automation, and Systems
/
제6권2호
/
pp.186-193
/
2008
The Internet's low cost and ubiquity present an attractive option for real-time distributed control of processes on the factory floor. When integrated with the Internet, the LonWorks open control network can give ubiquitous accessibility with the distributed control nature of information on the factory floor. One of the most important points in real-time distributed control of processes is timely response. There are many processes on the factory floor that require timely response. However, the uncertain time delay inherent in the network makes it difficult to guarantee timely response in many cases. Especially, the transmission characteristics of the LonWorks/IP network show a highly stochastic nature. Therefore, the time delay problem has to be resolved to achieve high performance and quality of the real-time distributed control of the process in the LonWorks/IP Virtual Device Network (VDN). It should be properly predicted and compensated. In this paper, a new distributed control scheme that can compensate for the effects of the time delay in the network is proposed. It is based on the PID controller augmented with the Smith predictor and disturbance observer. Designing methods for output feedback filter and disturbance observer are also proposed. Tracking position control experiment of a geared DC Servo motor is performed using the proposed control method. The performance of the proposed controller is compared with that of the Internal Model Controller (IMC) with the Smith predictor. The result shows that the performance is improved and guaranteed by augmenting a PID controller with both the Smith predictor and disturbance observer under the stochastic time delay in the LonWorks/IP VDN.
The aim of the paper is to solve the problem of customer reduction due to the difficulty of parts sourcing which impacts production delay and delivery delay in SC networks. Furthermore, this paper is to suggest the new inventory policy of MTS in order to solve the problem of current inventory policy. In order to compare two policies, a LCD maker is selected as a case study and the real data for 2007 years is used for simulation input. The maker uses MTO policy for parts sourcing which has the problem of lead time even if it has some advantage of inventory cost. Based on current process. The simulation program of AS-IS model and TO-BE model using ARENA 10 version is developed for evaluation. In a result, the order number of two policies shows that MTO is 52 and MTS is 53. However the quantity of order shows big difference such that MTO is 168,460 and MTS is 225,106. Particularly, the lead time of new inventory policy shows much shorter that that of MTO such that MTO 100 is days and MTS is 16 days. In spite of short lead time by MTS policy, new policy has to take burden of inventory cost per year. Total inventory cost per year by MTS policy is US$ 11,254 and each part inventory cost is that POL is US$ 1,807, LDI is US$ 2,166 and Panel is US$ 7,281. The implication of the research is that the company has to consider the cost and the service simultaneously in deciding the inventory policy. In the paper, even if the optimal point of deciding is put into tactical area, the ground of decision is suggested in order to improve the problem in SC networks.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.