• Title/Summary/Keyword: Delay Time Cost

Search Result 435, Processing Time 0.032 seconds

Sensitivity Analysis of JLSP Inventory Model with Ordering Cost inclusive of a Freight Cost under Trade Credit in a Two-stage Supply Chain

  • Shinn, Seong-Whan
    • International Journal of Advanced Culture Technology
    • /
    • v.8 no.3
    • /
    • pp.300-306
    • /
    • 2020
  • This study analyzes the distributor's inventory model in a two-stage supply chain consisting of the supplier, the distributor and the end customer. The supplier will allow a credit period before the distributor settles the account with him in order to stimulate the demand for the product he produces. It is also assumed that the distributor pays the shipping cost for the order and hence, the distributor's ordering cost consists of a fixed ordering cost and the shipping cost that depend on the order quantity. The availability of the delay in payments from the supplier enables discount of the distributor's selling price from a wider range of the price option in anticipation of increased customer's demand. As a result, the availability of a credit transaction leads to an increase in inventory levels. On the other hand, in the case of deteriorating products in which the utility of the product perish over time, the deterioration rate with time plays a role in reducing inventory levels. In this regard, we analyze the effect of the length of the credit period and the degree of product deterioration on the distributor's inventory level. For the analysis, we formulate the distributor's annual net profit and analyze the effect of the length of credit period and deterioration rate of the product on inventory policy numerically.

Electricity Cost Minimization for Delay-tolerant Basestation Powered by Heterogeneous Energy Source

  • Deng, Qingyong;Li, Xueming;Li, Zhetao;Liu, Anfeng;Choi, Young-june
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.11 no.12
    • /
    • pp.5712-5728
    • /
    • 2017
  • Recently, there are many studies, that considering green wireless cellular networks, have taken the energy consumption of the base station (BS) into consideration. In this work, we first introduce an energy consumption model of multi-mode sharing BS powered by multiple energy sources including renewable energy, local storage and power grid. Then communication load requests of the BS are transformed to energy demand queues, and battery energy level and worst-case delay constraints are considered into the virtual queue to ensure the network QoS when our objective is to minimize the long term electricity cost of BSs. Lyapunov optimization method is applied to work out the optimization objective without knowing the future information of the communication load, real-time electricity market price and renewable energy availability. Finally, linear programming is used, and the corresponding energy efficient scheduling policy is obtained. The performance analysis of our proposed online algorithm based on real-world traces demonstrates that it can greatly reduce one day's electricity cost of individual BS.

Optimal Switching Frequency in Limited-Cycle with Multiple Periods

  • Sun, Jing;Yamamoto, Hisashi;Matsui, Masayuki;Kong, Xianda
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.1
    • /
    • pp.48-53
    • /
    • 2012
  • Due to the customer needs of reducing cost and delivery date shorting, prompt change in the production plan became more important. In the multi period system (For instance, production line.) where target processing time exists, production, idle and delay risks occur repeatedly for multiple periods. In such situations, delay of one process may influence the delivery date of an entire process. In this paper, we discuss the minimum expected cost of the case mentioned above, where the risk depends on the previous situation and occurs repeatedly for multiple periods. This paper considers the optimal switching frequency to minimize the total expected cost of the production process. In this paper, first, the optimal switching frequency model is proposed. Next, the mathematic formulation of the total expectation is presented. Finally, the policy of optimal switching frequency is investigated by numerical experiments.

Optimal Design of Bridge Substructure Considering Uncertainty (불확실성을 고려한 교량 하부구조 최적설계)

  • Pack, Jang-Ho;Shin, Young-Seok;Shin, Wook-Bum;Lee, Jae-Woo
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.387-390
    • /
    • 2008
  • The importance of the life cycle cost analysis for construction projects of bridge has been recognized over the last decades. Accordingly, theoretical models, guidelines, and supporting softwares have been developed for the life cycle cost analysis of bridges. However, it is difficult to predict life cycle cost considering uncertainties precisely. This paper presents methodology for optimal design of substructure for a steel box bridge. Total life cycle cost for the service life is calculated as sum of initial cost, damage cost considering uncertainty, maintenance cost, repair and rehabilitation cost. The optimization method is applied to design of a bridge substructure with minimal cost, in which the objective function is set to life cycle cost and constraints are formulated on the basis of Korean Bridge Design Specification. Initial cost is calculated based on standard costs of the Korea Construction Price Index and damage cost on the damage probabilities to consider the uncertainty of load and resistance. An advanced first-order second moment method is used as a practical tool for reliability analysis using damage probability. Maintenance cost and cycle is determined by a stochastic method and user cost includes traffic operation costs and time delay costs.

  • PDF

The Algorithm of Improvement of Production cost using Function based cost estimating (기능 분석에 따른 제품 원가 구조개선 알고리즘에 대한 연구)

  • Seo, Ji-Han;Lee, Jea-Myung;La, Seung-Hoon
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.4
    • /
    • pp.207-213
    • /
    • 2010
  • Now days, the marketing environment is rapidly changed. Therefore, a lot of companies try to reduce production cost. Especially, Design is a important activities in new product development. While the concepts of design for manufacturable and concurrent engineering have made significant advances in integrating the design function with other areas in the firm. There are still major gaps in timely and accurate costing information available to designers. Inappropriate design could result in high redesign cost and delay in product relation. The generation of design and improvement is a time-consuming and mentally exhaustion process. It involves combining design features to generate as many potential design as possible. As not all features combinations are feasible, decision-makers have to narrow down the potential solutions and subsequently select appropriate design for further development. This new study is composed of 3 steps aiming at the Low Cost Design of the product. The three steps are consisted that setting up the target Cost, estimating the current functional cost, the design of a unit's reviewing according to the priority of the difference between the target cost and the functional cost.

An optimal discrete-time feedforward compensator for real-time hybrid simulation

  • Hayati, Saeid;Song, Wei
    • Smart Structures and Systems
    • /
    • v.20 no.4
    • /
    • pp.483-498
    • /
    • 2017
  • Real-Time Hybrid Simulation (RTHS) is a powerful and cost-effective dynamic experimental technique. To implement a stable and accurate RTHS, time delay present in the experiment loop needs to be compensated. This delay is mostly introduced by servo-hydraulic actuator dynamics and can be reduced by applying appropriate compensators. Existing compensators have demonstrated effective performance in achieving good tracking performance. Most of them have been focused on their application in cases where the structure under investigation is subjected to inputs with relatively low frequency bandwidth such as earthquake excitations. To advance RTHS as an attractive technique for other engineering applications with broader excitation frequency, a discrete-time feedforward compensator is developed herein via various optimization techniques to enhance the performance of RTHS. The proposed compensator is unique as a discrete-time, model-based feedforward compensator. The feedforward control is chosen because it can substantially improve the reference tracking performance and speed when the plant dynamics is well-understood and modeled. The discrete-time formulation enables the use of inherently stable digital filters for compensator development, and avoids the error induced by continuous-time to discrete-time conversion during the compensator implementation in digital computer. This paper discusses the technical challenges in designing a discrete-time compensator, and proposes several optimal solutions to resolve these challenges. The effectiveness of compensators obtained via these optimal solutions is demonstrated through both numerical and experimental studies. Then, the proposed compensators have been successfully applied to RTHS tests. By comparing these results to results obtained using several existing feedforward compensators, the proposed compensator demonstrates superior performance in both time delay and Root-Mean-Square (RMS) error.

User Costs Evaluation due to the Bridge Reconstruction Period (교량의 재가설 공사기간에 따른 사용자비용 평가)

  • Kim, Sang Hyo;Park, Se Jun;Lee, Dong Ho;Ahn, Jin Hee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.1
    • /
    • pp.148-158
    • /
    • 2011
  • As critical infrastructure, bridges play an indispensable role in facilitating the distribution of goods. When bridges reach their end of useful life or get damaged by natural disasters such as earthquakes or storms, they have to be removed and reconstructed. When bridges in service need to be reconstructed, user costs occur from vehicle detours and traffic congestions, and social costs occur from noise and dust during construction periods. However, these user and social costs are not considered during reconstruction and the evaluation methods of those costs are vague. Thus, there is lack of appropriate bridge types that consider these costs. Therefore, this paper identifies the social overhead costs that occur during bridge reconstruction, which is also called, users' socioeconomic values. Next, it proposes a method to evaluate user costs during bridge reconstruction, and appraises the method. User costs are evaluated based on traffic information, social and material volumes including the bridge's daily traffic volume, peak hours, detour distance and time. In addition, time delay costs due to traffic operational costs and bridge reconstruction are also taken into consideration.

A Study on the Variation of Air Pollutants Emission Rates for Different Traffic Signal System in Metropolitan Area (대도시 교통신호시스템에 따른 대기오염물질 배출량 변화에 관한 연구)

  • 홍민선;우완기;최종인
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.9 no.1
    • /
    • pp.93-100
    • /
    • 1993
  • This study was carried out to investigate the relationship between the traffic signal systmes and the air pollutants emitted by the motor vehicles at Kangnam Intersection. One of the most important measures of effectiveness (MOE) in traffic studies is the delay to vehicles in the system. Delay represents indirect costs to the motorist in terms of time loss and a direct cost in terms of fuel consumption during idling. The results of TRANSYT-7F modeling was correlated among delay, fuel consumption and total travel tiem. Air pollutants emission rate can be calculated by the results of modeling and the Korean type emission factor. As expected the highest emissions, for air pollutants, are observed during the morning rush hours (07 : 00-10 : 00). For better results of modeling, the TRANSYT-7F model needs to modify for the Korean type of traffic model. The results of this study indicate that the variation of air pollutants emission rates were closely related to the traffic signal system.

  • PDF

Active Compliance Control for the Rehabilitation Robot with Cable Driven Transmission (케이블 구동 메커니즘을 이용한 재활 로봇의 능동 컴플라이언스 제어)

  • Kang, Sang-Hoon;Chang, Pyung-Hun;Park, Hyung-Soon
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.28 no.12
    • /
    • pp.1823-1832
    • /
    • 2004
  • In this paper, we proposed a TDC based F/T sensorless active compliance control algorithm for a rehabilitation robot (KARES II). The preference of compliance of the disabled is presented by clinical testing at Korea National Rehabilitation Center with the disabled. The KARES II was designed to work 12 predefined tasks which are very essential for helping the disabled. Among the tasks, some contact tasks between the robot and the disabled exist. Therefore, TDC based F/T sensorless compliance control algorithm is developed for these tasks without additional cost. We verified the proposed algorithm with experiment. Also for the practical use, suitable compliance for contact tasks is chosen by clinical testing at Korea National Rehabilitation Center.

Factors Affecting Timely Completion of Construction Projects in Nepal

  • Acharya NirmalKumar;Lee Young-Dai;Kim Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.254-257
    • /
    • 2003
  • It is common to experience delays during construction projects. Delays can ca use substantial damages to an owner as well as contractors and is the sources of frequent disputes and claims. Many studies have been carried out to assess the causes of delays in construction projects. They are found to be almost similar, except some prevailed local condition. Most of the common construction delay factors are attributed to design faults, incompetent contractor, lack of team accountability etc. To minimize or eliminate the delay we have to follow the recognized fundamental principles of management such as: cost-time relationship, time priority, accountability, rewards, innovative thinking etc. The root causes of delays found out in this paper are not so much different than other previous study. If the implementing agencies properly followed the, fundamental management principles and some other related corrections as recommended in the paper, much construction delays can be avoided.

  • PDF