전기식 도어시스템의 고장건수 및 지연시간을 활용한 열차운행장애 분석 (Analysis of Train Operation Obstacle Using Number of Failures and Delay Time of Electric Door System)

  • 이본형;김두현;김성철
    • 한국안전학회지
    • /
    • 제35권1호
    • /
    • pp.12-17
    • /
    • 2020
  • This paper analyzes functions of component parts of D-Urban Railway's door system along with operation obstacle risks on frequency(the number of occurrences/year) and severity(delay time/the number of occurrences). Based on this, the paper presents improvements and current system's problems after obstacle risks of EMU and door system are appled. The obstacle of door system causes corrosion of main parts such as DCU due to heat problem of operation environment, problems of maintenance methods and deterioration. DCUs on PCBs with more than 50% pattern corrosion cause problems. Even though the number of door system's obstacle occurrences for the last 5 years is 42, along with 104 minutes of operation obstacle, EMU operation obstacle risk is low(Level 1), which indicates there is limit in matrix of railway risks presented by the standard of railway safety management system. Therefore, it is necessary to have railway risk matrix suitable for the field. Finally, the paper deducts the obstacle risks through frequency and severity. Since 2017 when the risks of EMU and door system's obstacle, that of EMU has been 24(47% reduced) and that of door system has been average 9.5 per year(23% reduced).

Impact Analysis of Construction Delay: The Case of Defects In the Top-down Construction Method

  • Suk, Janghwan;Kwon, Woobin;Soe, Jang-woo;Cho, Hunhee
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.213-221
    • /
    • 2022
  • Defects are the risk factors in the construction process of buildings. They cause damage, delaying the construction duration. They especially cause adverse effects on the top-down construction method. This study analyzed the degree of construction delay induced by each work type, focusing on defects in the top-down method. Then, we derived construction delay induction coefficient from different work types in order by using the severity of construction delay per defect and the occurrence probability of defect; this assessment model measures the impact of defects on construction delay for each work type. Furthermore, by comparing each work type based on the defect frequency and the construction delay induction coefficient, we found work types that need to be administered attentively. We identified that plastering work was easy to overlook, requiring caution in defect management. This study provides an efficient defect management system suitable for the buildings that are built using the top-down construction method.

  • PDF

Development of a methodology for analysing and quantifying the impact of delay factors affecting construction projects

  • Shebob, Abdulhamid;Dawood, Nashwan;Shah, Raj K.
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권3호
    • /
    • pp.17-29
    • /
    • 2012
  • Delays are one of the biggest problems facing by the construction industry and they have significant financial and social impact in construction projects. The paper presents a framework of Delay Analysis System (DAS) with the aim of analysing the impact of delay factors in Libyan construction projects. The system has designed by integrating the possible delay factors, critical activities of a project using@risk simulator. A case study of building project was demonstrated to identify the impact of delays and the sensitivity of delay factor. The case study result showed that the project might be delayed by 97 to 103 days in comparison to the planned duration. The developed DAS is a tool for analysing and identify the impacts of delay factors and assist to construction manager to take necessary measure in reducing the delay impact. The paper provides a methodology for analysing the possible delay impact in a construction project and informing to construction manager in advance of the possible delay factors.

인터넷 쇼핑 중 구매결정 연기가 쇼핑감정과 쇼핑몰 만족도에 미치는 영향 (The Effects of Decision Making Delay on Experienced Emotion for Internet Shopping and Internet Shopping Mall Satisfaction)

  • 김한나
    • Asia Marketing Journal
    • /
    • 제10권1호
    • /
    • pp.133-160
    • /
    • 2008
  • 본 연구는 소비자들이 다양한 이유로 인해 인터넷 구매결정을 연기하는 쇼핑행동을 경험적 관점에서 바라보고 이를 통해 감정적 요인들이 쇼핑몰 만족도에 미치는 영향력을 살펴보고자 하였다. 본 연구모델의 실증분석을 위해 설문조사를 실시한 결과, 성과적 위험지각, 재정적 위험지각, 사회적 위험지각에 의한 구매결정 연기는 부정적 감정을 경험하게 하며, 특히 성과적 위험지각의 경우 긍정적 감정에 부적 영향을 미치는 것으로 나타났다. 하지만 사회적 위험지각과 절차 불확실성에 의한 구매결정 연기는 쇼핑 중 긍정적 감정에 영향을 미치고, 필요 불확실성에 의한 구매결정 연기는 부정적 감정을 감소시켜 쾌락적 쇼핑성향과 관련된 구매결정 연기는 긍정적 감정을 경험하게 하는 것으로 나타났다. 또한 인터넷 쇼핑감정에서 경험된 긍정적 감정은 쇼핑몰 만족도에 정적 영향을 미치고 부정적 감정은 부적 영향을 미침을 알 수 있었다.

  • PDF

대전도시철도의 열차 지연운행 분석연구 (Analysis of Train Delay in Daejeon Metro)

  • 권영석;이진선
    • 한국콘텐츠학회논문지
    • /
    • 제17권1호
    • /
    • pp.50-57
    • /
    • 2017
  • 본 논문은 대전도시철도 개통 이후 내부자료 통계분석을 통해 열차지연 원인과 문제점을 살펴보고 고위험군의 위험도를 평가하여 위험도 지수 심각도와 위험도를 측정하였다. 측정방법으로는 위험도 관리방법인 risk matrix($5{\times}5$)를 적용하여 위험도 등급을 산정하였으며, 결과에 따른 안전수준과 허용수준 범위를 분석하였다. 그 결과 차량분야가 가장 위험도가 심각하고, 다음으로 기계설비분야가 위험도를 내재하고 있는 것으로 나타났다. 특히 차량의 출입문장치결함으로 인한 출입문고장과 열차신호 및 제어장치는 심각도도 높지만, 빈도수가 매우 잦아 추가적인 사고 잠재성을 보이고 있다. 기계설비 분야의 PSD결함도 PSD의 안전문 개폐불량이 가장 위험한 것으로 나타났으며, PSD의 오취급 및 PSD의 유리파손 등도 위험도를 내포하고 있는 것으로 나타났다. 본 연구는 이러한 위험도를 내재하고 있는 사고의 빈도수를 경감하고, 심각도를 낮춰서 위험도를 예방할 수 있는 방안을 예측하여 미리 선제적으로 대비할 수 있는 분석결과를 제시함으로써 안전한 도시철도운영으로 이용자의 교통편익에 기여할 것으로 기대된다.

Investigating delay factors in construction industry: A Korean perspective

  • Acharya, Nirmal Kumar;Im, Hae-Man;Lee, Young-Dai
    • 한국건설관리학회논문집
    • /
    • 제7권5호
    • /
    • pp.177-190
    • /
    • 2006
  • Construction projects are facing delay problems. Delays in construction have been immense effect on performance or satisfactory delivery of the project. Delays have been causing project cost overrun as well as it is a source of dispute hence damaging the relationship between the project participants. The purpose of this study was to explore the causes of delay risk through a field survey study. Data were collected from construction professionals working in owner, consultant and contractor organizations. All together 208 questionnaire instruments were used and analyzed by employing statistical tools (SPSS computer program). 19 delay factors were identified by this study, out of which following factors were critical: Frequent interruptions from public (local people, pressure group etc.), changed site condition, failure to provide required construction site, unrealistic project time estimation and design errors.

공기지연요소분석을 이용한 회귀분석 기반 초고층 내부공사의 생산성 예측 (Regression Technique-based Productivity Estimation conducting Construction Delay Factor Analysis on Interior Works in High-rise Building Construction)

  • 김현미;김태형;신영근;김영석;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.191-192
    • /
    • 2011
  • The construction projects contain a lot of variables and risk affecting productivity. The duration of the project must be recognized important as for quality, unit cost and safety. There is need for improving work efficiency by investigating relationship of works to prevent delay. This study focuses on analysing the delay factors of steel staircase system to suggest regression model that enables construction productivity estimation. The position of the observers and construction delay factors were expressed by the independent variable of the regression model and productivity was expressed by a dependent variable. This paper suggests quantitative productivity and it is expected that will be helpful estimating application in construction new technologies.

  • PDF

Predictable Risk Factors for Adjacent Segment Degeneration After Lumbar Fusion

  • Hyun, Seung-Jae;Kim, Young-Baeg;Hong, Hyun-Jong;Kwon, Jeong-Taik;Suk, Jong-Sik;Min, Byung-Kook
    • Journal of Korean Neurosurgical Society
    • /
    • 제41권2호
    • /
    • pp.88-94
    • /
    • 2007
  • Objective : The aim of this study is to investigate predictable risk factors for radiologic degeneration of adjacent segment after lumbar fusion and preoperative radiologic features of patients who underwent additional surgery with adjacent segment degeneration. Methods : Between January 1995 and December 2002, 201 patients who underwent lumbar fusion for degenerative conditions of lumbar spine were evaluated. We studied radiologic features, the method of operation, the length of fusion, age, sex, osteoporosis, and body mass index. Special attention was focused on, preoperative radiologic features of patients who required additional surgery were studied to detect risk factors for clinical deterioration. Results : Follow-up period ranged from 3 to 11 years. In our study, 61 [30%] patients developed adjacent segment degeneration, and 15 [7%] patients required additional surgery for neurologic deterioration. Age, the postoperative delay, facet volume, motion range, laminar inclination, facet tropism, and preexisting disc degeneration of adjacent segment considered as possible risk factors. Among these, laminar inclination and preexisting disc degeneration of adjacent segment were significantly correlated with clinical deterioration. Conclusion : The radiologic degeneration of adjacent segment after lumbar fusion can be predicted in terms of each preoperative radiologic factor, age and the postoperative delay. Laminar inclination and preexisting disc degeneration of adjacent segment have shown as strong risk factors for neurologic deterioration. Thus, careful consideration is warranted when these risk factors are present.

A BLOG BASED RISK MANAGEMENT SYSTEM USING SOFT SCHEDULE

  • Soo-Myeong Jin;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1334-1339
    • /
    • 2009
  • To achieve the best performance of a project, uncertainties involved in the building construction process need to be identified in the planning phase of the project. Uncertainties seldom create a positive impact on construction project, but they almost cause delay and increase costs. Therefore, risk management plays a significant role in construction to minimize risk occurred due to uncertainties of a project. Although the importance of the risk management has been known to the construction industry, it is not enough to be developed to meet the demands of the industry. It has not been enough for Systems to control schedule risks for managers in the field. Therefore, a tool is necessary to efficiently control risks. The propose of this study is to invent Schedule Risk Control System Module to prepare for risks in preconstruction phase.

  • PDF

IT 서비스 프로젝트 계약서 위험 요인 평가 체크리스트 (A Checklist for Assessment of Risks Involved in IT Service Project Contract)

  • 정은주;정승렬
    • 인터넷정보학회논문지
    • /
    • 제15권4호
    • /
    • pp.57-65
    • /
    • 2014
  • 최근 한국의 대규모 IT 서비스 프로젝트의 수익률은 저하되고 있는 것으로 파악된다. IT 서비스 프로젝트의 수익률을 저하시키는 가장 큰 이유는 프로젝트와 관련된 여러 위험 요인들이 프로젝트의 일정 지연 및 비용 초과를 초래한 것으로 파악 된다. 이러한 일정 지연 및 비용 초과 현상을 방지하기 위해서는 프로젝트의 위험 요인들을 계약 체결 전에 식별하는 것이 매우 중요하다. 왜냐하면 발주사와 개발사간 계약 조건 협상 시 식별된 위험 요인들을 제거할 수 있기 때문이다. 본 연구에서는 IT 서비스 프로젝트의 특성으로 인해 프로젝트 수행 과정에서 발생할 수 있는 계약 위험 요인들을 사전에 파악하고 평가할 수 있는 체크리스트를 제시하고, 이를 실제 금융 산업의 IT 서비스 프로젝트에 적용하여 그 효과를 확인하고자 하였다. 적용 사례를 분석한 결과 IT 서비스 프로젝트의 위험 요인들을 식별하고 제거하는데 본 연구에서 제시된 체크리스트가 효과가 있음을 확인하였다.