Journal of Institute of Control, Robotics and Systems
/
v.4
no.6
/
pp.802-810
/
1998
The purpose of this study is to find the analytic solution of determining the optimal capacity of processes and storages to meet the product demand. Recent trend to reduce product delivery time and to provide high quality product to customer requires the increasing capacity of storage facilities. However, the cost of constructing and operating storage facilities is becoming substantial because of increasing land value, environmental and safety concern. Therefore, reasonable decision making about the capacity of processes and storages is important subject for industries. The industrial solution for this subject is to use the classical economic lot sizing method, EOQ(Economic Order Quantity) model, trimmed with practical experience but the unrealistic assumption of EOQ model is not suitable for the chemical plant design with highly interlinked processes and storages. This study, a first systematic attempt for this subject, clearly overcomes the limitation of classical lot sizing method. The superstructure of the plant consists of the network of serially and/or parallelly interlinked processes and storages. A novel production and inventory analysis method, PSW(Periodic Square Wave) model, is applied. The objective function of optimization is minimizing the total cost composed of setup and inventory holding cost. The advantage of PSW model comes from the fact that the model provide a set of simple analytic solution in spite of realistic description of material flow between process and storage. The resulting simple analytic solution can greatly enhance the proper and quick investment decision for the preliminary plant design confronting diverse economic situation.
This research empirically explores the relationship between types of performance information use, decision making behaviors and performance of government organizations. We measured two types of using performance information, relevance of performance index, variety of performance information, and levels of manager intervention by surveying performance managers of each government ministry or agency and also measured performance by using performance reports. The results of fuzzy-set qualitative comparative analysis suggest that hard use and soft use have impact on performance by combining with characteristics of performance information and managers decision-making by intervening performance management processes.
This paper's aim is to suggest the Expert System for analyzing relative combat power in ground operations. Since relative combat power analysis in terms of comparing combat power of friendly forces with one of the enemy can determine how the commander and staffs operate their unit afterwards, it requires fast and rational decision-making process. However, it has relied on manual method so far though Tactical Information Communications Network(TICN) into which numbers of applications can be loaded has been developed over a decade. 3 methods for analyzing relative combat power were expressed as mathematic rules to be used knowledge in the expert system after reviewing previous studies, and it studied how intangible power as well as tangible were reflected on total combat power. The expert system that will be built using EXSYS Corvid tool is expected to lessen error rate, provide faster decision-making, and reflect both intangible combat power and tangible one by using an appropriate weights in analyzing relative combat power. Next research filed includes how to build expert systems related with military personnel and intelligence areas for fast and rational decision-making processes.
Objectives: Balancing benefits and risks through the drug life cycle has been discussed for many decades. The objective of this study was to review the processes and tools currently proposed for benefit-risk assessment of medicinal drugs. It aimed to establish scientific and efficient drug safety management system based on the synthetic analysis of benefit-risk evidence. Methods: We conducted a review of exiting literatures published by regulatory agencies or initiatives. Not only quantitative methodologies but also qualitative method were compared to understand their key characteristics for the benefit and risk assessment of drugs. Results: Recently, benefit-risk assessments have more structured approaches to decision making as part of regulatory science. Regulatory agencies such as European Medicines Agency, FDA have prepared plans to apply benefit-risk assessment to regulatory decision making. Also many initiatives such as IMI (Innovative Medicine Initiative) have conducted research and published reports about benefit-risk assessment. For benefit-risk assessment, four kinds of methods are necessary. Frameworks such as BRAT (Benefit Risk Action Team) framework, PrOACT-URL provide guidance for the whole process of decision-making. Metrics are measurements of risk benefit. The estimation techniques are methods to synthesis and combine evidences from various sources. The utility survey techniques are necessary to explicit preferences of various outcome from stakeholders. Conclusion: There is the lack of widely accepted, validated model for benefit-risk assessment. Nor there is an agreement among academia, industry, and government on methods for the quantitative valuation. It is also limited by available evidence and underlying assumptions. Nevertheless, benefit-risk assessment is fundamental to improve transparency, consistency and predictability for decision making through the structured systematic approaches.
The Journal of the Convergence on Culture Technology
/
v.10
no.5
/
pp.201-208
/
2024
This study aims to analyze the causes and characteristics of conflicts arising from the relocation of national defense facilities, focusing on the Jeonju Aviation School relocation project, and to explore effective conflict management strategies. As urbanization progresses, military facilities initially located on the outskirts of cities have been integrated into urban areas, increasing the need for relocation. This process frequently results in conflicts among the government, the military, and local residents due to differing interests. This study employs a combination of literature review and surveys to examine perceptions of conflict causes and resolution strategies. The findings reveal that the primary conflict factors include inadequate information provision and consultation, noise and property value decline, and unilateral decision-making processes. Participatory decision-making was found to be effective in resolving conflicts. Based on these findings, the study proposes policy recommendations such as institutional improvements, enhanced information disclosure and communication, comprehensive compensation systems, and strengthened expertise in conflict management. This research is significant in empirically confirming the importance of participatory decision-making in national defense facility relocation projects and providing specific policy suggestions for conflict management.
This paper explores a new approach for modeling of decision-making problems that involve uncertain, time-dependent and sequence-dependent processes which can be applied to semiconductor industry. In the proposed approach, which is based on probability theory, approximate sample paths are required to be specified by probability and statistic characteristics. Completely specified sample paths are seen to be elementary and fundamental outcomes of the related experiment. The proposed approach is suitable for modeling real processes more accurately. A case study is applied to a single item production planning problem with continuous and uncertain demand and the solution obtained by the approximate path specification method shows less computational efforts and practically desirable features. The application possibility and general plan of the proposed approach in semiconductor manufacturing process is also described in the paper.
Company A, an embedded system manufacturer, has been managing multiple development projects. Executives need to understand the risk level of every project and prioritize resource distribution. Traditional project monitoring tools or excel sheets are too complex for calculating the risk factors across a functional organization. Two new charts, "Spear-head Chart" and "Float Chart" were designed to assist high level decision making processes. Two charts were used for weekly executive meetings in order to monitor project progress and rectify project direction. One page graphical monitoring tools in Company A are good enough for high management decision making. Authors explain the characteristics of two charts and propose its practical implementation in real working environment. Spear-head chart was also implemented as a system.
Spatial estimation of environmental variables has been regarded as an important preliminary procedure for decision-making. A minimum variance criterion, which has often been adopted in traditional kriging algorithms, does not always guarantee the optimal estimates for subsequent decision-making processes. In this paper, a geostatistical framework is illustrated that consists of uncertainty modeling via stochastic simulation and risk modeling based on loss functions for the selection of optimal estimates. Loss functions that quantify the impact of choosing any estimate different from the unknown true value are linked to geostatistical simulation. A hybrid loss function is especially presented to account for the different impact of over- and underestimation of different land-use types. The loss function-specific estimates that minimize the expected loss are chosen as optimal estimates. The applicability of the geostatistical framework is demonstrated and discussed through a case study of copper mapping.
Journal of the Korean Operations Research and Management Science Society
/
v.1
no.1
/
pp.89-94
/
1976
Many techniques have been applied to comprehensive regional planning through the processes of goal-building, research and analysis, plan-establishing, implementation-scheduling, and evaluation. Operations research(OR) is one of those techniques. OR has been developed in such fields of military operations, industrial engineering and business management during the last three decades in several developed western countries. It is a recent tendency for public administrators and researchers to be interested in OR for their scientific decision making. Therefore, we see that OR has not only a weak basis on, but a few practical applications to urban and regional planning. Such situation is worse in developing countries. This paper aims at investigating the possible basis and limitations or obstacles of OR application to public decision making, especially regional planning. A practical example of OR application to regional planning in Korea and its evaluation will be introduced.
The intensive care unit (ICU) is the most common place to die. Also, ethical conflicts among stakeholders occur frequently in the ICU. Thus, ICU clinicians should be competent in all aspects for ethical decision-making. Major sources of conflicts are behavioral issues, such as verbal abuse or poor communication between physicians and nurses, and end-of-life care issues including a lack of respect for the patient's autonomy. The ethical conflicts are significantly associated with the job strain and burn-out syndrome of healthcare workers, and consequently, may threaten the quality of care. To improve the quality of care, handling ethical conflicts properly is emerging as a vital and more comprehensive area. The ICU physicians themselves need to be more sensitive to behavioral conflicts and enable shared decision making in end-of-life care. At the same time, the institutions and administrators should develop their processes to find and resolve common ethical problems in their ICUs.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.