References
- Bather, J., "A continuous review model," Journal of Applied Probability. Vol.3, pp. 538-549, 1966. https://doi.org/10.2307/3212137
- Sulem, A., "A solvable one-dimensional model of a diffusion inventory system," Mathematics of Operations Research, Vol. 11, pp. 125-133, 2004.
- Berman, O., Perry, D., Stadje, W., "Optimal replenishment in Brownian motion EOQ model with hysteric parameter changes," International Journal of Inventory Research, Vol. 1(1), pp. 1-19, 2008. https://doi.org/10.1504/IJIR.2008.019205
- Ryan, S. M., "Capacity expansion for random exponential demand growth with lead times," Management Science, Vol. 50(6), pp. 740-748, 2004. https://doi.org/10.1287/mnsc.1030.0187
- Marathe, R. R., Ryan, S. M., "Capacity expansion under a service-level constraint for uncertain demands with lead times," Naval Research Logistics, Vol. 56(3) pp.250-263, 2009. https://doi.org/10.1002/nav.20334
- Jagannathan, R., "Linear programming with stochastic processes as parameters as applied to production planning," Annals of Operations Research, Vol. 30(1), pp. 107-114, 1991. https://doi.org/10.1007/BF02204812
- Szmerekovsky, J. G., "Single machine scheduling under market uncertainty," European Journal of Operational Research, Vol. 177(1), pp. 163-175, 2007. https://doi.org/10.1016/j.ejor.2005.09.047
- Kanniainen, J., "Can properly discounted projects follow geometric Brownian motion?," Mathematical Methods of Operations Research, Vol. 70(3), pp. 435-450, 2009. https://doi.org/10.1007/s00186-008-0275-0
- Zimmermann, J. H., Fuzzy Theory and Its Applications, 4th ed. Kluwer, Boston, 2001.
- Mula, J., Poler, R., Garcia-Sabater, J. P., Lario, F. C., "Models for production planning under uncertainty: a review," International Journal of Production Economics, Vol.103, pp. 271-285, 1999.
- Bitran, G., Yanesse, H. H., "Deterministic approximation to stochastic production problems," Operations Research, Vol. 32, pp. 999-1018, 1984. https://doi.org/10.1287/opre.32.5.999
- Mujde, E., "Analysis of production planning in case of the random demand," Computers & Industrial Engineering, Vol. 37 (1-2), pp.21-25, 1999. https://doi.org/10.1016/S0360-8352(99)00015-7
- Jamalnia, A., Soukhakian, M. A., "A hybrid fuzzy goal programming approach with different goal priorities to aggregate production planning," Computers & Industrial Engineering, Vol. 56(4), pp.1474-1486, 2009. https://doi.org/10.1016/j.cie.2008.09.010
- Uchino, E. and Yamakawa, T., "System modeling by a neo-fuzzy-neuron with applications to acoustic and chaotic systems," International Journal of Artificial Intelligence Tools, Vol. 4 (1 & 2), pp. 73-91. 1995. https://doi.org/10.1142/S021821309500005X