• Title/Summary/Keyword: Dam site

Search Result 334, Processing Time 0.033 seconds

AN EXPERIMENTAL STUDY OF GUIDED BONE REGENERATION OF BONE DEFECTS IN RABBIT USING RUBBER DAM (가토에서 러버댐을 이용한 골결손부의 골조직 유도 재생술에 관한 실험적 연구)

  • Jang, Chang-Dug;Whang, Hie-Seong;Shin, Sang-Hun
    • Maxillofacial Plastic and Reconstructive Surgery
    • /
    • v.21 no.2
    • /
    • pp.110-119
    • /
    • 1999
  • The principle of guided tissue regeneration (GTR), as applied to bone healing, is based on the prevention of connective tissue from entering the bony defect during the healing phase. This allows the slower bone producing cells to migrate into and reproduce bone within the defect. The principle of guided tissue regeneration has demonstrated a level of success in regenerating bone defect. Several types of membrane barrier, each one with distinct properties, have been utilized to apply this principle in bone regeneration. The purpose of this study is to introduce and discuss the attributes of rubber dam as a barrier membrane and evaluate whether improved bone regeneration can be achieved by GTR using rubber dam. In the 15 New Zealand white rabbits, full-thickness bone defects on three sites of each rabbit calvaria were made. Non membrane group served as a control and experimental group 1 was covered with rubber dam and group 2 covered with Gore-Tex$^{TM}$ membrane. Macroscopic, radiographic, microscopic examinations were made serially on 1, 2, 3, 6, 12 weeks after operation. The results were as follows: 1. Macroscopically, the control site was collapsed and filled with connective tissue throughout the experimental period. But the defects of experimental groups 1 and 2 were filled with bone-like mass and showed the hard consistency on palpation. 2. Radiographically, the early new bone formation appeared similarly from the host bone in groups 1 and 2. 3. Microscopically, there were much connective tissue at the central part of control site but the defect of group 1 and 2 was filled with the mature bony trabeculae on the 12th week. This results suggest that rubber dam can be effectively used as a barrier membrane for guided bone regeneration.

  • PDF

Changes of Benthic Macroinvertebrate Communities after a Small Dam Removal from the Gyeongan Stream in Gyeonggi-do, Korea (경기도 경안천에서 소형 보(洑)의 철거 이후에 변화된 저서성 대형무척추동물 군집)

  • Kil, Hye-Kyung;Kim, Dong-Gun;Jung, Sang-Woo;Shin, Il-Kwon;Cho, Kang-Hyun;Woo, Hyo-Seop;Bae, Yeon-Jae
    • Korean Journal of Environmental Biology
    • /
    • v.25 no.4
    • /
    • pp.385-393
    • /
    • 2007
  • Benthic macroinvertebrate communities were studied after a small dam removal from the mid-section of the Gyeongan stream in Gyeonggi-do, Korea. Quantitative sampling was conducted at immediately upstream (upper) and downstream (lower) sites from the dam as well as at the site where the dam was located (dam site: middle) using a Surber sampler (50$\times$50 cm, mesh 0.25 mm), four times (November 2004, May 2005, January 2006, and May 2006) after the dam removal. As a result, 46 species of benthic macroinvertebtates, belonged in 35 genera, 27 families, 11 orders, 5 classes, and 4 phyla, were sampled from the stream sites, but the number of species that occurred at each sampling trial was different (ranged 3$\sim$17 spp.) according to the seasons and sites. Approximately one year after the dam removal, the species number has in-creased and taxa composition has changed as the microhabitat became more heterogeneously due to a riffle formation in the upstream site. Chironomid larvae and tubificid worms, which are common in Korean urban streams, were the dominant species, while Hydropsyche kozhantschikovi was the 2nd dominant species at some sampling trials. In general, McNaughton's dominance indices decreased and Shannon species diversity indices increased approximately one year after the dam removal. Compositions of collector-filterers, clingers, and swimmers increased as hydropsychid caddisflies, heptageniid mayflies, and baetid mayflies increased, respectively, in the upstream site. The group pollution index and the ecological score using benthic macroinvertebrates both indicated that water environment has been improved in the upstream site after the dam removal.

Deformation and stress behavior analysis of high concrete dam under the effect of reservoir basin deformation

  • Zheng, Dongjian;Xu, Yanxin;Yang, Meng;Gu, Hao;Su, Huaizhi;Cui, Xinbo;Zhao, Erfeng
    • Computers and Concrete
    • /
    • v.18 no.6
    • /
    • pp.1153-1173
    • /
    • 2016
  • According to deformation data measured in some high concrete dams, for dam body deformation, there is a complex relationship with dam height and water head for different projects, instead of a simple monotonic relationship consistently. Meanwhile, settlement data of some large reservoirs exhibit a significant deformation of reservoir basin. As water conservancy project with high concrete dam and large storage capacity increase rapidly these decades, reservoir basin deformation problem has gradually gained engineers' attentions. In this paper, based on conventional analytical method, an improved analytical method for high concrete dam is proposed including the effect of reservoir basin deformation. Though establishing FEM models of two different scales covering reservoir basin and near dam area respectively, influence of reservoir basin on dam body is simulated. Then, forward and inverse analyses of concrete dam are separately conducted with conventional and proposed analytical methods. And the influence of reservoir basin deformation on dam working behavior is evaluated. The results of two typical projects demonstrate that reservoir basin deformation will affect dam deformation and stress to a certain extent. And for project with large and centralized water capacity ahead of dam site, the effect is more significant than those with a slim-type reservoir. As a result, influence of reservoir basin should be taken into consideration with conducting analysis of high concrete dam with large storage capacity.

암반지하수 저류지 개발 전망

  • 이기철;한정상;부성안;장준영;박종철
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2002.04a
    • /
    • pp.85-92
    • /
    • 2002
  • When the United Nation classified as Korea is the one of the water deficit country. The consensus was made that the water is the one of the precious national resources. Government increases their R/D budget trying to get more clean water bodies. For instances, 'Sustainable Water Resources Development' project is the one of major title in '21 Century Frontier Research project and there are several small research projects are undergoing by the Ministry of Agriculture and KARICO. However, when the environmental preservation issue has been get more emphasis, construction of the Surface Dam met the blockage from the environmentalists due to the problem of the their water buried area. Since the most fitting site for surface dam had been used in the past, some engineer move their focus on modification of the existing Dam's height to enlarge its capacity or dredging the bottom of the reservoir recently However dredging evoke water quality problem in return by accumulated materials at the bottom. Last year the Dong Gang Dam plan has been canceled by environmental problem in water buried area of the reservoir. With the point of this view, ground water gets more focus for the one of the useful alternative for clean water bodies. Underground dam technique which had widely applied once in the early nineteen eighties by the KARICO and attenuated due to engineering insufficiency. The technique is newly studied with the advanced engineering technique. Still groundwater usage rate in Korea is much lower comparing with the advanced countries and has many rooms to develop. Wells, under ground dam and radial collector wells are typical facilities up to now. There is little application in Korea for the Recharge Dam, which had been widely used in the advanced countries. The Recharge Dam is technique to conjunct surface water and groundwater body together, This technique had developed to increase groundwater recharge at the beginning This research is the result of the study on the possibility of the development of the new technology, Groundwater Reservoir' which was modified from Recharge Dam. Groundwater Reservoir is like a deep artificial lakes trenched in hard rock aquifer to get groundwater. The advantage of the Groundwater Reservoir is followings 1) It can be developed at the plains area, not in the deep valley 2) Huge water body can be developed without dam 3) Small buried area comparing surface water dam makes the least environmental effect. 4) Trenching cost can be substitute by the income of the selling rock debris 5) Outfit of the reservoir can be modified to match with the site prospect 6) Rock debris can be used as constructing materials 7) It can be used as groundwater recharge system when the heavy rains comes 8) The reservoir looks like scenery lake with huge clean water bodies.

  • PDF

Evaluation of Fundamental Period of Rockfill Dam Using Blasting Vibration Test (발파진동실험을 이용한 사력댐의 고유주기 산정)

  • Kim, Nam-Ryong;Ha, Ik-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5C
    • /
    • pp.185-192
    • /
    • 2012
  • The objective of this study is to present and verify a method for evaluating the fundamental period of a rockfill dam using artificially generated vibration from a blasting event. In this study, the artificial blasting vibration tests were carried out at the site adjacent to the existing Seongdeok Dam for the first time in Korea. The artificial vibrations were induced by 4 different types of blasting with the various depths of blasting boreholes and the various explosive charge weight. During the tests, the accelerations time histories were recorded at the crest of the dam. In this acceleration history, only free vibration decay part following the main vibration event was extracted and it was analyzed by frequency domain analysis using Fast Fourier Transform (FFT). From the results of FFT, the fundamental period of the target dam was evaluated. It is found that the effect of different blasting types on the fundamental period of the target dam is negligible and the fundamental period of the target dam can be consistently obtained by blasting vibration tests. Furthermore, it is found that the period of the target dam calculated by the method using blasting vibration test is similar to that obtained by the method of previous researchers using the real earthquake records. Therefore, in case that the earthquake record is not available, the fundamental period of a rockfill dam can be reasonably evaluated if blasting vibration test is allowed at the site adjacent to the dam.

Effect of Yongdam Dam Operation to Level of Reference Flows Downstream (용담댐 운영이 하류 기준유량 설정에 미치는 영향)

  • Noh, Jae-Kyoung;Yoo, Jae-Min;Oh, Jin-Young
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1772-1776
    • /
    • 2006
  • The Ministry of Environment is determining reference flows and goal water qualities in many stations over all around riverbasin to control TMDL. Reference flow is now defined to 10 years averaged 275th minimum flow$(Q_{275})$. Dam operation takes direct effect on flows downstream. The Yongdam mutipurposed dam was constructed in 2002 and TMDL managing stations between the Daecheong dam and the Yongdam dam are the Geumbon B, C, D, E, and F in main stream of the Geum river. Geumbon F is the Daecheong dam site. Observed flows are ideal to be used to set reference flows, but simulated flows are more practical to be used to set reference flows from the cause of the Yongdam dam's operation. A system for simulating daily storages of the Yongdam dam was constructed and the DAWAST model was selected to simulate daily streamflows. Analysis period was selected for 10 years from 1996 to 2005. Scenario was set as follows; Firstly, observed outflows from the Yongdam dam are used from 2002 to 2005 and the Yongdam dam does not exist from 1995 to 2001. Secondly, the Yongdam dam existed also from 1995 to 2001 and simulated outflows from the Yongdam dam are used from 1996 to 2005 with provision of constant outflow of $7.0m^3/s$ and water supply to the Jeonju region outsided watershed of $900,000m^3/day$. In case of scenario 1 reference flows at the Geumbon B, C, D, E, F are 4.52, 6.69, 7.96, 11.17, and $13.21m^3/s$, respectively. And in case of scenario 2 reference flows at the Geumbon B, C, D, E, F are 6.27, 8.48, 9.58, 12.73, and $15.12m^3/s$, respectively.

  • PDF

Thermo-structural monitoring of RCC dam in India through instrumentation

  • Ashtankar, V.B.;Chore, H.S.
    • Structural Monitoring and Maintenance
    • /
    • v.2 no.2
    • /
    • pp.95-113
    • /
    • 2015
  • The knowledge of the behavior of any roller compacted concrete (RCC) dam and its foundation is gained by studying the service action of the dam and its foundation using measurements of an external and internal nature. The information by which a continuing assurance of structural safety of the RCC dam can be gauged is of primary importance. Similarly, the fact that the information on structural and thermal behavior and the properties of concrete that may be used to give added criteria for use in the design of future RCC dams is of secondary importance. Wide spread attention is now being given to the installation of more expensive instrumentation for studying the behavior of concrete dams and reservoirs and forecasting of any adverse trends. In view of this, the paper traces installation and need of the comprehensive instrumentation scheme implemented to monitor the structural and thermal behavior of 102.4 m high RCC dam constructed near Mumbai in India. An attempt is made in the present paper to emphasize the need to undertake an instrumentation program and evaluate their performance during construction and post construction stage of RCC structures. Few typical results, regarding the thermal and structural behavior of the dam, obtained through instrumentation installed at the dam site are presented and compared with the design considerations. The fair agreement is seen in the response observed through instrumentation with that governing the design criteria.

Estimation of Shear Wave Velocity of Earth Dam Materials Using Artificial Blasting Vibration Test (인공발파진동실험을 이용한 흙댐 축조재료의 전단파속도 산정)

  • Ha, Ik-Soo;Kim, Nam-Ryong;Lim, Jeong-Yeul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.619-629
    • /
    • 2013
  • The objective of this study is to estimate shear wave velocity of earth dam materials using artificially generated vibration from blasting events and to verify its applicability. In this study, the artificial blasting and vibration monitoring were carried out at the site adjacent to Seongdeok dam, which is the first blasting test for an existing dam in Korea. The vibrations were induced by 4 different types of blasting with various depths of blasting boreholes and explosive charge weights. During the tests, the acceleration time histories were recorded at the bedrock adjacent to the explosion and the crest of the dam. From frequency analyses of acceleration histories measured at the crest, the fundamental frequency of the target dam could be evaluated. Numerical analyses varying shear moduli of earth fill zone were carried out using the acceleration histories measured at the bedrock as input ground motions. From the comparison between the fundamental frequencies calculated by numerical analyses and measured records, the shear wave velocities with depth, which are closely related to shear moduli, could be determined. It is found that the effect of different blasting types on shear wave velocity estimation for the target dam materials is negligible and the shear wave velocity can be consistently evaluated. Furthermore, comparing the shear wave velocity with the previous researchers' empirical relationships, the applicability of suggested method is verified. Therefore, in case that the earthquake record is not available, the shear wave velocity of earth dam materials can be reasonably evaluated if blasting vibration test is allowed at the site adjacent to the dam.

Topographical Changes in Torrential Stream After Dredging in Erosion Control Dam - Using Terrestrial LiDAR Data - (사방댐 준설이 계류의 지형변화에 미치는 영향 - 지상 LiDAR 자료를 이용하여 -)

  • Seo, Junpyo;Woo, Choongshik;Lee, Changwoo;Kim, Kyongha;Lee, HeonHo
    • Journal of Korean Society of Forest Science
    • /
    • v.103 no.3
    • /
    • pp.392-401
    • /
    • 2014
  • This research was carried out to understand the impact of mountainous torrent on topographical change of slope and sediment volume within a deposit line by dredging of soil erosion control dam. Terrestrial LiDAR surveys were conducted at dredged and non-dredged sites. Terrestrial LiDAR has an advantage on detecting topographical changes easily without demanding workmanship and technical skill for users. The distribution of erodible slope ($20^{\circ}-40^{\circ}$) was higher in non-dredged site than that of dredged site. However, the distribution was higher in dredged site than that of non-dredged site after rainy season. Erosion and deposition appeared regularly in a dredged site, but those occurred irregularly in the non-dredged site. The inflow of soil per square meter was 1.7 times higher in dredged site than that of non-dredged site after rainy season. The difference of rainfall in each site did not affect to soil erosion. The distribution of erodible slope was increased in dredged site than that of non-dredged site after rainy season due to inflow of soil from upper stream caused by dredging.

Site Suitability Analysis for Underground Dam Using Analytic Hierarchy Process (계층분석과정을 이용한 지하댐 적지분석)

  • 이상일;김병찬
    • Journal of Soil and Groundwater Environment
    • /
    • v.8 no.4
    • /
    • pp.36-44
    • /
    • 2003
  • The lack of water resources is becoming a serious issue throughout the world. The water shortage in Korea is expected to increase dramatically through 2020. The amount of water shortage could amount to 1.8 and 2.6 billion cubic meters in 2011 and 2020, respectively. Groundwater can be a solution to this matter in some places. Especially, underground dams are known to be advantageous over conventional dams, evert if they have some drawbacks such as their limited location for development and small sizes. The analytic hierarchy process(AHP) is an analytical tool, supported by simple mathematics, which enables one to explicitly rank tangible and intangible factors against each other for the purpose of resolving conflicts or setting priorities. In order to check the applicability of AHP to the evaluation of underground dam sites, lour candidate locations were chosen. They have suffered from problems like water-supply shortage and delayed dam construction. The analysis results are compared with those of the previous study using a conventional method. It is believed that the developed method can provide central or local government with a basis for reasonable decision-making regarding underground dam development.