• Title/Summary/Keyword: Dam operation rule

Search Result 37, Processing Time 0.03 seconds

A Study of Parallel Reservoir Integrated Operation considering Storage (저류량을 고려한 병렬저수지 연계운영)

  • Park, Ki-Bum;Lee, Soon-Tak
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1176-1181
    • /
    • 2006
  • The purpose of this study was to estimate water supply analysis and reliability indicators by using allocation rule(AR) about Andong Dam and Imha Dam which have parallel reservoirs system. According to the analysis results of allocation rule, for Rule(A) and Rule(B), the contribution of water supply in Andong Dam was 60% more than in Imha Dam, and for Rule(C), the contributions in Andong Dam and Imha Dam were almost equal. In Rule(C), supply is allocated by the ratio which divides the sum of storage and inflow by the mean storage according to the storage state and supply capability state of Andong Dam and Imha Dam. This Rule(C) showed good results in the water supply capability analysis and reliability analysis of parallel reservoirs. In the analysis criteria of water supply in parallel reservoirs system, monthly water change quantity showed better results than monthly constant water quantity in water supply analysis. On the basis of this study, the new technique for water supply analysis was developed to be applied to parallel reservoirs, and this operation rule will establish the efficient operation measures in the application to several kinds of parallel reservoirs system.

  • PDF

Parallel reservoirs system operation using NYC-Space Allocation-Rule (NYC-Space Allocation Rule을 이용한 병렬저수지 연계운영)

  • Park Ki-Bum;Lee Soon-Tak
    • Journal of Environmental Science International
    • /
    • v.14 no.6
    • /
    • pp.533-542
    • /
    • 2005
  • In this study, an optimization technique was developed from the application of Allocation Rule. Average Allocation coefficients of the Andong and Imha dam compare constant water supply condition with vary water supply condition that are above the contribute ratio $67\%\~50\%$ the Andong dam in Rule(A)-Rule(C). In the Refill Season, Andong dam water supply contribution is higher than Imha dam at the Control point water supply. In the Allocation analysis results, Rule(A) is calculated storage ratio because Andong dam contribute to Control point larger than Imha dam which Andong dam storage is larger than Imha dam storage. Rule(B) calculated sum of the storage and inflow ratio for Andong dam and Imha dam, as Andong dam contribution is higher than Imha dam. Rule(C) calculated that sum of storage, inflow and water supply is divided average storage ratio, as the best results of the Allocation coefficients and water supply capacity. The results of storage analysis is larger vary water supply condition than constant water supply condition and the results of water supply analysis is larger vary water supply condition than constant water supply condition. Water supply deficit is decrease $30\%$ for vary water supply condition.

Application of the SCE-UA to Derive Zone Boundaries of a Zone Based Operation Rule for a Dam (저수지 수위 구간별 운영률의 구간 경계 도출을 위한 집합체 혼합진화 알고리즘의 적용)

  • Kang, Shinuk;Kang, Taeuk;Lee, Sangho
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.10
    • /
    • pp.921-934
    • /
    • 2014
  • The purpose of the study is to derive a long term reservoir operation method that is easy to understand and apply to practical use for dam operators. The zone based operation rule is a simple method to make operation decisions by criteria corresponding to storage zones. The reservoir storage levels dividing a reservoir, however, must be determined by some methods. We developed a reservoir operation model based on the zone based operation rule and the shuffled complex evolution algorithm (SCE-UA) was used to determine storage levels for zone division. The model was applied to Angat Dam in the Philippines that has trouble in water supply due to imbalance between supply and demand. We derived a zone based operation rule for Angat Dam and applied it to the reservoir simulation of Angat Dam using the historical inflow. The simulation results showed water supply deficit and power generation were improved by 34.5% and 21.2%, respectively, when compared with the historical records. The current study results may be used to derive a long term reservoir operation rule.

Gate Operation Rule of Paldang Dam by Considering Discharge and Downstream Flow Pattern (방류량 및 하류부유황을 고려한 팔당댐의 수문조작기준 선정)

  • 서규우;이종설
    • Water for future
    • /
    • v.29 no.2
    • /
    • pp.209-219
    • /
    • 1996
  • The existing gate operation rule of Paldang hydroelectric plant has been used since the construction of the dam in 1973 except partial modification due to the construction of Chungju multipurpose dam in 1985. The water level near the downstream of Paldang dam has been lowered about 3 m because of the channel maintenance of Han River development project. Thus, the discharge estimation formula based on the submerged orifice type spillway has to be re-evaluated by considering various patterns of the gate operation rules and lowered channel bed. In this study, three types of gate openings were tested to select the proper gate operation rules through the hydraulic model test for various discharges and opening heights. Also, the numerical analysis has been performed to simulate the flow patterns of downstream. As a result, the gate operation rule, which opens 5 gates each time from the left side, was selected as the proper gate operation rule of Paldang dam.

  • PDF

Coping with Climage Change through Coordinated Operations of the Andong & Imha Dams (안동-임하댐 연계운영을 통한 미래 기후변화 대응)

  • Park, Junehyeong;Kim, Young-Oh
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.12
    • /
    • pp.1141-1155
    • /
    • 2013
  • A number of studies have been performed to analyze climate change impacts of water resources system. In this study, a coordinated dam operation is compared with an existing operation strategy for coping with projected future runoff scenarios. GCMs (Global Circulation Models) and the LARS-WG downscaling method was used to project future climate scenarios. The water balance model called abcd was employed to estimate future runoff scenarios. The existing dam operation comes from the national dam construction guideline, which is called the "level-operation method." The alternative coordinated dam operation are constructed as a linear programming using New York City rule for refill and drawdown seasons. The results of annual total inflow in future is projected to decrease to 72.81% for Andong dam basin and 65.65% for Imha dam basin. As a result of applying future runoff scenarios into the dam operation model, the reliability of coordinated dam operation, 62.22%, is higher than the reliability of single dam operation, 46.55%. Especially, the difference gets larger as the reliability is low because of lack of water. Therefore, the coordinated operation in the Andong & Imha dams are identified as more appropriate alternative than the existing single operation to respond to water-level change caused by climate change.

Effect of Sirikit Dam Operation Improvement on water shortage situations due to the land use and climate changes from the Nan Basin

  • Koontanakulvong, Sucharit;Suthidhummajit, Chokchai
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.232-232
    • /
    • 2015
  • Land use and climate changes are the important factors to determine the runoff and sediment loads from the watershed. The changes also affected to runoff volume/pattern to the dam operation and may cause flood and drought situations in the downstream area. Sirikit Dam is one of the biggest dams in Thailand which cover about 25 % of the runoff into the Central Plain where the Bangkok Capital is located. The study aims to determine the effect of land use change to the runoff/sediment volume pattern and the rainfall-runoff-sediment relationship in the different land use type. Field measurements of the actual rainfall, runoff and sediment in the selected four sub-basins with different type of land use in the Upper Nan Basin were conducted and the runoff ratio coefficients and sediment yield were estimated for each sub-basin. The effect of the land use change (deforestation) towards runoff/sediment will be investigated. The study of the climate change impact on the runoff in the future scenarios was conducted to project the change of runoff volume/pattern into the Sirikit Dam. The improvement of the Sirikit Dam operation rule was conducted to reduce the weakness of the existing operation rules after Floods 2011. The newly proposed dam operation rule improvement will then be evaluated from the water shortage situations in the downstream of Sirikit Dam under various conditions of changes of both land use and climate when compared with the situations based on the existing reservoir operation rules.

  • PDF

A Comparative Study of Reservoir Operations for Flood Control of the Chungju Dam (홍수시 충주댐 운영방안의 비교검토)

  • 이길성;정동국
    • Water for future
    • /
    • v.18 no.3
    • /
    • pp.225-233
    • /
    • 1985
  • To develop a simulation strategy of multi-reservoir operation in flood season, the single dam operations methed for the Chungju dam are investigated in the Han river basin. Thus, spillway rule curve, rigid ROM, and linear decision rules are applied for control operations, subject to the restrictions imposed by the river and the reservoir characteristics. The storage and release and control/utility efficiencies for several floods are calculated. The variation of control coefficients with respect to the return period are also examined. As the results of this comparative study, the optimal operation method can be selected in terms of the magnitude of flood. With inflow forecasting, the flood control operation can be greatly improved by variable coefficients rigid ROM and linear decision rules.

  • PDF

Flood Control Operation of Soyang and Choongju Reservoirs by the Min-max DP (Min-Max DP에 의한 소양 및 충주호의 홍수조절운영)

  • 오영민;이길성
    • Water for future
    • /
    • v.19 no.4
    • /
    • pp.339-346
    • /
    • 1986
  • A real-time single reservoir operation model using the Min-max Dynamic Programming for the flood control of Soyanggang Dam and Choongju Dam is developed. The objective function is to minimize the maximum release from each dam and the constraints are those from ther reservoir and channel characteristics. Control and utilization efficiencies are used to measure the performance of the reservoir operation method (ROM). In comparison with those of simulation models(such as the Rigid ROM, the Technical ROM and the Linear Decision Rule), the efficiencies of the optimization model are superior for all return periods.

  • PDF

Multipurpose Dam Operation Models for Flood Control Using Fuzzy Control Technique ( III ) - Multi Reservoir Operation Methods - (퍼지제어모형을 이용한 다목적댐의 홍수조절모형 (III) - 댐군의 연계운영방안 -)

  • Shim, Jae-Hyun;Kim, Ji-Tae;Cho, Won-Cheol;Kim, Jin-Young
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.4 no.3 s.14
    • /
    • pp.61-72
    • /
    • 2004
  • In this research, multi reservoir operation methods for reservoirs in Han River are proposed based on the single dam operation models using fuzzy control techniques. The result of fuzzy controled single dam operation has shown that it can improve flood controllability at the downstream of dams. Among the many control rules of fuzzy operation, a rule that shows the most effective flood control rate at the downstream has been selected as Ike operation rule. The simulated results for 1990 and 1995 flood events are compared with historical ones. As the results, it is founded that suggested models can reduce the inundation of upstream and keep the water elevation lower at downstream, which make the proposed models as the effective methods in multi reservoir operation.

Effect of Chungju Dam Operation for Flood Control in the Upper Han River (충주댐 방류에 따른 댐 상하류 홍수위 영향 분석)

  • Kim, Sang Ho;Kim, Ji-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.537-548
    • /
    • 2013
  • In this study, the hydraulic channel routing model was constructed to analysis the effect of flood control with the operation of Chungju Dam for 2006 flood. Study area was divided with up- and downstream of Chungju Dam in the upper Han River of Paldang Dam. The model was calibrated and verified for the flood event of 1995-2008. The effects of flood control of Chungju Dam were compared with the simulation results without the dam, and the rising effects of stage in the main observation stations were analyzed by the variation of released dam discharge. Consequently, the operation of Chungju Dam for 2006 flood was performed properly, but the effects of flood control of Chungju Dam were so focused in downstream of the dam that institutional complement was demanded to reduce the flood damage in the upper region of the dam. The limit of decision rule of downstream stage in the backwater region of dam was analyzed to solve the problem, and the decision rule of downstream stage was proposed to consider the discontinuity between the backwater region of dam and the design flood of upper stream. The proposed rule will be used to design the reduction of flood damage in upper stream of dam and to apply the analysis of region for flood damage.