• Title/Summary/Keyword: Daily schedule

Search Result 174, Processing Time 0.024 seconds

Design and Implementation of Scheduler Applications for Efficient Daily Management (효율적 일상 관리를 위한 일정관리 어플리케이션의 설계와 구현)

  • Park, Eunju;Han, Seungjun;Yoon, Jimin;Lim, Hankyu
    • Journal of Internet Computing and Services
    • /
    • v.22 no.2
    • /
    • pp.41-50
    • /
    • 2021
  • According to the progress of IT and data processing technology, the usage of internet increased rapidly and various smart devices are appearing. As such, modern people use smartphone to acquire informations they wish and also on daily life including leisure activity free of place. This study has designed and implemented schedule managing application that can help effective managing of our daily life, such as taking note of schedule and sharing appointments. The schedule managing application in this study offers diary taking, sharing the registrated schedule with other users on kakaotalk, saving the deleted schedule or diary to certain folder when users delete file, continuous alarm of daily schedule function together with schedule registration function. The application which is differentiated to other applications and raised usage is expected to effectively manage the busy everyday life.

A study on the Human Resource Management through Application of Daily Scheduling Check System (일일 공정 Check System을 활용한 인력관리 사례 연구)

  • Park Chan-Jeong;Park Hong-Tae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.124-132
    • /
    • 2004
  • A human resource management of the general contractors is to mostly deal with daily input by each subcontractor in construction fields. However, this way has some limitations; the identification of proper human-input and productivity, preventive activities or efforts for minimizing schedule delay. The reason why these limitations are that few systematic efforts through a coordinated field administration with the construction schedule planning and human resources. Therefore, on the basis of the construction schedule planning, human resource management of subcontractors is necessary to make for an improvement in construction schedule control. Daily Scheduling Check System(DSCS), as the linked human resources on an existed CPM scheduling software, was developed and this paper then verified validity and effectiveness of using the DSCS for the framework of some actual apartment construction projects

Implementation of a Travel Route Recommendation System Utilizing Daily Scheduling Templates

  • Kim, Hyeon Gyu
    • Journal of the Korea Society of Computer and Information
    • /
    • v.27 no.10
    • /
    • pp.137-146
    • /
    • 2022
  • In relation to the travel itinerary recommendation service, which has recently become in high demand, our previous work introduces a method to quantify the popularity of places including tour spots, restaurants, and accommodations through social big data analysis, and to create a travel schedule based on the analysis results. On the other hand, the generated schedule was mainly composed of travel routes that connected tour spots with the shorted distance, and detailed schedule information including restaurants and accommodation information for each travel date was not provided. This paper presents an algorithm for constructing a detailed travel route using a scenario template in a travel schedule created based on social big data, and introduces a prototype system that implements it. The proposed system consists of modules such as place information collection, place-specific popularity score estimation, shortest travel rout generation, daily schedule organization, and UI visualization. Experiments conducted based on social reviews collected from 63,000 places in the Gyeongnam province proved effectiveness of the proposed system.

Construction Delay Analysis Using Daily Work Report Data for Short Construction Seasons

  • Jamal, Md Shah;Abdelaty, Ahmed;Shrestha, K. Joseph
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.616-623
    • /
    • 2022
  • Some regions and states, such as Wyoming, have harsh weather conditions, forcing most transportation projects to be completed under tight schedules. However, construction projects are not only delayed by weather conditions, but also delayed by other factors such as contractor's competency, resource availability, coordination issues, and safety. Also, the construction method, geographical location of the projects, and inability to follow baseline schedules accurately due to the contractor's resource allocation are also reasons for the delay. This paper discusses the main reasons for the delay in the public transportation projects based on Daily Work Reports (DWRs) from five different transportation projects of the last three years in Wyoming. This paper focuses on the inconsistencies of the contractor's schedules to complete the project according to the baseline schedule. First, the authors collected DWRs and baseline schedules from the Wyoming Department of Transportation (WYDOT). Second, the DWR data are compared against the baseline schedules to determine the reasons for delaying their significance. Finally, the paper presents the recommendations to mitigate the effects of delays on public transportation projects as well as to improve the documentation process of DWR data.

  • PDF

Integration Model of Cost and Schedule in Aluminum Form Work based on Quantity Take-offs and Daily Productivity Analysis (물량 산출 및 생산성 분석 기반의 거푸집공사 비용공정 통합 모델)

  • Ji, Soung-Min;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.17-18
    • /
    • 2011
  • Over the past 20 years, Researchers have tried to develop "Integration Model of Cost and Schedule" in construction industry. They suggested various models and techniques, however, it is still required to develop new methodology for AL Form Work in Public Multi-Housing Projects. Accordingly, this research focused on measuring quantity take-offs of on-going projects and analysing the basic process of using the resources(Labor, Material, Plant) related to cost and time data. There are 3 steps of this research : 1) The literature review of previous studies about Integration Model of Cost and Schedule was conducted. 2) Model for integration between cost and schedule was developed. 3) the accuracy of developed model was verified. The results are expected to improve in integrated managing the cost and schedule data of AL form work.

  • PDF

A Scheduling System for the Patient Treatment on a Heavy-ion Radiotherapy

  • Toyama, Hinako;Shibayama, Kouichi;Kanatsu, Syusuke;Kuroiwa, Toshitaka;Watanabe, Hideo;Wakaisami, Mitsuji;Tsuji, Hiroshi;Endo, Masahiro;Tsujii, Hirohiko
    • Proceedings of the Korean Society of Medical Physics Conference
    • /
    • 2002.09a
    • /
    • pp.177-179
    • /
    • 2002
  • We have developed a scheduling system for heavy ion radiotherapy considering the condition of three treatment rooms and treatment planning for each patient. This system consists of a database (patient information, treatment method and machine schedule), a schedule for radiotherapy and WEB server. All operation of this system, such as data input, to change and to view the schedule, are performed by using a WEB browser. In order to protect personal information for the patients, access privilege to each information are limited by according to the occupational category. This system is connected with a hospital central information management system (AMIDAS) and an irradiation-managing computer for the heavy ion radiotherapy. A basic information for the patient is got from AMIDAS and the daily schedule sends to the treatment control computer at each treatment room through the irradiation-managing computer every morning. The daily, weekly, monthly schedules in the treatment room and the treatment condition of each patient are shared on the WEB browser with the all participants of the heavy ion therapy. This system could be useful to save a time to generate a treatment schedule and to inform us the most up-to-date treatment schedule and the related information at the same time.

  • PDF

A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.

Determination of Work Schedule Type by Dynamic Programming (동적계획모형을 이용한 근무형태 결정)

  • 김중순;안봉근;손달호
    • Korean Management Science Review
    • /
    • v.20 no.2
    • /
    • pp.33-43
    • /
    • 2003
  • In this paper we applied dynamic programming to determining work schedule type. In dynamic programming formulation, each day during a planning horizon represents a stage for which a decision is made. The alternatives are given by work schedule types that combine regular time, overtime, additional shift, and so on. In this case, their associated return function is labor cost. The state is defined as the amount of work time allocated to stage 1, stage 2,…, and current stage. A case study for a real manufacturing company was performed to apply dynamic programming to scheduling daily work hours during a week. The case study showed that total cost of our solution derived from dynamic programming decreased by about 6% as compared with the solution obtained from the previous method.

Estimation of nursing costs by Patient Classification System(PCS) in general nursing units (일반간호단위의 환자 분류군별 간호원가 산정연구)

  • Park, Hung-Ho;Song, Mi-Sook;Sung, Young-Hee;Sim, Won-Hee
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.9 no.3
    • /
    • pp.379-389
    • /
    • 2003
  • Purpose: The objective of our study was to figure out costs of nursing services in general nursing units based on the PCS in order to determine an appropriate nursing fee schedule. Method: The data were collected from 8 hospitals from September 9 to October 8, 2002. The costs of nursing services in general nursing units was analyzed by nursing hours based on the nursing intensity. The inpatient in the general nursing units were classified by Park's PCS tool(2000). Results: The distribution of patients by PCS ranged from class I to Class III in general nursing units. The higher PCS in general nursing units consumed more nursing hours. As a result, the higher nursing intensity, the more the daily average nursing costs in general nursing units. Conclusion: We found that the higher PCS, the more the daily average nursing costs in general nursing units. In conclusion, our study provides the evidence to refine the current nursing fee schedule that it does not differentiated from the volume of nursing services based on the nursing hours.

  • PDF

A production schedule with genetic algorithm in block assembly shop (유전 알고리즘을 이용한 블록조립공장의 생산일정계획)

  • 고시근
    • Korean Management Science Review
    • /
    • v.13 no.1
    • /
    • pp.1-12
    • /
    • 1996
  • This paper deals with production scheduling of block assembly shop in shipbuilding company. The Objectives of the schedule are leveling of daily total workload and fair assignment of workload to each department of the shop. Optimizing the objectives, we consider some restrictions which consisit of block due dates, workability of each department, and space restriction. We formulate the problem in mathematical form. But the model is too complex to find the optimal solution (the problem is NP-complete) and we use the genetic algorithm to find a good solution.

  • PDF