• Title/Summary/Keyword: Cut slopes

Search Result 221, Processing Time 0.03 seconds

Studies on Erosion Amount of the Newly - Constructed Forest Road (신설임도(新設林道)의 초기침식량(初期侵蝕量)에 관(關)한 연구(硏究))

  • Jung, Do-Hyun
    • Journal of Korean Society of Forest Science
    • /
    • v.84 no.3
    • /
    • pp.319-332
    • /
    • 1995
  • This research was carried out to investigate the influences of forest road characteristics and rainfalls on the amount of erosion on the newly - constructed forest road in the Research Forests of Seoul National University located in Mt. Backwoon - san, Kwangyang. Amount of soil erosion on the newly - constructed forest road was measured for 2 years since the forest road construction. Using the stepwise multiple regression method, amount of soil erosion from cut - slopes, fill - slopes, road surfaces, and side - ditches were seperately expressed as a function of statistically significant road design and rainfall factors, and multiple regression models to estimate the amount of soil erosion were significant to explain the variance in erosion by each structures. According to results of this study, amount of erosion from the newly - constructed forest road was estimated as much as 668.51m/km for 2 years. Out of total amount of soil erosion, 21.9%(144.27m/km) from cut - slopes, 39.8%(261.89m/km) from fill - slopes, 8.1%(53.33m/km) from road surfaces, and 30.2%(199.02m/km) from side - ditches were occurred.

  • PDF

The Study for Utilizing Data of Cut-Slope Management System by Using Logistic Regression (로지스틱 회귀분석을 이용한 도로비탈면관리시스템 데이터 활용 검토 연구)

  • Woo, Yonghoon;Kim, Seung-Hyun;Yang, Inchul;Lee, Se-Hyeok
    • The Journal of Engineering Geology
    • /
    • v.30 no.4
    • /
    • pp.649-661
    • /
    • 2020
  • Cut-slope management system (CSMS) has been investigated all slopes on the road of the whole country to evaluate risk rating of each slope. Based on this evaluation, the decision-making for maintenance can be conducted, and this procedure will be helpful to establish a consistent and efficient policy of safe road. CSMS has updated the database of all slopes annually, and this database is constructed based on a basic and detailed investigation. In the database, there are two type of data: first one is an objective data such as slopes' location, height, width, length, and information about underground and bedrock, etc; second one is subjective data, which is decided by experts based on those objective data, e.g., degree of emergency and risk, maintenance solution, etc. The purpose of this study is identifying an data application plan to utilize those CSMS data. For this purpose, logistic regression, which is a basic machine-learning method to construct a prediction model, is performed to predict a judging-type variable (i.e., subjective data) based on objective data. The constructed logistic model shows the accurate prediction, and this model can be used to judge a priority of slopes for detailed investigation. Also, it is anticipated that the prediction model can filter unusual data by comparing with a prediction value.

WEB-BASED GEOGRAPHIC INFORMATION SYSTEM FOR CUT-SLOPE COLLAPSE RISK MANAGEMENT

  • HoYun Kang;InJoon Kang;Won-Suk Jang;YongGu Jang;GiBong Han
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1260-1265
    • /
    • 2009
  • Topographical features in South Korea is characterized that 70% of territory is composed of the mountains that can experience intense rainfall during storms in the summer and autumn. Efficient planning and management of landscape becomes utmost important since the cutting slopes in the mountain areas have been increased due to the limited construction areas for the roadway and residential development. This paper proposed an efficient way of slope management for the landslide risk by developing Web-GIS landslide risk management system. By deploying the Logistic Regression Analysis, the system could increase the prediction accuracy that the landslide disaster might be occurred. High resolution survey technology using GPS and Total-Station could extract the exact position and visual shape of the slopes that accurately describe the slope information. Through the proposed system, the prediction of damage areas from the landslide could also make it easy to efficiently identify the level of landslide risks via web-based user interface. It is expected that the proposed landslide risk management system can support the decision making framework during the identification, prediction, and management of the landslide risks.

  • PDF

The Effect of Cut-slope on Structural Behavior of Cut-and-Cover Tunnel (굴착경사가 개착식터널의 구조적거동에 미치는 영향에 관한 연구)

  • 유건선
    • Journal of the Korean Geotechnical Society
    • /
    • v.17 no.6
    • /
    • pp.245-255
    • /
    • 2001
  • Existing cut-and-cover tunnels are designed regardless of cut-slope under the assumption that the overburden weight of backfill soil acts on tunnel arch and the earth pressure at rest acts on tunnel walls. However, actual earth pressures acting on the tunnel lining depend on open-cut size composed of cut-slope and cut-width, and thus the tunnel lining shows a different structural behavior. This study investigated the effect of cut-slope on structural behavior of the cut-and-cover tunnel lining as follows; Firstly, a comprehensive numerical analysis method using FLAC2D code was used and verified by field measurements of tunnel profile. Secondly, based on the verified numerical analysis technique, earth pressure acting on the lining, and displacement and sectional force developed on the lining were estimated with various shapes of cut-slopes$30^{\circ}\;, 456{\circ},\; 60^{\circ},\; and\;75^{\circ}%). Numerical analysis results indicate that the steeper cut-slope shows the more displacement and moment of the tunnel lining.

  • PDF

Assumption of Failure Surface using Borehole Image Processing System in Failed Rock Slope (Borehole Image Processing System에 의한 붕괴사면의 활동면 추정)

  • Yoo Byung-Ok;Chung Hyung-Sik
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 1999.08a
    • /
    • pp.217-239
    • /
    • 1999
  • Investigation methods of cut slope are conducted generally only geological surface survey to gain engineering geological data of cut slopes. These methods have many problems such as limitation of investigation for a special area. So geophysical investigations such as geotomography, seismic and electrical resistivity methods have been used to search for failure surface in potential failure slopes or failed slopes. But investigation method using the borehole camera is recently a used method and it is thought that this method is more reliable method than other investigation methods because of being able to see by the eyes. Therefore, this paper was conducted investigations of 4 boleholes and BIPS (Borehole Image Processing System) to search for potential sliding surfaces and was applied to obtain information of discontinuity on failed highway slope. As the results of BIPS, we could decide potential sliding surface in the slope and conducted to check slope stability. And decided slope stability measures.

  • PDF

Progression of Restoration of Soil Physical Properties and Vegetation in Logging Roads - In Case of 9 Years Results after Construction of Logging Road - (벌채지내(伐採地內) 운재로(運材路)의 토양물리성(土壤物理性) 및 식생(植生)의 회복과정(回復過程) - 운재로(運材路) 개설(開設)이후 9년 경과의 경우 -)

  • Woo, Bo-Myeong;Kim, Kyung-Hoon;Park, Jae-Hyeon;Choi, Hyung-Tae
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.1 no.1
    • /
    • pp.18-27
    • /
    • 1998
  • To investigate the restoration progression on soil physical properties and vegetation at the surface of logging road affected by timber harvesting operation. This study was carried out at logging roads constructed from 1989 to 1994 in Mt. Baekwoon, Kwangyang, Chollanam-do. Judging from the analysis of soil hardness, there were significant changes in the depth of soil between 5 and 10cm. Soil hardness was recovered from the compacted condition to the natural forest condition after 9 years passed. Soil macroporous ratio (pF2.7) of topsoil was higher than that of deep soil. Soil moisture retention of topsoil was more improved than that of deep soil. From the view of soil bulk density, the necessary time for recovering to the undisturbed condition of forest soil was about 10 years in the logging road left. Soil physical properties such as soil bulk density and porous ratio were recovered as time passed. Improved soil physical properties promoted the plant recovery on the logging road surface. The dominant species on the logging roads were Comus kousa, Prunus sargentii as overstory species, Rubus crataegifolius, Lespedeza bicolor as understory species, and Saussurea gracilis, Pteridium aquilinum var. latiusculum as herbaceous species. The plant recovery of bank-slopes was faster than that of cut-slopes and road surface. In progress of year, average plant coverage were 70 to 90% in cut- and bank-slopes and 30 to 60% on the logging road, surface which was elapsed 9 years after logging road construction. Therefore, additional planting and seeding work could be effective to the soil condition and vegetation restoration.

  • PDF

Analysis Gabion Works in Cut-slopes Characteristics and Scenic Preference (도로비탈면 돌망태공법의 특성 및 경관선호도 분석)

  • Park, Jae-Hyeon;Kim, Choonsig
    • Journal of Korean Society of Forest Science
    • /
    • v.104 no.2
    • /
    • pp.206-212
    • /
    • 2015
  • This study was carried out to assess the characteristics of gabion on road cut-slopes, and analyze the scenic view preference for the gabion in Korea. 97 gabion sites from road cut-slopes were selected and were classified into 10 application types of gabion. The classification types of gabion were mostly related to the erosion and collapse prevention across road cut-slope. Gabion work sites in this study were classified into 30 sites (31%) for below 10% gradient, followed by 31 sites (32%) for 11~30% gradient, 20 sites (21%) for 31~50% gradient, and 16 sites (16%) for 51~80% gradient. Gabion works were constructed mostly in low gradient than in high gradient. 34 gabion sites (35%) among 97 sites were not covered by vegetation and 52 gabion sites (54%) showed vegetation cover rates of 1~30%. On the scenic preference analysis, public groups understood that the scenic view of gabion in cutting slope can be improved by vegetation cover, whereas expert groups prefer to scenic view of gabion only. However, expert groups encouraged subsequently vegetation covering to improve scenic view during gabion works in cutting slope.

A Study on Plant Succession Stages of Highway Cut-slope - In case study on Joongbu-highway - (고속도로(高速道路) 절토(切土)비탈면의 식생천이과정(植生遷移過程)에 관(關)한 연구(硏究) - 중부고속도로(中部高速道路)를 중심(中心)으로 -)

  • Woo, Bo-Myeong;Kim, Nam-Choon;Kim, Kyung-Hoon;Jeon, Gi-Seong
    • Journal of Korean Society of Forest Science
    • /
    • v.85 no.3
    • /
    • pp.347-359
    • /
    • 1996
  • This study was carried out to find the plant succession stage on highway cut-slopes. In order to analyze succession stage, plant survey with belt transect method was carried out in 1989 and 1995 at Joongbu-highway cut-slopes. The results could be summarized as follows ; The mean plant coverage of cut-slope was 78.3%. Plant coverage of Lower part area was higher than that of upper part area. Pioneer herb species on cut-slope were Miscanthus spp., Arundinella spp., Artemisia spp. etc., and pioneer woody species were Rubus crataegifolius, Robinia pseudoacacia, Pueraria thunbergiana, Pinus spp. etc. Also, among the introduced turf grasses, Eragrostis curvula is the pioneer species. Due to short of maintenance works, Zoysia japonica which has been planted by sodding work was found to decrease or diminish gradually. The ratio of pioneer stage plants, domestic and introduced herb species, seems to decrease, while the ratio of woody species which are advanced stage plants seems to increase. Maintenance works are needed to management and monitoring of plant succession on cut-slope, and use of herb and woody species will be effective.

  • PDF

Study on Suggestion a Standard Installation for Damage Reduction alarm System using Cut-Slope Data (국내 도로절개면 현황 및 붕괴 분석을 통한 경보시스템 설치 기준에 관한 기초적 연구)

  • Bae, Gyu-Jin;Koo, Ho-Bon;Baek, Yong
    • The Journal of Engineering Geology
    • /
    • v.12 no.1
    • /
    • pp.53-61
    • /
    • 2002
  • Cut-slope due to the road construction is one of the most significant problems in the domestic case, that is, 70% of the land is covered by mountain. Moreover, typhoons or heavy rains concentrated in summer season causes the failure of cut-slope. Rock-fall and soil slope failure take 40.8% and 29.5% out of the entire domestic cut-slope failure, respectively. Rock-fall is quickly occurred by the free fall or rolling of rock fragments generally in the upper slope. Soil slope failure produces a clastics-flow and increases casualty especially when caused by heave rainfall because the velocity of the movement is verb high. Considering the car speed and rock-fall velocity, it will take a life in a moment. This study analyzes a set of field data of most recently collapsed domestic road cut-slopes to characterize these cut-slopes and the nature of rock-falls and clastics flows at each site. Based on the results, design criteria for a road alarm system are proposed, considering the relationship between the time required for clastics-flow and the velocity and braking distance of a cat at the incidence. The road alarm system proposed herein would operate instantly after a rock-fall and it will minimize damages, by warning drivels approaching to the collapse or collapsing location in advance.

A Case Study on Cut Slope Failure due to the Geomorphological Factor (지형요인에 의한 절토사면 붕괴사례)

  • Kim, Seung-Hyun;Choi, Ji-Yong;Rhee, Jong-Hyun;Lee, Jung-Yup;Koo, Ho-Bon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.1161-1170
    • /
    • 2009
  • The Roads in Gangwon Province generally was made on purpose to use the military road. In case of these roads, tremendous dangerous cut slopes do exist and its road linear shape was badly designed. In order to make up for this situation, the government has continuously established the new road or performed the public works such as the straight line of the curved road. Soksil 2 cut slope was made through the road improvement work. This has small surface failures and collapses. In spite of dry season, this slope are leaking lots of groundwater at the unbelievable point. So as to get curious phenomenon right, we performed a detailed field investigation, the geomorphological analysis, the stability analysis considering field characteristic and ultimately proposed the countermeasure to make sure stability of Sokil 2 cut slope.

  • PDF