• Title/Summary/Keyword: Cost-Plus

Search Result 204, Processing Time 0.021 seconds

The Cost-Benefit Analysis of the NutriPlus Program in Daejeon Dong-gu Health Center (영양플러스 사업의 비용편익분석 - 대전 동구보건소를 중심으로 -)

  • Kim, Hyun Ju;Kim, Sung Han
    • The Korean Journal of Food And Nutrition
    • /
    • v.28 no.4
    • /
    • pp.717-727
    • /
    • 2015
  • Although the NutriPlus program has shown considerable evidence of enhancing users' nutritional status, the budget does not cover all eligible mothers and children. This study aimed to conduct a cost-benefit analysis of the NutriPlus program to assess its economic efficiency. 53 families with 79 users in the NutriPlus program at Daejeon Dong-gu Health Center participated in this study with informed consent. The costs and benefits were estimated from both the administrator's and users' perspectives. We converted the time cost into Korean currency based on the minimum wage in 2014. The value of nutrition education and service (B2), estimated by contingency valuation method (CVM), was counted as an economic benefit. 6 families (11.3%) were recipients of national medical care and 22 families (41.5%) paid 10% of the food package cost by themselves. The total cost was \7,450,167 and the total benefit was \12,402,239. The budget for the health center (C1+C2+C3+C4) was \5,984,381 a month. Time and transportation cost for receiving nutrition education (C6) differed significantly according to the economic status of families. Household food consumption increase (C4-B4) was 40,379 in the poverty group, which was four times more than in the other groups. The net benefit (B-C) was \4,852,172 and the B/C ratio was 1.66. Therefore, the NutriPlus program is beneficial in the economic aspect as well as in the nutritional aspect. If the enhancement of nutritional status was also considered, the total benefit would be even higher. These results confirm the legitimacy of a secure budget for the NutriPlus program. And we suggest expanding its budget to cover more eligible individuals to improve people's health and welfare.

Empirical Analysis of Man-hour Data to Support a Cost-Plus Pricing Approach for Estimating BIM Service Costs

  • Koo, Bonsang;Lee, Ghang;Kim, Chung-woon;Shin, Byungjin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.660-661
    • /
    • 2015
  • Building Information Modeling (BIM) is a nascent technology in Korea, and currently lacks formal guidelines to assist Architectural and Engineering (AE) firms in estimating BIM service fees, while also allowing government agencies to allocate budgets for the rendered BIM services. This research provides a method to estimate costs for BIM services based on the cost-plus pricing framework. The approach requires a generalized estimate of the man hour per floor area data to calculate the direct labor costs. Man-hour data were collected from forty five projects that have implemented BIM. Interpolation of the man-hours was performed to develop a general reference table for 'Type 2' (i.e., public schools and office buildings, etc.) projects. By providing an objective approach for estimating the costs of BIM services, it allows clients and AE firms to agree upon a fair cost for BIM related services, and thus expedite its adoption in Korea.

  • PDF

EVALUATION OF COST-TIME RELATIONSHIPS FOR CONTRACTORS PARTICIPATING IN COST-PLUS-TIME BIDDING

  • Saeed Abdollahi Sean Pour;Hyung Seok David Jeong
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.479-487
    • /
    • 2013
  • State Highway Agencies (SHAs) have started utilizing cost-plus-time bidding (A+B bidding) since Federal Highway Agency (FHWA) declared it operational on May 4, 1995. Although this technique has successfully accelerated many projects by incorporating construction time in the bidding competition, a framework to illustrate the interactions of incentive/disincentive (I/D) rates on the competitiveness of contractors participating in the bid competition is yet to be developed. In a previous research, authors indicated that for each bid competition there is an efficient cap for I/D rates which are dictated by the capabilities of contractors in project acceleration. However, the results of previous study were based on the assumption that there is a statistically significant relationship between cost and time. In this study, the entire cost-plus-time projects implemented by the Oklahoma Department of Transportation (ODOT) were investigated. Then the significance of relationship between cost and time were analyzed for each contractor utilizing Analysis of Variance (ANOVA) technique, and the price-time function of each contractor was determined by regression analysis. The results of the analysis indicate that there is a significant relationship between cost and time for the majority of contractors. However, a quadratic relationship is not always significant and for some contractors a linear price-time relationship is significant. The results of this project can be used not only by ODOT to optimize the incentive/disincentive rates but also by contractors to determine the most competitive strategies of other bid participants.

  • PDF

A Study on Improving Pricing Criteria for Post-Construction Evaluation (건설공사 사후평가 용역대가기준 개선방안)

  • Kim, Seok;Lee, Du-Heon;Park, Jae-Woo
    • The Journal of the Korea Contents Association
    • /
    • v.16 no.8
    • /
    • pp.661-670
    • /
    • 2016
  • In 2000, post-construction evaluation was introduced for the purposes to evaluate demand, cost, and construction period of public construction projects and to reduce errors of public order agencies. However, pricing guide of post-construction evaluation has not been established, which becomes a cause of quality degradation of post-construction service and conflict occurrence. This study suggests the pricing guide in the form of percentage of construction cost method and cost plus fee method based on data of post-construction evaluation. This study investigates the construction costs and service costs for post-construction evaluation and conducts the comparative analysis of 'percentage of construction cost method' and 'cost plus fee method.' The analysis result shows 'cost plus fee method' is more accuracy than 'percentage of construction cost method.' In particular, cost plus fee method includes various correction coefficients, such as distance, area, and integration, in order to reflect the project characteristics of each infrastructure, and suggests linear construction (roads, railways), nonlinear construction I (housing and industry complex), and nonlinear construction II (airports, seaports, dams, water and sewage).

Proposal and Evaluation of the Safety Inspection Cost Estimation Model for Multi-building Construction Project (군집시설물 건설공사의 안전점검 대가 산정모델 제안 및 평가)

  • Kim, Jin-Won;Bang, Jong-Dae;Sohn, Jeong-Rak
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.33 no.12
    • /
    • pp.11-18
    • /
    • 2017
  • The safety inspection cost of the construction work was based on commercial facilities classified as a single building. Therefore, it is not possible to fully reflect the characteristics of the multi-building construction project such as apartment houses. Therefore, this study suggests a reasonable estimation model that can fully reflect the characteristics of the multi-building construction project. The safety inspection cost estimation model proposed two models such as construction cost ratio method and cost plus fixed fee method. And these models were simulated by the apartment construction work and compared with the current standard. As a result, the current construction cost ratio method has shown that the safety inspection cost tends to be overestimated as the construction size increases. Therefore, the proposed model has reflected characteristics of the multi-building construction project, so that it can reasonably estimate the safety inspection cost more than the current standard.

A study on the MVNO Wholesale Price in Competitive Communication Service Market (경쟁적인 통신서비스 시장에서 MVNO 도매대가 산정에 관한 연구)

  • Sawng, Yeong-Wha;Bae, Khee-Su;Jeon, Heung-Joo
    • Journal of Information Technology Applications and Management
    • /
    • v.19 no.2
    • /
    • pp.217-231
    • /
    • 2012
  • In the past, companies should make enormous facility investment and acquire a right to do business in order to join communication markets, but now they can do business without important facilities, such as communication networks. Such a movement to ease regulations about companies which want to newly join the communication industry is expected not only to change a competition frame of the mobile communication market but also to greatly affect the entire communication industry. Through this study aiming to look into a way to calculate a reasonable wholesale price related to the government's introduction of the Mobile Virtual Network Operator (MVNO) system, I came up with a following result. I applied the operating profit percentage and the ratio of operating gain to cost to the cost plus model and retail minus model, respectively, to calculate the wholesale price and found that when I calculated with the cost plus model applying the operating profit percentage, I could get the highest wholesale price. On the other hand, I got the lowest wholesale price with the retail minus model by applying the operating profit percentage. Division of expenses and calculation of profit percentage are important factors in calculating the wholesale price and such results are expected to help accurate calculation of the MVNO wholesale price.

An Analysis of the 2014 Pricing Guide for Technical Service Contracts through Comparison with Foreign Countries' Cases (해외사례 비교를 통한 2014년 개정 건설기술용역 대가기준 분석)

  • Lee, Taewon;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.152-164
    • /
    • 2015
  • Enhancing clarity and transparency of the pricing guide for technical services for public construction works enables the prediction and reimbursement of the service cost for project owners and bidders, while it would also yield benefits for engineers who carry out the construction tasks. In order to improve the global competitiveness of construction service industry, the government revised its pricing guide for techical services for construction works recently, moving away from its previous percentage-of-construction-cost method towards the Cost Plus a Fee Method. However, since the Cost Plus a Fee Method results in the rise of the service price by 153%~197%, there is the need for a review on the method and basis of the adjustment in order to avoid controversies regarding the application of the revised method. In this context, this paper analysed the 2014 revision of the pricing guide for technical services for public construction works through comparison with foreign cases including those of the US and the UK. The analysis yielded the conclusion that, while the shift towards Cost Plus a Fee Method which is widely used in advanced economies is a very meaningful change in large measure, certain aspects still remain problematic. Unlike in advanced economies, the detailed break-down shows the direct labor cost includes certain indirect expenses. Also, indirec expenses are admitted so comprehensively as to include overhead costs and technology royalties. These problems results in redundant estimation of certain expenses, and obstructs transparency in spending details. This paper proposes various improvement measures to address these issues.

A Study on the Life Cycle Cost Analysis of the See-through a-si Building Integrated Photovoltaic System (투광형 비정질 BIPV 시스템의 LCC 평가에 관한 연구)

  • Lee, Han-Myoung;Oh, Min-Seok;Kim, Hway-Suh
    • Journal of the Korean Solar Energy Society
    • /
    • v.29 no.1
    • /
    • pp.1-10
    • /
    • 2009
  • This study was carried out to evaluate the Life Cycle Cost(LCC) of three types of RTPV(Building Integrated Photovoltaic) systems-Glass plus Granite. Crystalline BIPV and See through Amorphous BIPV-which were vertically installed to generate the same power output(76 kW level). Initial investment costs. cost. savings and maintenance costs had been predicted during the period of analysing the LCC of three types of BIPV(Building Integrated Photovoltaic) systems installed for the purpose of evaluating the LCC. In case of cost savings, it had been analyzed by measuring the amount of electric power generated, reduction in lighting load and heat & cooling loads through simulation. From this analysis, it was predicted that the See-through amorphous BIPV offering cost saving advantages demonstrated the economical efficiency similar to the Class plus Granite when it is backed by more than 20 years of durability.

Introduction to S-PLUS and graphical comparison with SAS (S-PLUS의 소개 및 SAS 와의 그래픽 비교)

  • 김성수;한경수
    • The Korean Journal of Applied Statistics
    • /
    • v.6 no.1
    • /
    • pp.1-11
    • /
    • 1993
  • Statistical graphics have been important new tools for data analysis and many statistical softwares are exploiting graphical methods. Among these softwares available in personal computer at low cost, we intriduce S-PLUS(version 2.0). S-PLUS is an interactive graphical data analysis system and object-oriented programming language. SAS/GRAPH is another popular graphical system for displaying data in the form of color plots, charts, maps, and slides on screen and hardcopy devices. S-PLUS is compared to SAS/GRAPH(version 6.04) in viewpoints of statistical graphics.

  • PDF

Suggestions for Sustainable Construction Project Management (지속가능한 건설사업관리를 위한 발전방안)

  • Lee, Seung-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.240-241
    • /
    • 2021
  • For the sustainable development of the domestic construction project management field, each CM company should try to diversify in terms of service contract types and scope of work while having internationally competitive technical and service capabilities as follows. First, from the initiation of the service to the completion, the CMr should be able to establish and execute a plan to create specific outcomes. Second, CMr must have the capability to produce weekly or monthly cost, schedule, risk, and scope management reports. In addition, it should be possible to apply the cost plus sliding fee method or to systematically and continuously accumulate and process data generated during the construction process.

  • PDF