• Title/Summary/Keyword: Cost of Rehabilitation

Search Result 297, Processing Time 0.026 seconds

A Multiple Objective Mixed Integer Programming Model for Sewer Rehabilitation Planning (하수관리 정비 계획 수립을 위한 다중 목적 혼합 정수계획 모형)

  • Lee Yongdae;Kim Sheung Kown;Kim Jaehee;Kim Joonghun
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.05a
    • /
    • pp.660-667
    • /
    • 2003
  • In this study, a Multiple Objective Mixed Integer Programming (MOMIP) Model is developed for sewer rehabilitation planning by considering cost, inflow/infiltration. A sewer rehabilitation planning model is required to decide the economic life of the sewer by considering trade-off between cost and inflow/infiltration. And it is required to find the optimal rehabilitation timing, according to the cost effectiveness of each sewer rehabilitation within the budget. To develop such a model, a multiple objective mixed integer programming model is formulated based on network flow optimization. The network is composed of state nodes and arcs. The state nodes represent the remaining life and the arcs represent the change of the state. The model consider multiple objectives which are cost minimization and minimization of inflow/infiltration. Using the multiple objective optimization, the trade-off between the cost and inflow/infiltration is presented to the planner so that a proper sewer rehabilitation plan can be selected.

  • PDF

Factors Affecting the Cost of Rehabilitation Services for People with Congenital Disabilities (선천성 장애인의 재활서비스 비용에 영향을 미치는 요인)

  • Lee, Hyun-Joo
    • Journal of Industrial Convergence
    • /
    • v.20 no.10
    • /
    • pp.197-207
    • /
    • 2022
  • The purpose of this study is to identify factors that affect the cost of rehabilitation services for people with congenital disabilities. The subjects of this study were 712 persons who had a disability from prenatal life from data of the 2020 National Survey of the Disabled Persons. 19-40 years, middle-class economic status, monthly family income level, use of vouchers, satisfaction with service institutions, autistic disability types significantly contributed to the cost of rehabilitation services. Among them use of vouchers had the greatest influence on the cost of rehabilitation services. Therefore, in order to reduce the cost of rehabilitation services for people with the congenital disabilities, it is suggested to improve the target of the voucher program and to establish a rehabilitation service support system for the entire life span.

Development of Lifetime Assessment and Rehabilitation Cost Calculation Methods for Overseas ROMM Project

  • Hyun, Jung-Seob;Kim, Doo-Young;Hwang, Kwang-Won;Park, Min-Gyu
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.3 no.2
    • /
    • pp.119-125
    • /
    • 2017
  • Regarding the implementation of ROMM project (Rehabilitation, Operation, Maintenance & Management), which is one of overseas development projects, it is very important to diagnose the exact current status of aged thermal power plant. However, when people visit the power plant for the purpose of prediagnosis to implement the ROMM project, most target power plants for diagnosis, in general, are under operation. This can be a big interference factor to diagnose the exact current status of power plants. Therefore, in order to solve such interference factor, based on the 30 years of know-how in the field, the present study has developed a regression curve for a simple life time assessment and the calculation of rehabilitation cost that may be used as a reference relatively for the quantitative diagnosis on the status of a relevant power plant even during the operation of the power plant.

The Study on Correlation between Traffic Accident Severity with Period and Cost of Treatment in Traffic Accident Outpatients Visiting a Korean Medicine Hospital (한방병원에 내원한 교통사고 외래환자에 있어서 사고규모와 치료기간 및 치료비용 간의 상관관계에 대한 연구)

  • Park, Ji-Yong;Hong, Nam-Jung;Lee, Min-Jung;Ahn, Ji-Hoon;Shin, You-Bin;Kim, Byung-Jung;Shin, Min-Geun;Ha, In-Hyuk;Lee, Jin-Ho
    • Journal of Korean Medicine Rehabilitation
    • /
    • v.24 no.1
    • /
    • pp.65-76
    • /
    • 2014
  • Objectives The purpose of this study is to investigate the corelation between traffic accident severity and treatment period and cost by traffic accident. Methods Outpatients who visited Jaseng Korean medicine hospital traffic accident clinic were investigated by hospital computer system about period and cost of treatment. And we requested for repair cost of car, a sort of car groups and agreement date with car insurance company to insurance company. Therefore we could analysis statistical correlation of traffic accident severity (repair cost of car) with period of treatment, cost of treatment, number of treatment in same sort of car groups. For statistics, we used SPSS version 18.0 for windows. Results A significant positive correlation was found between traffic accident severity (repair cost of car) with repair cost of car, cost of treatment and number of treatment in semi-midsize car, midsize car group. But, any significant correlation wasn't found between traffic accident severity (repair cost of car) with repair cost of car, cost of treatment and number of treatment in small car, full-sized car group. In SUV (sport utility vehicle) car group some significant correlation was found, but it isn't between traffic accident severity (repair cost of car) with repair cost of car, cost of treatment and number of treatment. Conclusions It was found that traffic accident severity (repair cost of car) had an effect on cost of car, cost of treatment and number of treatment by statistical analysis. But, it was also suggested strongly that other factors like a cost of car and ages had an effect on them.

Implementing an Application Tool of Life Cycle Cost Analysis (LCCA) for Highway Maintenance and Rehabilitation in California, USA

  • Kim, Changmo;Lee, Eul-Bum
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.376-380
    • /
    • 2015
  • Life-Cycle Cost Analysis (LCCA) for highway projects is known as an effective analytical technique that uses economic principles to evaluate long-term alternative investment options, especially for comparing the values of alternative pavement design structures and construction strategies. In the Unites States, the 2012 Moving Ahead for Progress in the 21st Century Act (MAP-21) amended the United States Code to mandate that the United States Government Accountability Office (GOA) conducts a study of the best practices for calculating life-cycle costs and benefits for the federally funded highway projects in 2013. The RealCost 2.5CA program was developed and adapted as an official LCCA tool to comply with regulatory requirements for California state highway projects in 2013. Utilization of this California-customized LCCA software helps Caltrans to achieve substantial economic benefits (agency cost and road user cost savings) for highway projects. Proper implementation of LCCA for roadway construction and rehabilitation would deliver noticeable savings of agency's roadway maintenance cost especially in developing counties where financial difficulties exist.

  • PDF

Case Studies of the Life Cycle Cost Analysis for Rehabilitation of Deteriorated Expressway Concrete Pavements (고속도로 노후 콘크리트 포장 보강의 경제성 분석 사례 연구)

  • Suh, Young-Chan;Park, Ji-Won;Kim, Chan-Woo
    • International Journal of Highway Engineering
    • /
    • v.18 no.3
    • /
    • pp.33-45
    • /
    • 2016
  • PURPOSES : Concrete pavement has been used in the construction of the Jungbu expressway in 1987. More than 60% of the pavement on the expressway is currently made of concrete, but most has been used far beyond their design life. Pavement life has been extended through routine maintenance or overlay. However, the structural capacity of the pavement has reached its limit, and extensive rehabilitation/reconstruction with long time traffic blocking should be considered. The three following issues on concrete rehabilitation/reconstruction will be discussed: (1) economic comparison of asphalt inlay and asphalt overlay, (2) economic comparison preventive overlay on a section which is currently good and routine overlay on the section which will be poor, and (3) economic analysis of early-strength concrete when it is used in concrete reconstruction. METHODS : First, various life cycle cost analysis tools were compared, and the proper tool for the extensive rehabilitation/reconstruction was selected. Second, a sensitivity analysis of the selected tool was performed to find the influential input variables, which should be carefully selected in the analysis. Third, three case studies, which can be issues in the rehabilitation/reconstruction of the expressway concrete pavement in Korea, were performed. RESULTS : Asphalt overlay without milling the deteriorated concrete showed 18~25% lower life cycle cost than the current asphalt inlay with milling. The good current preventive overlay on the section was economically justified within the scope of this study. The construction cost limit of the early strength concrete was suggested to be economical for 1, 3, and 7 days of construction alternative opening. CONCLUSIONS : CA4PRS was a viable tool for comparing various rehabilitation/reconstruction issue alternatives. Several concrete issues associated with the rehabilitation/reconstruction of the deteriorated concrete pavement were discussed as mentioned above.

A Mathematical Model for Sewer Rehabilitation Planning by Considering Inflow/infiltration (불명수를 고려한 하수관거 정비 계획 수립을 위한 수학 모형)

  • Lee, Yong-Dae;Kim, Sheung-Kown;Kim, Jae-Hee;Kim, Joong-Hun
    • Journal of Korea Water Resources Association
    • /
    • v.36 no.4
    • /
    • pp.547-559
    • /
    • 2003
  • In this study, a mathematical model is developed for sewer rehabilitation planning by considering cost and inflow/infiltration. A sewer rehabilitation planning model is required to decide the economic life of the sewer by considering trade-off between cost and inflow/infiltration. And it is required to find the optimal rehabilitation timing, according to the cost effectiveness of each sewer rehabilitation within the budget. To solve the problem, we formulated a multiple objective mixed integer programming(MOMIP) model based on network flow optimization. The network is composed of state nodes and arcs. The state nodes represent the remaining life and the arcs represent the change of the state. The model considers multiple objectives which are cost minimization and minimization of inflow/infiltration. Using the multiple objective optimization, the trade-off between the cost and inflow/infiltration is presented to the planner so that a proper sewer rehabilitation plan can be selected.

Practical Application of Life-Cycle Cost Effective Design and Rehabilitation of Bridges

  • Cho, HyoNam;Park, KyungHoon;Hwang, YoonGoog;Lee, KwangMin
    • Corrosion Science and Technology
    • /
    • v.3 no.2
    • /
    • pp.72-80
    • /
    • 2004
  • Recently, the demand on the practical application of life-cycle cost effective design and rehabilitation of bridges is rapidly growing in civil engineering practice. However, in spite of impressive progress in the researches on the Life-Cycle Cost (LCC), the most researches have only focused on the theoretical point but did not fully incorporate the critical issues for the practical implementation. Thus, this paper is intended to suggest a systemic integrated approach to the practical application of various LCC methodologies for the design and rehabilitation of bridges, For that purpose, hierarchical definitions of LCC models are presented to categorize the approach of LCC assessment applicable for the practical implementation. And then, an integrated LCC system model is introduced with an emphasis on data uncertainty assessment and user-friendly knowledge-based database for its successful implementation. Finally, in order to demonstrate the LCC effectiveness for design and rehabilitation of real bridge structures, illustrative examples are discussed.

An Analysis of Maintenance Cost of Preventive Optimized-Rehabilitation Area Method in Asphalt Concrete Pavement (예방적 최소단면 보수공법 적용 아스팔트 도로포장의 유지관리 비용분석)

  • Kim, Nak-Seok;Hong, Eun-Cheol
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.4
    • /
    • pp.45-51
    • /
    • 2009
  • The paper presents the economic analysis of optimized-rehabilitation area method considered as one of the preventive maintenance methods in asphalt concrete pavement. The optimized-rehabilitation area was selected based on the analysis of traffic lane characteristics. The main concept of the selected method was to minimize the maintenance cost. The effective width of traffic lane in this method was 70 cm of each wheel path. According to the traffic survey conducted in this research, more than 95% of vehicles passed within the width of each wheel path. The new preventive optimized-rehabilitation area method showed less maintenance cost than the conventional overlay. In addition, traffic congestions and the user cost can be reduced. The research results revealed that the total maintenance cost was reduced by 35% by using the new method compare to the conventional one.

Optimal Life Cycle Cost Design of a Bridge (교량의 생애주기비용 최적설계)

  • Park, Jang-Ho;Shin, Yung-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.6
    • /
    • pp.115-122
    • /
    • 2010
  • The importance of the life cycle cost (LCC) analysis for bridges has been recognized over the last decade. However, it is difficult to predict LCC precisely since the costs occurring throughout the service life of the bridge depend on various parameters such as design, construction, maintenance, and environmental conditions. This paper presents a methodology for the optimal life cycle cost design of a bridge. Total LCC for the service life is calculated as the sum of initial cost, damage cost, maintenance cost, repair and rehabilitation cost, user cost, and disposal cost. The optimization method is applied to design of a bridge structure with minimal cost, in which the objective function is set to LCC and constraints are formulated on the basis of Korean Bridge Design Code. Initial cost is calculated based on standard costs of the Korea Construction Price Index and damage cost on damage probabilities to consider the uncertainty of load and resistance. Repair and rehabilitation cost is determined using load carrying capacity curves and user cost includes traffic operation costs and time delay costs. The optimal life cycle cost design of a bridge is performed and the effects of parameters are investigated.