• Title/Summary/Keyword: Cost item

Search Result 418, Processing Time 0.025 seconds

Computer-Based Testing and Construction of an Item Bank Database for Medical Education in Korea (의학교육에서 컴퓨터바탕검사와 문항은행 데이터베이스 구축)

  • Huh, Sun
    • Korean Medical Education Review
    • /
    • v.16 no.1
    • /
    • pp.11-15
    • /
    • 2014
  • A number of medical schools in Korea have been using computer-based testing (CBT) for evaluating their students' scientific and/or clinical performance since the early 1990s. Introducing CBT to medical education would have several advantages: first, presenting figures and audio-video files of clinical content is simple with CBT, making it possible to evaluate medical students' competency with navigating more realistic clinical situations at minimum cost; second, CBT enables automatic item analysis and score reporting. To establish CBT, constructing an item bank with item parameters such as difficulty or discriminating parameters will be needed. To select more psychometrically sound items, analysis of the items according to item response theory is necessary. CBT has already been introduced in high stakes tests like the United States Medical Licensing Examination and the Medical Council of Canada Qualifying Examination. The National Health Personnel Examination Board in Korea is also planning to introduce a CBT-based version of the National Medical Examination soon. Thus all medical schools in Korea will need to introduce CBT and construct item banks to prepare their students for their licensing examinations and to measure the students' competency more accurately.

The Development of an Product Cost Estimation System at the Product Design Stage (제품 설계 단계에서의 제품 원가 추정 시스템 개발)

  • 한관희;박찬우;이규봉;황태일;김강용
    • Korean Journal of Computational Design and Engineering
    • /
    • v.8 no.2
    • /
    • pp.101-108
    • /
    • 2003
  • Presented in this paper is the development of an product cost estimation system at the product design stage. The efficient cost estimation function at the design stage is essential for the cost reduction activities through the entire product life cycle. For this purpose, it is necessary to establish a systematic working procedure, and to develop information system for managing a great deal of production and product-related data required for the cost estimation. The developed system has the capability of estimating a cost of assembly type products as well as unit-item type products. As proposed system is based on the variant approach, it can be used easily at an early design stage without the need for detail design information. Also, this system is integrated with legacy PDM (Product Data Management) and ERP (Enterprise Resource Planning) system for fast. accurate and easy product cost estimation. The estimated cost includes material cost, overhead cost as well as labor cost.

CONSTRUCTION COST INDEX FOR APPLYING INDEX ADJUSTMENT RATE IN THE ROAD PROJECT

  • Jin-Young Chun;Sungkwon Woo
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1112-1117
    • /
    • 2005
  • Construction cost index is generally used to estimate the new project cost based on past construction data and to adjust contract cost when the price change of various articles and items of expenditure composing the contract occurs. In Korea, it is mostly used for adjustment of construction contract cost due to fluctuation of prices. However index adjustment rate which is used for adjustment of construction contract cost had some problems in calculating cost index of each expenditure item that could not reflect properly the change of construction cost. For supplementing these problems, the research of developing construction cost index has been executed. Through the precedent research, these problems were partially resolved but still remain. Therefore this research proposes method of making cost index that utilizes representative items of labor, material, and equipment by analyzing bill of quantity of road construction, through analysis and comparison of precedent study. By using this method, it is expected to solve problems which were not reflected in precedent studies.

  • PDF

Study on the Improvement of Proposal Works for PPP Project: Focused on Operation and Maintenance Cost (민간투자사업의 제안서 작성 업무 개선에 관한 연구 - 운영관리비 산정 업무를 중심으로 -)

  • Koo, Ja Kyung;Lee, Dong Wook;Shim, Myung Seob;Lee, Tai Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6D
    • /
    • pp.655-662
    • /
    • 2010
  • As the national competitive power indicator, the infrastructures have been constructed with government's SOC budgets. However, even SOC budget is decreased, Public-Private Partnership Project (PPP project) has been introduced to solve demands on extending infrastructures, and among PPP projects, road projects take high portions. This study analyzes the operation & management item of financial model which is connected to the O&M cost and project proposal of previously proposed road project and analyzes the Korea Expressway Co.,'s project cost items and O&M tasks to reflect the characteristics of road projects. Based on results, this study suggests necessity of the O&M cost breakdown structure and the cost calculation standard on each cost item. Also, for the existing task execution tools, O&M cost calculation tool and finance analysis task tool will be integrated, and the system is suggested web-based system. Thus, it is expected that it contributes to the securing overall business values on PPP project and expending profit-base infrastructures.

Cost Analysis and Period Determination in Stepdown Warranty Policy (단계별 보증제도에서의 비용분석 및 보증기간 설정)

  • Kim, Jae-Jung;Jang, Jung-Sun;Kim, Won-Jung
    • Journal of Korean Society for Quality Management
    • /
    • v.20 no.1
    • /
    • pp.39-47
    • /
    • 1992
  • This paper is concerned with cost analysis and determination of warranty period in a stepdown warranty policy. Manufacturer's warranty cost is analyzed for nonrepairable item, where the warranty is assumed to be renewed at any failure within the warranty period. It is shown that from this result in free replacement policy, pro-rata policy and hybrid policy can be easily calculated. The method of determining optimal warranty period is also explored.

  • PDF

An Optimal Algorithm for Repairable-Item Inventory System with Depot Spares (중앙창 재고가 있는 수리가능시스템을 위한 해법)

  • 김종수;신규철
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.24 no.3
    • /
    • pp.1-11
    • /
    • 1999
  • We consider the problem of determining the spare inventory level for a multiechelon repairable-item inventory system. Our model extends the previous results to the system which has an inventory at the central depot as well as bases. We develop an optimal algorithm to find spare inventory leveis, which minimize the total expected cost and simultaneously satisfy a specified minimum service rate. The algorithm is tested using problems of various sizes to verify the efficiency and accuracy.

  • PDF

Design of Reliability Qualification Test Based on Performance Distribution at the Earlier Stage (초기 단계의 성능분포를 활용한 신뢰성 인증시험의 설계)

  • Jeong, Hai-Sung
    • Journal of Applied Reliability
    • /
    • v.12 no.3
    • /
    • pp.131-138
    • /
    • 2012
  • A design of reliability qualification test based on performance distribution is developed. In general, the performance of an item degrades as the time goes by and the failure of an item occurs when the performance degradation reaches the pre-determined critical level. This article considers the reliability qualification test based on a more tightened critical value at the earlier stage to reduce the evaluation testing time and cost. A numerical example is provided to illustrate how to use the developed reliability qualification test.

A Studyon Implementation of TPBS (Transportation-planning Programming Budgeting System) (교통기획예산제도(TPBS) 도입방안에 관한 연구)

  • 김종민
    • Journal of Korean Society of Transportation
    • /
    • v.13 no.1
    • /
    • pp.153-165
    • /
    • 1995
  • The budget management in Korea is one-year budget system which is just following int he steps of last years budget plan. This system towards traditional item-by-item and restriction-centered budget system. The budget distribution without establishing and considering rational policy goals and directions have brought inefficient resource allocations. In order to promote the implementation of transportation planning, there are some alternatives like introduction of top-down planning system preparing for the provincial self-government era. In this study, the most efficient alternatives to promote the existing management system is referring by foreign countries transportation planning examples(BVWP system in Germany). First of all, mid-long term transportation and budget planning should be established and then make decisions of resource availability and allocation. In order to provide ration budget planning, introduction of Transportation Planning Programming Budget System(TPBS) has been judged as one of the method of unifying the sysematic transportation improvement planning and budgeting. All transporation planning and related activites can not be expressed in quantity and due to the limitation of excessive cost of analyzing transportation planning and ranking priority, here after, the continuous study to minimize the evaluation cost and introduction of TPBS should be done.

  • PDF

An Economic Design of a Screening and Process Monitoring Procedure for a Normal Model (정규모형하에서의 선별검사 및 공정감시 절차의 경제적 설계)

  • Kwon, Hyuck-Moo;Hong, Sung-Hoon;Lee, Min-Koo;Kim, Sang-Boo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.26 no.3
    • /
    • pp.200-205
    • /
    • 2000
  • An economic process monitoring procedure is presented using a surrogate variable for the case where performance variable is dichotomous. Every item is inspected with a surrogate variable and determined whether it should be accepted or rejected. When an item is rejected, the previous number of consecutively accepted items is compared with a predetermined number r to decide whether there is a shift in fraction nonconforming or not. The conditional distribution of the surrogate variable given the performance variable is assumed to be normal. A cost model is constructed which includes costs of inspection, misclassification, illegal signal, undetected out-of-control state, and correction. Methods of finding the optimum number r and screening limit are provided. Numerical studies on the effects of cost coefficients are also performed.

  • PDF

Item Replacement Policy with Minimal Repair in Stepdown Warranty Model

  • Jae Joong, Kim;Won Joong, Kim
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.18 no.33
    • /
    • pp.87-92
    • /
    • 1995
  • This paper proposes age replacement policy in stepdown warranty policy. The replacement policy is considered in case of minimally repairable items. And renewal theory is used in analyzing warranty costs. The expected cost per unit time is presented in stepdown warranty policy, free replacement, prorata and hybrid policy. In this article it is assumed that item is replaced at the age of T but the any failure is minimally repaired before the age T. At this point the expected cost per unit time is shown in customer's view point. And numerical example is explored in weibull time-to-failure distribution.

  • PDF