• Title/Summary/Keyword: Cost information

Search Result 11,007, Processing Time 0.04 seconds

On Multipurpose Replacement Policies for the General Failure Model

  • Cha, Ji-Hwan
    • Journal of the Korean Data and Information Science Society
    • /
    • v.14 no.2
    • /
    • pp.393-403
    • /
    • 2003
  • In this paper, various replacement policies for the general failure model are considered. There are two types of failure in the general failure model. One is Type I failure (minor failure) which can be removed by a minimal repair and the other is Type II failure (catastrophic failure) which can be removed only by a complete repair. In this model, when the unit fails at its age t, Type I failure occurs with probability 1-p(t) and Type II failure occurs with probability p(t), $0{\leq}p(t){\leq}1$. Under the model, optimal replacement policies for the long-run average cost rate and the limiting efficiency are considered. Also taking the cost and the efficiency into consideration at the same time, the properties of the optimal policies under the Cost-Priority-Criterion and the Efficiency-Priority-Criterion are obtained.

  • PDF

Extended Workflow Model considering Activity Based Costing (활동기준원가를 고려한 확장 워크플로우 모델)

  • Hwang, Mun-Tae;Park, Jong-Gyeong;Sim, Eok-Su;Park, Jin-U
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2005.05a
    • /
    • pp.112-118
    • /
    • 2005
  • Workflow is a collection of tasks organized to accomplish some business processes. It also defines the order of task invocation or conditions under which task must be invoked, task synchronization, and information flow. And activity based costing(ABC) provides accurate cost information for decision making. In ABC systems, costs must be separable into cost pools each of which corresponding to a single cost driver. These two systems are closely related to each other. But recent research deals with workflows and ABC systems separately. Thus, this research proposes an extended workflow model which is expressed cost information using activity based costing.

  • PDF

Scheduling of Production Process with Setup Cost depending Job Sequence (작업순서에 따라 달라지는 준비 비용을 갖는 PCB 생산 공정의 일정계획)

  • Yu, Sungyeol
    • Management & Information Systems Review
    • /
    • v.34 no.2
    • /
    • pp.67-78
    • /
    • 2015
  • In this paper, we consider a scheduling problem of printed circuit board production process with setup cost depending job sequence. Given a set of PCBs, these are produced in single surface mounting device. The problem is to define job sequence with the objective of minimizing the total seutp cost. We propose a mathematical formulation and the problem is proven to be NP-hard. So, a meta heuristic based on genetic algorithm is developed.

  • PDF

A development of map building sensor system for mobile robot using low cost photo sensor

  • Hyun, Woong-Keun
    • Journal of information and communication convergence engineering
    • /
    • v.7 no.3
    • /
    • pp.281-285
    • /
    • 2009
  • Mobile robot has various sensors for describing the external world. The ultrasonic sensor widely applied to the most mobile robot to detect the obstacle and environment owing to low cost, its easy to use. However, ultrasonic sensor has major problems: the uncertainty information of sensor, false readings caused by specular reflection, multi path effect, low angular resolution and sensitivity to changes in temperature and humidity. This paper describes a sensor system for map building of mobile robot. It was made of low cost PSD (Position Sensitive Detector) sensor array and high speed RISC MPU. PSD sensor is cost effective and light weighting but its output signal has many noises. We propose heuristic S/W filter to effectively remove these noises. The developed map building sensor system was equipped on a mobile robot and was compared with ultrasonic sensor through field test.

Efficient Implementations of a Delay-Constrained Least-Cost Multicast Algorithm

  • Feng, Gang;Makki, Kia;Pissinou, Niki
    • Journal of Communications and Networks
    • /
    • v.4 no.3
    • /
    • pp.246-255
    • /
    • 2002
  • Constrained minimum Steiner tree (CMST) problem is a key issue in multicast routing with quality of service (QoS) support. Bounded shortest path algorithm (BSMA) has been recognized as one of the best algorithms for the CMST problem due to its excellent cost performance. This algorithm starts with a minimumdelay tree, and then iteratively uses a -shortest-path (KSP) algorithm to search for a better path to replace a “superedge” in the existing tree, and consequently reduces the cost of the tree. The major drawback of BSMA is its high time complexity because of the use of the KSP algorithm. For this reason, we investigate in this paper the possibility of more efficient implementations of BSMA by using different methods to locate the target path for replacing a superedge. Our experimental results indicate that our methods can significantly reduce the time complexity of BSMA without deteriorating the cost performance.

An Analysis on the Strategic Behaviors of the Bilaterally Monopolistic Firms under Uncertain Information

  • Jun, Iksu
    • Journal of agriculture & life science
    • /
    • v.46 no.6
    • /
    • pp.185-195
    • /
    • 2012
  • The purpose of this paper is to analyze how strategically the bilaterally monopolistic firms, only-one-seller and only-one-buyer, behave in a situation in which each firm has uncertain information on its opponent firm's cost. Even though the two firms know that seeking integrated profit leads to the optimized profit for both firms, each firm has an incentive to opportunistically behave to increase its share of the integrated profit. These opportunistic behaviors of the firms are analyzed through a game theoretic approach especially finding Nash equilibrium mixed strategies for the strategic profiles such as true-report or not and monitoring or not. The comparative statics to the Nash equilibrium mixed strategies shows that as the profit share increases the probability of monitoring an opponent firm is decreased while the probability increases as the size of the overstated production cost increases. This study also shows that high penalty and low monitoring cost lead to high probability to tell the truth of the production cost.

Automated Methodology for Linking BIM Objects with Cost and Schedule Information by utilizing Geometry Breakdown Structure (GBS)

  • Lee, Kwangjin;Jung, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.637-638
    • /
    • 2015
  • There has been growing interests in life-cycle project management in the construction industry. A lot of attention is given to Building Information Modeling (BIM) which stores and uses a variety of construction information for the life cycle of project management. However, due to the additional workload arising from BIM, its expected effects versus its input costs are still under discussion in practice. As an attempt to address this issue, one of previous studies suggested an automated linking process by developing Standard Classification Numbering System (SCNS) and Geometry Breakdown Structure (GBS) to enhance the efficiency of integration process of BIM objects, cost, and schedule. Though SCNS and GBS facilitates identifying all different dataset, making object sets and linking schedule activities still needs to be manually done without having an automated tool. In this context, the purpose of this paper is to develop and validate a fully automated integration system for 3D-objects, cost, and schedule. A prototype system for single family homes (Hanok) was developed and tested in order to verify its efficiency.

  • PDF

A Study on Proper Acquisition Cost Estimation Using the PRICE Model (PRICE모델을 이용한 적정 획득비용 추정 방안)

  • 한현진;강성진
    • Journal of the military operations research society of Korea
    • /
    • v.27 no.1
    • /
    • pp.10-27
    • /
    • 2001
  • This paper deals with the application of PRICE model in estimating the proper acquisition cost for weapon budgeting phase. The PRICE(Parametric Review of Information for Costing and Evaluation) Hardware model is a computerized method for deriving cost estimates of electronic and mechanical hardware assemblies and systems. The model can be used in obtaining not only initial cost estimates in conceptual phase, but also detailed cost estimates in budgeting phase depending on available historical and empirical data. We analyzed first step cost estimate parameters and derived cost equations using PRICe output dta. Using weight and complexity, We can find cost variation. Sensitivity analysis shows that cost increases exponentially as complexity increases exponentially as complexity increases. We estimated KAAV\`s (Korea Amphibious Assault Vehicle) production cost using the PRICE model and compare with engineering cost estimates which is based on actual production data submitted by the production company. The result shows that tow estimates are close within $\pm2%$ differences.

  • PDF

A Handover Management Scheme Based on User-Preferences and Network-Centric Approach

  • Khan, Murad;Park, Gisu;Cho, Wooseong;Seong, Gihyuk;Han, Kijun
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.9 no.1
    • /
    • pp.344-357
    • /
    • 2015
  • With the increase in a number of access technologies and data rates, a continuous connection among different networks is demand of the future wireless networks. In the last decade, user connectivity among different access networks remained a challenging job. Therefore, in this article, we proposed a user-centric and user-perspective based network selection mechanism for fast handover management in heterogeneous wireless networks. The proposed scheme selects the most appropriate network among available networks on the basis of resources i.e. cost, data rate, and link quality. Initially, we load the Media Independent Information Service (MIIS) with the information of cost and data rate provided by different network operators. Similarly, Mobile Node (MN) is also loaded with the user preferred cost and data rate for different applications. The MN obtains the information of cost and data rate from MIIS server upon a predefined threshold, and make a decision for handover according to its current cost and data rate. Furthermore, we employ an optimal threshold mechanism for initiation of the handover execution phase to minimize false handover indications. The proposed scheme is based on a survey for network selection and its implementation in C programming language to validate its performance and accuracy. The simulation result shows that the proposed scheme performs superior then the schemes present in the current literature.

Development of Cost-Benefit Analysis Model for GIS Projects (GIS사업의 비용편익분석 모형개발)

  • Kim, Jung-Ok;Heo, Yong;Yu, Ki-Yun
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.12 no.1 s.28
    • /
    • pp.79-85
    • /
    • 2004
  • The GIS(Geographic Information System) projects require big initial investment and cost of maintenance. Decision makers would not launch GIS projects unless they are convinced of the benefits of the projects. Therefore the purpose of this paper is to develop an appropriate model for GIS project evaluation. We proposed a GIS project evaluation model and summarize the steps involved in Cost-Benefit Analysis(CBA). The costs of a GIS implementation include hardware and software cost, costs of database development, training expenses, annual maintenance expenses, and other annual expenses. The benefit by using GIS has been assessed into Type I(direct benefits), Type II(indirect benefits), Type III(benefits that result from the sale of information services), Type IV(intangible benefits).

  • PDF