Prediction of UDPSC Bridge's Maintanence Cost based on Life Cycle Cost Analysis (LCC 분석에 기초한 UDPSC 교량의 유지관리비 예측에 관한 연구)

  • Shim, Bo-Hyun;Lee, Heung-Chol;Woo, Sung-Kwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.638-641
    • /
    • 2006
  • In this paper, A calculating cost method of maintenance and repair for bridge which is built up by new construction technique named Up-Down Precast Concrete(UDPSC). After 2000, 109 Bridges which are using UDPSC technique have been built up, 37 bridges's construction work are processing, and 194 designs are presented for construction. Because this technology has developed recently, there are few field data for analyzing the maintenance and repair cost. Therefore, the maintenance and repair cost is computed using Construction and Transportation Ministry's guide line for computation and former research's data.

  • PDF

Life Cycle Cost Analysis of Auxiliary Power Unit Developments for 8200 Series Electric Locomotive Based on Reliability (8200호대 전기기관차 보조전원장치 개발품의 신뢰도 기반 수명주기비용 분석)

  • Lee, Kye-Seung;Kim, Wan-il;Chang, Yoon-Woo;Kim, Jae-Moon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.11
    • /
    • pp.1523-1529
    • /
    • 2018
  • Electric vehicles that are currently in operation are being produced domestically. Therefore, there is no great difficulty in receiving or repairing the failed parts or in the overall repair. On the other hand, most of the electric locomotives are manufactured by introducing the parts and technology of foreign vehicle manufacturers. In this paper, conducted a study about life cycle cost analysis of developed auxiliary power unit in 8200 series electric locomotive and suggested cost down method. This confirms the economic benefits of the developed products of the auxiliary power supply compared to the existing products. In addition, a sensitivity analysis of MTBF was conducted to suggest a life cycle cost down method.

Load Carrying Capacity of Top Down Prefounded Columns on Different Excavation Schedule (굴착순서에 따른 Top Down 선기둥 지지력 산정)

  • Rhim, Hong-Chul;Hwang, Hee-Sun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.4 s.22
    • /
    • pp.45-52
    • /
    • 2006
  • Top Down method is more widely used in downtown construction, recently. As underground construction constitutes a significant portion of the total construction cost and time in Top Down construction, it is important to develop a construction method to reduce the time required in underground works. The purpose of this study is to analyze load carrying capacity of Top Down prefounded columns on different excavation schedule. When several floors are excavated, the valid buckling length of prefounded column is increased and allowable buckling stress is decreased. The result shows that all columns are safe in buckling down to B3 story whether 2 or 3 stories are excavated. However, several columns are not safe from B4 story when 2 or 3 stories are excavated straightly. With these results, a process can be designed that the first three stories in the basement are excavated, and then excavate B4 story after placing concrete on B1 and B2 floor.

Development of Up-Down Turnout System of AGT for Reduction of Construction costs (건설비 절감을 위한 고무차륜 경량전철 상하식분기기 개발)

  • Cha, Kwon-Jung;Yoon, Il-Ro;Kim, Dong-Howal;Fukumoto, Yozo
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.745-752
    • /
    • 2011
  • Light Rail Vehicle(LRT) is "New Transit System" that has transportation capacity as well as physical size of vehicle is in-between bus and subway. The demand of LRT system is increasing rapidly; both domestically and internationally. Reason being is that it is more economical and eco-friendly compare to existing heavy rail vehicle. Especially, Busan Subway Line 4 K-AGT (Rubber-tired LRT) being the first of its kind to start revenue service in Korea, it is very much likely that application of its demand will continue to increase. Considering its trend, study to reduce implementation cost of LRT is being pursued in many different aspects; reducing construction cost is one that aspect. In this study, on-site application of 'Up-Down Turnout System' implementation research has been carried out which can replace existing 'Left-Right Turnout System'. When safety of its type gets verified, application of this system to line which intends to use K-AGT, Shin-Lim Line and Dong-Book Line, expects to save its construction cost. This thesis paper reports ongoing research of AGT 'Up-Down Turnout System' development and main component design factors, fundamental principle, performance test result.

  • PDF

Power Factor Correction Circuit For Inverter Air-Conditioner With A Parallel Configuration To Reduce The Material Cost (재료비 절감을 위한 병렬구조를 갖는 인버터 에어컨용 역률제어회로)

  • 정용채;정윤철;권경안
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.4 no.2
    • /
    • pp.122-127
    • /
    • 1999
  • In this paper, the power factor correction circuit using a parallel drive method is proposed so that the high power inverter air-conditioner with 3[hp] compressor motor may obtain the cost down and the improved performance. The adequate design porcedures are presented to reduce the material costs by eliminating the power factor imprving LC filter and derating output capacitor and inverter switches. Using the determined components. the proto-type circuit with 6[kW] power consumption is built and tested to verify the operation of the proposed circuit.

  • PDF

A Study on the Application of Maintenance for Rolling Stock (철도차량 유지보수 적용방향에 관한 연구)

  • Lee, Kang-Sung;Sohn, Woong;Kang, Chan-Yong
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1655-1660
    • /
    • 2009
  • At the Rolling-stock, most important thing is thorough maintenance for safety as a mass transit. Recently, many studies of cost down method and acquisition of high reliability have being progressed with considering of safety. Maintenance cost is closely relative to the preventive maintenance. But generally the preventive maintenance is decided in compliance with an experience. So the study of cost down method at the preventive maintenance is difficult. In this study, many results of effectiveness and optimization for the preventive maintenance are checked. Then., it is possible that efficiency preventive maintenance method will be able to suggest.

  • PDF

Total Cost of Ownership Perspective Asset Investment Efficiency Analysis (총 소유 비용 관점의 자산 투자 효율성 분석)

  • Kim, Chang-Ho;Jang, Dai-Hyun;Rhee, Yang-Won
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2013.10a
    • /
    • pp.261-262
    • /
    • 2013
  • In this paper, we subject to MA area to identifying improve the performance of equipment and prices down. When we replace the equipment, the cost savings available area, servers, storage, the As-is vs To-be of software compared to the cost. Thus, based decision-making is utilized.

  • PDF

The Strategic Management for Innovation and Competition of Small and Medium Firms (중소기업 기술.경영혁신과 경쟁력우위를 위한 전략경영 -원가절감과 매출액 증대를 중심으로-)

  • Choi Seong-Wook
    • Management & Information Systems Review
    • /
    • v.7
    • /
    • pp.169-186
    • /
    • 2001
  • The strategic management for Innovation and competetion of small and medium firms is practical innovation strategic of cost down and sales increace. Framework of the strategic management for thr forecast of changed industry and formal competetion. Practice and planning to the small and medium firms for innovation, cost down, sales increace, revolution management, etc. The results of study are as follows ; 1) study of pre-model for innovation and competetive advantage. 2) Draw of the creative factor for industrial structure analysis, cost advantage analysis and competetive advantage. 3) Exhibit of the practice model for strategic management approach. 4) Application and modification to the small and medium firms for results of study.

  • PDF

Rectified TPM Activities in the Depression Period (저성장기의 TPM 활동 방향 전환 -COST 절감을 위한 생산혁신 활동 방향-)

  • 유정상;최진욱
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.46
    • /
    • pp.93-101
    • /
    • 1998
  • A great number of firms have used overall equipments effectiveness index to evaluate the effect of TPM activities. Overall equipments effectiveness is very useful index to emphasize the need of decreasing equipments loss time when TPM system is first implemented. And it is powerful to evaluate prductivity growth rate according to TPM activities when GNP growth rate is high level. However, during the depression period, the increase of overall equipments effectiveness does not contribute fully to the cost down, the reason is that demand is falling. In this paper, we present the rectified TPM activities which can be applied to the depression period, and analysis the improvement activities of production part how to contribute to the cost down,

  • PDF

Opened Slab Based on Top-Down Method (개방형 슬래브를 이용한 지하 역타공법)

  • Jeon, Keum-Seok;Goh, Soo-Jin;Yom, Kyong-Soo;Rhim, Hong-Chul;Choi, Lin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.9-12
    • /
    • 2006
  • In recent years, construction site has developed lots of new methods and materials for Time-Cost Trade-off and improving constructability. In the case of underground construction, especially, there are many restrictions and difficulties. Shortening of the construction time in construction of underground, we use top-down method in undergroud wall. A open slab has been designed for the purpose of overcoming a weak point of former top-down method. This study based on open slab on the under ground top-down method, to more improve constructability, to introduce the effect and the performance of top-down method.

  • PDF