• Title/Summary/Keyword: Cost approach

Search Result 3,245, Processing Time 0.027 seconds

Credit Score Modelling in A Two-Phase Mathematical Programming (두 단계 수리계획 접근법에 의한 신용평점 모델)

  • Sung Chang Sup;Lee Sung Wook
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2002.05a
    • /
    • pp.1044-1051
    • /
    • 2002
  • This paper proposes a two-phase mathematical programming approach by considering classification gap to solve the proposed credit scoring problem so as to complement any theoretical shortcomings. Specifically, by using the linear programming (LP) approach, phase 1 is to make the associated decisions such as issuing grant of credit or denial of credit to applicants. or to seek any additional information before making the final decision. Phase 2 is to find a cut-off value, which minimizes any misclassification penalty (cost) to be incurred due to granting credit to 'bad' loan applicant or denying credit to 'good' loan applicant by using the mixed-integer programming (MIP) approach. This approach is expected to and appropriate classification scores and a cut-off value with respect to deviation and misclassification cost, respectively. Statistical discriminant analysis methods have been commonly considered to deal with classification problems for credit scoring. In recent years, much theoretical research has focused on the application of mathematical programming techniques to the discriminant problems. It has been reported that mathematical programming techniques could outperform statistical discriminant techniques in some applications, while mathematical programming techniques may suffer from some theoretical shortcomings. The performance of the proposed two-phase approach is evaluated in this paper with line data and loan applicants data, by comparing with three other approaches including Fisher's linear discriminant function, logistic regression and some other existing mathematical programming approaches, which are considered as the performance benchmarks. The evaluation results show that the proposed two-phase mathematical programming approach outperforms the aforementioned statistical approaches. In some cases, two-phase mathematical programming approach marginally outperforms both the statistical approaches and the other existing mathematical programming approaches.

  • PDF

Multi-product Lot Quantity Verification: A Weighing Inspection Approach (다제품 로트 수량 확인법 : 무게 검사 방법)

  • Shin, Wan-Seon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.19 no.4
    • /
    • pp.115-123
    • /
    • 1993
  • This paper presents an alternative inspection method for counting items of a lot(or kit) in production lines or distribution centers. In this inspection, lots are weighed instead of counting all items of the lots in order to reduce the effort required for the 100% manual counting inspection. Inspection errors of this inspection procedure are analyzed and the impact of the variability of item weights on inspection errors are investigated. Two approaches, the cost assessment approach and the bicriterion decision making approach, are presented for the implementation of this inspection procedure.

  • PDF

Reliability-Based Topology Optimization Using Single-Loop Single-Vector Approach (단일루프 단일벡터 방법을 이용한 신뢰성기반 위상최적설계)

  • Bang Seung-Hyun;Min Seung-Jae
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.30 no.8 s.251
    • /
    • pp.889-896
    • /
    • 2006
  • The concept of reliability has been applied to the topology optimization based on a reliability index approach or a performance measure approach. Since these approaches, called double-loop single vector approach, require the nested optimization problem to obtain the most probable point in the probabilistic design domain, the time for the entire process makes the practical use infeasible. In this work, new reliability-based topology optimization method is proposed by utilizing single-loop single-vector approach, which approximates searching the most probable point analytically, to reduce the time cost. The results of design examples show that the proposed method provides efficiency curtailing the time for the optimization process and accuracy satisfying the specified reliability.

Damage Risk Based Approach for Retrofit Prioritization of Bridges (기존 교량구조물의 내진보강을 위한 우선순위 결정방법)

  • 이상우;김상효;마호성
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2003.09a
    • /
    • pp.295-302
    • /
    • 2003
  • A quantitative approach for the retrofit prioritization of bridges is developed based on the damage risk of seismic vulnerable components. In the developed approach, seismic damage risk is estimated in the probabilistic perspectives with an analytical bridge model, which can consider various phenomena found in the seismic behaviors of girder-type bridges and damage models of various vulnerable components. Based on the total cost due to failure of structural components, weighting factors are proposed. Finally, the ranking index and retrofit priority of bridges are estimated from the overall damage risk and weighting factors of bridges. As a result, the retrofit priority of four PSC girder bridges is evaluated by using the proposed approach. The vulnerable components in need of seismic retrofit are selected accordingly. From simulated results, the validity of the proposed approach is verified by comparison with the existing approach. In addition, the proposed approach is found to be appropriate in evaluating the priority of existing bridges.

  • PDF

Analytical Approach of Multicasting-supported Inter-Domain Mobility Management in Sensor-based Fast Proxy Mobile IPv6 Networks

  • Jang, Ha-Na;Jeong, Jong-Pil
    • International journal of advanced smart convergence
    • /
    • v.1 no.2
    • /
    • pp.1-11
    • /
    • 2012
  • IP-based Wireless Sensor Networks (IP-WSNs) are gaining importance for their broad range of applications in health care, home automation, environmental monitoring, industrial control, vehicle telematics, and agricultural monitoring. In all these applications, a fundamental issue is the mobility in the sensor network, particularly with regards to energy efficiency. Because of the energy inefficiency of network-based mobility management protocols, they can be supported via IP-WSNs. In this paper, we propose a network-based mobility-supported IP-WSN protocol called mSFP, or the mSFP: "Multicasting-supported Inter-Domain Mobility Management Scheme in Sensor-based Fast Proxy Mobile IPv6 Networks". Based on [8,20], we present its network architecture and evaluate its performance by considering the signaling and mobility cost. Our analysis shows that the proposed scheme reduces the signaling cost, total cost, and mobility cost. With respect to the number of IP-WSN nodes, the proposed scheme reduces the signaling cost by 7% and the total cost by 3%. With respect to the number of hops, the proposed scheme reduces the signaling cost by 6.9%, the total cost by 2.5%, and the mobility cost by 1.5%. With respect to the number of IP-WSN nodes, the proposed scheme reduces the mobility cost by 1.6%.

The Effects of Cost Stickiness on Real Earnings Management: A Data Analysis of Export Marketers

  • Oh, Yu-Gyeom;Kim, Moon-Hong
    • Asia-Pacific Journal of Business
    • /
    • v.13 no.3
    • /
    • pp.93-118
    • /
    • 2022
  • Purpose - Export marketers may have incentives to attempt real earnings management to avoid low reported earnings. Therefore, we attempted to verify the relationship between cost stickiness and real earnings management in the context of export marketing. Design/methodology/approach - Data were collected from exporters that settle-accounts in December excluding financial businesses listed on the stock market from 2015 to 2019. Multiple regression analysis were employed to analyze the data. Findings - The results showed that there is a negative relationship between cost stickiness and real earnings management. In addition, the results showed that export marketers little attempt to offset the cost inefficiency caused by the increase in expense because of cost stickiness with opportunistic management activities through real earnings management. Rather, as the level of real earnings management appears lower, exporters showing cost stickiness are expected to report management performance based on actual marketing. Furthermore, exporters with a high level of managerial centrality or high managerial overconfidence little attempt to offset cost inefficiency caused by cost stickiness with real earnings management activities. Research implications or Originality - Our study is the first to investigate the quality of earnings information of exporters with cost stickiness. Based on the results, we suggested efficient marketing strategies for exporters.

Construction Cost Segregation Process using Building Information Modeling

  • Zhou, Rong;Li, Huimin;Zhang, Chengyi;Lv, Lelin;Tian, Junrui;Cakir, Sevilay Demirkesen
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1106-1113
    • /
    • 2022
  • Cost segregation helps reduce tax liabilities by reclassifying real property to personal property and accelerates tax depreciation of a property. A typical cost segregation study requires much time and high costs. This study proposed a BIM integrated cost segregation process that can be applied to any commercial building project. The proposed BIM-based cost segregation process was verified in a new commercial construction project. It approved that this approach can: (1) increase the cash flow for the owner and provide assistance to tax-paying enterprises; (2) enable the contractor to use it as an added value in the bidding process; (3) realize data sharing in a common platform to improve the cost segregation study efficiency and reduce costs and errors; (4) contribute to the asset management in the life cycle of buildings while filling in the blank of cost segregation process. Future studies will focus on the automation of cost segregation and asset management in building construction's life cycle.

  • PDF

A Modified EGEAS Model with Avoided Cost and the Optimization of Generation Expansion Plan (회피비용을 고려한 EGEAS 모형 개발과 전원개발계획의 최적화)

  • 이재관;홍성의
    • Korean Management Science Review
    • /
    • v.17 no.1
    • /
    • pp.117-134
    • /
    • 2000
  • Pubilc utility industries including the electric utility industry are facing a new stream of privatization com-petition with the private sector and deregulation. The necewssity to solve now and in the future power supply and demand problems has been increasing through the sophisticated generation expansion plan(GEP) approach con-sidering not only KEPCo's supply-side resources but also outside resources such as non-utility generation(NUG) demand-side management (DSM). Under the environmental situation in the current electric utility industry a new approach is needed to acquire multiple resources competitively. This study presents the development of a modified electric generation expansion analysis system(EGEAS) model with avoided cost based on the existing EGEAS model which is a dynamic program to develope an optimal generation expansion plan for the electric utility. We are trying to find optimal GEP in Korea's case using our modified model and observe the difference for the level of reliabilities such as the reserve margin(RM) loss of load probability(LOLP) and expected unserved energy percent(EUEP) between the existing EGEAS model and our model. In addition we are trying to calculate avoided cost for NUG resources which is a criterion to evaluate herem and test possibility of connection calculation of avoided cost with GEP implementation using our modified model. The results of our case study are as follows. First we were able to find that the generation expansion plan and reliability measures were largely influenced by capacity size and loading status of NUG resources, Second we were able to find that avoided cost which are criteria to evaluate NUG resources could be calculated by using our modified EGEAS model with avoided cost. We also note that avoided costs were calculated by our model in connection with generation expansion plans.

  • PDF

A Model for Software Maintenance Cost Estimation based on Productivity (생산성 기반의 소프트웨어 유지보수 대가산정 모델)

  • Bae, Joon-Soo
    • IE interfaces
    • /
    • v.17 no.spc
    • /
    • pp.122-130
    • /
    • 2004
  • Since the cost of software maintenance occupies about 50~75% in a general successful organization, the software maintenance plays an important role in software life cycle. In particular, if the managed system needs to be operated in a long term or the system is very large and complex, then the maintenance is especially more important. Software maintenance is defined as software modification activities after customer delivery, such as improvement of performance or functionality, error correction, adaptation to environmental changes, etc. In this paper, software cost estimation models are proposed, that is based on productivity of manpower in maintenance projects. In order to do this, the activities of maintenance are classified into function change, non-function change, user support and application operation. The proposed models are constructed and verified based on the real size and cost information of projects in the real world. The approach in this paper is to discriminate the heterogeneous activities in maintenance projects, and then to calculate the respective cost of each discriminated activity. By using the proposed models, the total cost of maintenance project is summed from the costs of four activities. In addition the number of conflicts between owner and order receiver about the amount of cost will be reduced and the reasonable cost estimation system will be established.

An Estimation Model of Historical Cost Using BIM Library for Road Project (도로분야 BIM 라이브러리를 활용한 실적공사비 산정모델 구축)

  • Moon, HyounSeok;Ju, KiBeom
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.4
    • /
    • pp.431-442
    • /
    • 2015
  • Currently, a BIM-based quantity takeoff (QTO) system is mainly focused on architectural projects. To perform this, diverse quantity takeoff methods such as an object-based automatic quantity takeoff, manual quantity and base functions of calculation have widely been utilizing. However, since BIM library for road projects includes structural elements associated with alignment, it is necessary to establish cost estimation system interlocked with historical cost using 3D library by each unit length. Accordingly, the aim of this study is to develop cost estimation model with using a historical cost approach so that it can be utilized in construction planning based on the BIM library for road projects. For this, based on the BIM library for road, the standardized quantity is estimated, and a process for calculating historical cost and a verification model with a 5D simulation was developed by mapping a WBS code with each BIM library object. This can be applied during the approximate cost estimation process in a project planning and an initial design phase for road projects. Besides, it is expected that these results will be utilized in constructing an optimal historical cost estimation process for project libraries.