• 제목/요약/키워드: Cost Prediction Model

검색결과 480건 처리시간 0.023초

Support Vector Machine을 이용한 초기 소프트웨어 품질 예측 (Early Software Quality Prediction Using Support Vector Machine)

  • 홍의석
    • 한국IT서비스학회지
    • /
    • 제10권2호
    • /
    • pp.235-245
    • /
    • 2011
  • Early criticality prediction models that determine whether a design entity is fault-prone or not are becoming more and more important as software development projects are getting larger. Effective predictions can reduce the system development cost and improve software quality by identifying trouble-spots at early phases and proper allocation of effort and resources. Many prediction models have been proposed using statistical and machine learning methods. This paper builds a prediction model using Support Vector Machine(SVM) which is one of the most popular modern classification methods and compares its prediction performance with a well-known prediction model, BackPropagation neural network Model(BPM). SVM is known to generalize well even in high dimensional spaces under small training data conditions. In prediction performance evaluation experiments, dimensionality reduction techniques for data set are not used because the dimension of input data is too small. Experimental results show that the prediction performance of SVM model is slightly better than that of BPM and polynomial kernel function achieves better performance than other SVM kernel functions.

사례기반추론 기법을 이용한 교량 공사비 추론 모형 구축 (Development of an Approximate Cost Estimating Model for Bridge Construction Project using CBR Method)

  • 김민지;문현석;강인석
    • 한국건설관리학회논문집
    • /
    • 제14권3호
    • /
    • pp.42-52
    • /
    • 2013
  • 본 연구는 기존의 선형적인 공사비 예측방법의 한계를 극복하고 사례기반추론 (Case Based Reasoning, CBR)기법을 통해 기획단계의 실적정보를 활용하여 신뢰도 높은 공사비 예측 모델을 제시하는 것이 목적이다. 이를 위하여 사례기반추론 기법과 유전자알고리즘 (Genetic Algorithm, GA)의 선택연산을 복합적으로 활용한 스프레드시트 기반의 교량공사비 추론모델을 제시하였다. 추론모델의 검증을 위하여 국내 교량공사 시공사례 4건을 적용하였으며, 적용 결과 평균 8.69%의 오차율로 나타나 교량공사비의 예측 정확도가 타 분석방법과 비교하여 상대적으로 높은 것으로 파악하였다. 연구에서 제시된 교량공사비 예측모델은 초기 설계단계에서 상세제원에 대한 정보를 획득할 수 없을 경우에, 교량의 대표적 제원정보 만으로 공사비 선택범위를 최소화된 오차율로 예측할 수 있으므로, 개선된 보정 방법으로서 교량공사의 합리적인 개략공사비 산정에 활용될 수 있을 것으로 판단된다.

비대칭 오류 비용을 고려한 XGBoost 기반 재범 예측 모델 (A Recidivism Prediction Model Based on XGBoost Considering Asymmetric Error Costs)

  • 원하람;심재승;안현철
    • 지능정보연구
    • /
    • 제25권1호
    • /
    • pp.127-137
    • /
    • 2019
  • 재범예측은 70년대 이전부터 전문가들에 의해서 꾸준히 연구되어온 분야지만, 최근 재범에 의한 범죄가 꾸준히 증가하면서 재범예측의 중요성이 커지고 있다. 특히 미국과 캐나다에서 재판이나 가석방심사 시 재범 위험 평가 보고서를 결정적인 기준으로 채택하게 된 90년대를 기점으로 재범예측에 관한 연구가 활발해졌으며, 비슷한 시기에 국내에서도 재범요인에 관한 실증적인 연구가 시작되었다. 지금까지 대부분의 재범예측 연구는 재범요인 분석이나 재범예측의 정확성을 높이는 연구에 집중된 경향을 보이고 있다. 그러나 재범 예측에는 비대칭 오류 비용 구조가 있기 때문에 경우에 따라 예측 정확도를 최대화함과 동시에 예측 오분류 비용을 최소화하는 연구도 중요한 의미를 가진다. 일반적으로 재범을 저지르지 않을 사람을 재범을 저지를 것으로 오분류하는 비용은 재범을 저지를 사람을 재범을 저지르지 않을 것으로 오분류하는 비용보다 낮다. 전자는 추가적인 감시 비용만 증가되는 반면, 후자는 범죄 발생에 따른 막대한 사회적, 경제적 비용을 야기하기 때문이다. 이러한 비대칭비용에 따른 비용 경제성을 반영하여, 본 연구에서 비대칭 오류 비용을 고려한 XGBoost 기반 재범 예측모델을 제안한다. 모델의 첫 단계에서 최근 데이터 마이닝 분야에서 높은 성능으로 각광받고 있는 앙상블 기법, XGBoost를 적용하였고, XGBoost의 결과를 로지스틱 회귀 분석(Logistic Regression Analysis), 의사결정나무(Decision Trees), 인공신경망(Artificial Neural Networks), 서포트 벡터 머신(Support Vector Machine)과 같은 다양한 예측 기법과 비교하였다. 다음 단계에서 임계치의 최적화를 통해 FNE(False Negative Error)와 FPE(False Positive Error)의 가중 평균인 전체 오분류 비용을 최소화한다. 이후 모델의 유용성을 검증하기 위해 모델을 실제 재범예측 데이터셋에 적용하여 XGBoost 모델이 다른 비교 모델 보다 우수한 예측 정확도를 보일 뿐 아니라 오분류 비용도 가장 효과적으로 낮춘다는 점을 확인하였다.

통계 기법에 의한 방산업체의 간접원가부문 비율 추정 (Ratio Estimation of Indirect Cost Sector about Defense Companies by Statistic Technique)

  • 임현철;김수환
    • 산업경영시스템학회지
    • /
    • 제40권4호
    • /
    • pp.246-252
    • /
    • 2017
  • In the defense acquisition, a company's goal is to maximize profits, and the government's goal is to allocate budgets efficiently. Each year, the government estimates the ratio of indirect cost sector to defense companies, and estimates the ratio to be applied when calculating cost of the defense articles next year. The defense industry environment is changing rapidly, due to the increasing trend of defense acquisition budgets, the advancement of weapon systems, the effects of the 4th industrial revolution, and so on. As a result, the cost structure of defense companies is being diversifying. The purpose of this study is to find an alternative that can enhance the rationality of the current methodology for estimating the ratio of indirect cost sector of defense companies. To do this, we conducted data analysis using the R language on the cost data of defense companies over the past six years in the Defense Integrated Cost System. First, cluster analysis was conducted on the cost characteristics of defense companies. Then, we conducted a regression analysis of the relationship between direct and indirect costs for each cluster to see how much it reflects the cost structure of defense companies in direct labor cost-based indirect cost rate estimates. Lastly a new ratio prediction model based on regularized regression analysis was developed, applied to each cluster, and analyzed to compare performance with existing prediction models. According to the results of the study, it is necessary to estimate the indirect cost ratio based on the cost character group of defense companies, and the direct labor cost based indirect cost ratio estimation partially reflects the cost structure of defense companies. In addition, the current indirect cost ratio prediction method has a larger error than the new model.

근사규모 추정에 의한 증권시스템 운영비용 산정 모텔 개발 (Developing a Security Systems Operation Cost Estimation Model with Approximate Sizing)

  • 최원영;김현수
    • Journal of Information Technology Applications and Management
    • /
    • 제11권1호
    • /
    • pp.39-51
    • /
    • 2004
  • Application systems outsourcing is an important part of IT outsourcing services. Application systems outsourcing costs is determined by service levels of outsourcers. Recent researches show there is a strong need to build industry-specific cost estimation models. In this study, an industry-specific application systems operation cost estimation model is suggested. We reviewed operation cost models of previous researches, and proposed a cost estimation model for security industry. Industry-specific service factors are defined and service levels are determined by Interviews with experts. The proposed model is tested and adjusted with empirical data. The new model shows more accurate prediction than previous general models. Future research will be needed to develop outsourcing cost estimation models for other industries and to refine cost models developed in this study.

  • PDF

가치중심의 SI (System Integration) 사업 규모 및 비용산정 모형 구축 연구 (A Value-oriented System Integration Project Sizing and Cost Estimation Model)

  • 김현수
    • Asia pacific journal of information systems
    • /
    • 제8권3호
    • /
    • pp.101-118
    • /
    • 1998
  • The purpose of this study is to construct a value-oriented sizing and cost estimation model for system integration projects. In particular, this study is to build a system architecture design and integration cost model, and a network design and implementation cost model. Unlike software development projects, system integration projects include knowledge-intensive professional services on system architecture and network design areas. Because of these work's high invisibility, the cost of these services is hard to estimate and measure. Therefore, we need to develop value-oriented cost models. This study presents 6 value-oriented cost models, and tests statistical significance of these models with real system integration project data. The results show that cost factors on these models are valid, and models are statistically significant. Future work is needed to integrate various cost models and apply the whole model to field projects to increase model's prediction accuracy.

  • PDF

신경망 모델과 확률 모델의 풍수해 예측성능 비교 (Performance Comparison between Neural Network Model and Statistical Model for Prediction of Damage Cost from Storm and Flood)

  • 최선화
    • 정보처리학회논문지B
    • /
    • 제18B권5호
    • /
    • pp.271-278
    • /
    • 2011
  • 최근 급증하는 기상이변 및 기후온난화 현상은 풍수로 인한 피해를 더욱 가속시키고 있어 풍수해 발생가능성을 미리 예측하여 선제적으로 대응할 방안 마련이 필요하다. 재난 재해의 위험성 분석은 주로 확률 통계기법에 기반한 수식모델 연구가 주류를 이루고 있고 소방방재청 국립방재연구소에서 구축한 태풍위원회 재해정보시스템(TCDIS: Typhoon Committee Disaster Information System) 또한 지역별 풍수해 위험성 분석에 확률모델을 활용하고 있다. 본 논문에서는 경험적 패턴인식에 탁월한 성능을 가진 신경망 알고리즘을 활용하여 개발한 풍수해 예측모델을 소개하고 이 모델과 TCDIS의 KDF 확률밀도함수를 이용한 풍수해 예측모델의 성능 비교 결과를 제시하여 기존 TCDIS의 위험성 분석기능에 신경망 모델을 적용함으로써 시스템의 강건성과 예측 정확도 향상이 가능함을 보이고자 한다.

공사 진행단계별 기울기 추정을 통한 최종 공사비 및 공기 예측 (Prediction of Final Construction Cost and Duration by Forecasting the Slopes of Cost and Time for Each Stage)

  • 진의재;곽수남;김두연;김형관;한승헌
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.137-142
    • /
    • 2006
  • 비용과 공기는 수익과 직접적인 상관관계를 갖는 중요한 요소로 성공적인 프로젝트를 위해서는 이들에 대한 정확한 예측이 이루어져야 한다. 현재 최종 공사비와 공기 예측을 목적으로 EVMS(Earned Value Management System)가 범용적으로 활용되고 있지만, 기존에 제시된 공사비 및 공기 예측모텔은 선형적인 예측방식을 사용하기 때문에 예측결과가 부정확하고 시공업체의 성향, 프로젝트의 특성, 진도율에 따른 변화 등을 고려하지 못하는 한계가 있었다. 본 연구에서는 건설산업의 다양한 특성이 반영될 수 있도록 PB-S curve와 다중회귀분석을 이용한 진행단계별 공사비 및 공기의 기울기 예측모델을 제안하고 이를 동해 최종 공사비 및 공기를 예측하고자 한다. 이를 위하여 국내 건설업체로부터 23건의 도로공사 EVMS 자료를 활용하여 공사 진행단계별 기울기 예측을 위한 회귀분석방정식을 도출하고, 활용성을 검증하였다.

  • PDF

FORECASTING THE COST AND DURATION OF SCHOOL RECONSTRUCTION PROJECTS USING REGRESSION ANALYSIS

  • Wei Tong Chen;Ying-Hua Huang;Shen-Li Liao
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.892-896
    • /
    • 2005
  • This paper collected 132 schools reconstruction projects in central Taiwan, which received the most serious damage from the Chi-Chi Earthquake. Regression analysis was implemented to build the prediction model of the cost and the duration for the collected projects. It is found that the cubic regression models are capable for predicting the cost and the duration of the projects contracted by the central agency of which the contracting awarding approach was based on the most advantageous tendering (MAT) approach. On the other hand, power regression models are capable for predicting the cost and the duration of the projects contracted through the low bid tendering (LBT) approach. It is also found that the performance of the regression prediction model differs in accordance with organizations that contracted the reconstruction projects.

  • PDF

유한요소법을 이용한 드로우비드 저항력 예측모델 개발 및 성형공정에의 적용 (Simulation-based Prediction Model of Draw-bead Restraining Force and Its Application to Sheet Metal Forming Process)

  • 배기현;송정한;허훈;김세호;박성호
    • 한국소성가공학회:학술대회논문집
    • /
    • 한국소성가공학회 2006년도 제5회 박판성형 SYMPOSIUM
    • /
    • pp.55-60
    • /
    • 2006
  • Draw-bead is applied to control the material flow in a stamping process and improve the product quality by controlling the draw-bead restraining force (DBRF). Actual die design depends mostly on the trial-and-error method without calculating the optimum DBRF. Die design with the predicted value of DBRF can be utilized at the tryout stage effectively reducing the cost of the product development. For the prediction of DBRF, a simulation-based prediction model of the circular draw-bead is developed using the Box-Behnken design with selected shape parameters such as the bead height, the shoulder radius and the sheet thickness. The value of DBRF obtained from each design case by analysis is approximated by a second order regression equation. This equation can be utilized to the calculation of the restraining force and the determination of the draw-bead shape as a prediction model. For the evaluation of the prediction model, the optimum design of DBRF in sheet metal forming is carried out using response surface methodology. The suitable type of the draw-bead is suggested based on the optimum values of DBRF. The prediction model of the circular draw-bead proposes the design method of the draw-bead shape. The present procedure provides a guideline in the tool design stage for sheet metal forming to reduce the cost of the product development.

  • PDF