• Title/Summary/Keyword: Cost Indicator

Search Result 245, Processing Time 0.022 seconds

A Evaluation System Integrating Cost-Cross Effects of Big Scale R&D Projects (R&D프로젝트군의 우선순위 결정을 위한 비용 - 상호효과 통합평가시스템)

  • Kwon, Cheol-Shin;Lee, Soon-Cheon;Park, Jooh-Ho
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.32 no.2
    • /
    • pp.163-175
    • /
    • 2007
  • [ $ulcorner$ ]Cost-Effectiveness Analysis$\lrcorner$ has been wifely used to evaluate economic efficiency of R&D projects, but most of cost-effectiveness evaluation systems have some problems such as systematic method for setting and evaluating cost factors, estimation of single effect on each R&D project, and estimation of cross effects among R&D projects. To solve these problems, we have designed a new evaluation indicator called a $ulcorner$Cost-Cross Effect Integration Indicator$lrcorner$ including cross effects developed in this research. The major research findings are summarized as follows : (1) $ulcorner$Coist Estimation Model$lrcorner$, which estimates the cost factors divided into two classes of assembly product and system product and then integrates the total cost values, has been designed. (2) A new method for estimating parameters of cross effects among R&D projects has been developed. (3) $ulcorner$Cross Effects Estimation Model$lrcorner$ to estimate multi-effects and cross effects by completion time among several projects has been designed. (4) $ulcorner$Integration Estimation Indicator$lrcorner$ for setting priority on a project group has been extracted by combination of total cost value and total effect value.

Evaluating the Levels of Port Services by the Average Waiting Cost of Ships (선박당 평균대기비용에 의한 항만의 서비스 수준 평가)

  • Park, Byung-In;Bae, Jong-Wook;Park, Sang-June
    • Journal of Korea Port Economic Association
    • /
    • v.25 no.4
    • /
    • pp.183-202
    • /
    • 2009
  • This study estimates the port waiting cost of international trade ports in Korea by an opportunity cost approach. In the next step, we present a method to assess the levels of port services by the average waiting cost of ships derived from the results of the first step. Because the port waiting cost reflects the social cost, it is difficult to use as a service indicator even though it is the decision support information for a particular port facility expansion. The percentages of waiting ships and time also are insufficient indicators to reflect only the quantitative aspects by the time. However, the average waiting cost of ships in this study can be utilized as a service indicator to reflect waiting time and the loss of economic value simultaneously. It is also very useful information for a shipper and a carrier to select a port. Based on the average waiting cost of ships in 2007, it is analyzed in order of lowest service ports sequentially such as Pyeongtaek-Dangjin, Pohang, Donghae, and Samcheonpo. It is different from the sequential order of ports by the port waiting cost such as Pohang, Incheon, Gwangyang, Pyeongtak-Dangjin, and Ulsan. The port waiting cost is to a port authority as a key indicator what the average waiting cost of ships is to a port user as a useful indicator to evaluate the levels of port services.

  • PDF

The Research on the Korean Distant Water Trawl Fisheries (한국 원양트롤어업의 경영실태에 관한 연구 : 기지식 트롤어업을 중심으로)

  • 성락곤;옥영수
    • The Journal of Fisheries Business Administration
    • /
    • v.32 no.2
    • /
    • pp.127-148
    • /
    • 2001
  • Korean distant water trawl fisheries were sector of most important distant water fisheries with tuna long liner fisheries during the development age in Korea. Nevertheless Korean distant water trawl fisheries have suffered from catches and Income problem. It was caused to the strengthen regulation of costal countries, the rapid liberalization trend of trade on the fishing products and the shortage of cheap manpower, etc. In this situation, Korean government is inclined to convert big adjacent trawl fisheries of distant water trawl fisheries for structure adjustment In domestic fisheries. that is analyzed to incorrect method because the efficiency of management indicator in adjacent trawl fisheries was bad than distant water trawl fisheries. Then this policy of Korean government needs to convert anything else. Also it was compared with one of Japan to the efficiency of management indicator of Korean distant trawl fisheries. The result of analysis, Korea was better than Japan in some factor, especially labor cost Then if Korean government will put weighted policy on this viewpoint, Korean distant water trawl can more grow.

  • PDF

A study on the analysis of production-related key performance indicator affecting business positioning of machinery manufacturers (중소기계제조업의 사업포지셔닝에 영향을 미치는 생산관련 핵심성과지표에 관한 연구)

  • Cheong, Hae-Sock;Yoo, Woo-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.2
    • /
    • pp.221-228
    • /
    • 2012
  • This paper analyzed twenty-six production-related KPI(Key Performance indicator) factors of business diagnosis, such as personnel, equipment, materials, operations and quality affecting company business competition to 186 small machinery manufacturers in 2010. Also, we explained the concept of Business Positioning and divided research subjects into four Business Positioning Groups formed break-even point ratio & fixed cost ratio to sales and then we compared between the 4 groups using Logistic Regression analysis by SAS statistical software package. The objective of this study is two-fold. The first is to find out production-related KPI factor of superior Business Positioning Group. The second is to suggest improvement ways for small manufacturers in order to get better profitable Business Positioning.

A Study on Implementation and Design of Web-based Web-Cost Management System: Part 1; Design (웹 기반의 품질코스트 관리시스템 구축 : 제1부;시스템 설계)

  • Chung Young-Bae;Kim Yon-Soo;Kim Jun-Hong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.27 no.3
    • /
    • pp.97-105
    • /
    • 2004
  • The purpose of this study is to design and implement web-based quality cost management system to measure the performance of quality improvement activities in the business firms. The designed web-based quality cost management system which is also known as WQCMS (Web-based Q-Cost Management System) utilized newly classified objective performance indicator items to measure quality related activities. Well-classified performance measurement Indicator item lists which are played key role in the system was researched and standardized according to size and business categories of enterprise. Its code standards are based from fundamental PAF Model. Developed WQCMS have ability to collect and analyze quality data generated from various different departments in the inside or outside of the enterprise without any limitations, if end-users are able to access wide area network. It provides the capability to integrate quality information from database and to generate various easy analysis reports to management's needs using built-in analysis tool modules with real-time. The proposed system was developed using Microsofi's .Net technology, ASP.NET and MS-SQL Server 2000. By web-enabling Q-cost management system, the effectiveness of the system management and utilization was realized by easiness of information Integration and economical efficiency.

Nexus among Bank Competition, Efficiency and Financial Stability: A Comprehensive Study in Bangladesh

  • RAHMAN, Syed Mohammad Khaled;CHOWDHURY, Mohammad Ashraful Ferdous;TANIA, Tasmina Chowdhury
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.8 no.2
    • /
    • pp.317-328
    • /
    • 2021
  • This study examines the impact of bank competition and efficiency in the financial stability of the banking sector in Bangladesh. The study used the Lerner index and the Boone indicator to represent the bank competition, while the non-performing loan (NPL) and Z-score are used to represent financial stability. The secondary data were collected from the annual reports of 28 DSE listed commercial banks of Bangladesh over the period from 2011 to 2018. Using a dynamic panel GMM model, the study found the Lerner index is significantly negatively related with Z-score, which means that higher bank competition results in higher bank stability. It is also seen that higher cost efficiency results in higher bank stability. The Lerner index has negative, but insignificant impact on NPL. Similarly, using the Boone indicator, this study found that lower competition increases NPL. In terms of the Z-score, the Boone indicator found that 1 unit of increment results in decrease of the Z-score by 6.15 units. The study suggests that, as more competition results in more financial soundness, the banking industry competition should be ensured by policymakers or regulators. Banks could enhance financial stability by cost control to achieve cost efficiency as well as by improving loan-to-asset ratio.

Four Anchor Sensor Nodes Based Localization Algorithm over Three-Dimensional Space

  • Seo, Hwajeong;Kim, Howon
    • Journal of information and communication convergence engineering
    • /
    • v.10 no.4
    • /
    • pp.349-358
    • /
    • 2012
  • Over a wireless sensor network (WSN), accurate localization of sensor nodes is an important factor in enhancing the association between location information and sensory data. There are many research works on the development of a localization algorithm over three-dimensional (3D) space. Recently, the complexity-reduced 3D trilateration localization approach (COLA), simplifying the 3D computational overhead to 2D trilateration, was proposed. The method provides proper accuracy of location, but it has a high computational cost. Considering practical applications over resource constrained devices, it is necessary to strike a balance between accuracy and computational cost. In this paper, we present a novel 3D localization method based on the received signal strength indicator (RSSI) values of four anchor nodes, which are deployed in the initial setup process. This method provides accurate location estimation results with a reduced computational cost and a smaller number of anchor nodes.

A Study on Evaluation Indicator of School Building (학교 건축물 평가지표 개발 연구)

  • Yoo, Taek-Dong;Cho, Jin-Il;Kim, Sung-Jung;Cho, Kyung-Suk
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.5 no.2
    • /
    • pp.31-52
    • /
    • 2006
  • It presented the specialty and efficient evaluation indicator and a method which corresponds in each quality classified with 4 fields - an use and the function, the environment and an equipment, the structure stability, an main finishing material from plan side against an existing school facility in order to suit in development of the standard indicator which has become fixed quantity and demand of evaluation method for an analysis of the object school facilities to rebuild. So it presented the method which is the fixed quantity evaluation from economic viewpoint as possible for evaluating the maintenance cost by the expenses involved and durable years increase in rebuilding of objective school facility.

  • PDF

An automaticity indicator computation and a factory automation procedure (자동화 지표 계산 및 공장자동화 순서 결정을 위한 방법)

  • Cho, Hyun-Bo;Jeong, Ki-Yong;Lee, In-Bom;Joo, Jae-Koo;Lee, Joo-Kang;Jeon, Jong-Hag
    • IE interfaces
    • /
    • v.10 no.1
    • /
    • pp.209-222
    • /
    • 1997
  • The paper provides a methodology to obtain the automaticity indicator of a factory and the sequence of enabling technologies of factory automation. The automaticity indicator is the measure of the current automation status of a factory and can be used as a crucial criteria for the future automation schedule and investment. Although most industries have their own computation methods which usually consider the number of workers in the shop floor, this research covers five evaluation items of automation, such as, production facility, material transfer system, inspection and test system, information system, and flexibility. The detailed evaluation models are developed for each item. Automation sequencing prioritizes the enabling technologies of factory automation on the basis of several criteria which consist of two phases. The first phase includes the automation indicator and the second phase includes six sub-criteria such as production rate, quality, number of workers, capital investment, development duration, development difficulty. For this evaluation, AHP(Analytical Hierarchy Process) is introduced to prevent the decision maker's subject intention. As results of the automaticity indicator and automation sequence, the manager can save time and cost in building constructive and transparent automation plans.

  • PDF

Lamb Production Costs: Analyses of Composition and Elasticities Analysis of Lamb Production Costs

  • Raineri, C.;Stivari, T.S.S.;Gameiro, A.H.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • v.28 no.8
    • /
    • pp.1209-1215
    • /
    • 2015
  • Since lamb is a commodity, producers cannot control the price of the product they sell. Therefore, managing production costs is a necessity. We explored the study of elasticities as a tool for basing decision-making in sheep production, and aimed at investigating the composition and elasticities of lamb production costs, and their influence on the performance of the activity. A representative sheep production farm, designed in a panel meeting, was the base for calculation of lamb production cost. We then performed studies of: i) costs composition, and ii) cost elasticities for prices of inputs and for zootechnical indicators. Variable costs represented 64.15% of total cost, while 21.66% were represented by operational fixed costs, and 14.19% by the income of the factors. As for elasticities to input prices, the opportunity cost of land was the item to which production cost was more sensitive: a 1% increase in its price would cause a 0.2666% increase in lamb cost. Meanwhile, the impact of increasing any technical indicator was significantly higher than the impact of rising input prices. A 1% increase in weight at slaughter, for example, would reduce total cost in 0.91%. The greatest obstacle to economic viability of sheep production under the observed conditions is low technical efficiency. Increased production costs are more related to deficient zootechnical indexes than to high expenses.