• Title/Summary/Keyword: Cost Evaluation Method

Search Result 1,235, Processing Time 0.025 seconds

POST-OCCUPANCY EVALUATION (POE) AFTER THE EXPANSION OF AN APARTMENT PARKING LOT

  • Park, Jin-Gu;Oh, Kyung-Taek;Ryu, Gyu-Seok;Jung, In-Su;Lee, Chan-Sik
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1559-1563
    • /
    • 2009
  • Despite the serious lack of parking lots, studies on parking lot expansion are insufficient; research on users' satisfaction following parking lot expansion is practically nonexistent. Therefore, this study sought to provide basic data for the parking lot expansion of old apartments by comparatively analyzing users' satisfaction before and after the parking lot expansion through a questionnaire survey that targeted residents benefiting from the expanded parking lot. Results revealed a low post-occupancy satisfaction with the parking lot expansion despite the parking lot expansion and improvement of the parking lot environment. This was because the parking lot was not expanded up to the second basement floor due to the lack of appropriate parking space. Other factors included the construction cost burden and lack of connectivity of the basement parking lot with elevators. The results actually raise the need for the establishment of an optimally suitable expansion plan and development of method and technology requiring lower cost and shorter construction period in the design and construction processes for parking lot expansion. Through post-occupancy evaluation (POE) after parking lot expansion, this study quantitatively identified the problems associated with the parking lots of old apartments and ensuing expansion effects. The findings in this study can be used as basic data to seek a suitable diagnosis and evaluation method for the parking lots of old apartments.

  • PDF

The evaluation of cost-of-illness due to use of cost-of-illness-based chemicals

  • Hong, Jiyeon;Lee, Yongjin;Lee, Geonwoo;Lee, Hanseul;Yang, Jiyeon
    • Environmental Analysis Health and Toxicology
    • /
    • v.30 no.sup
    • /
    • pp.6.1-6.4
    • /
    • 2015
  • Objectives This study is conducted to estimate the cost paid by the public suffering from disease possibly caused by chemical and to examine the effect on public health. Methods Cost-benefit analysis is an important factor in analysis and decision-making and is an important policy decision tool in many countries. Cost-of-illness (COI), a kind of scale-based analysis method, estimates the potential value lost as a result of illness as a monetary unit and calculates the cost in terms of direct, indirect and psychological costs. This study estimates direct medical costs, transportation fees for hospitalization and outpatient treatment, and nursing fees through a number of patients suffering from disease caused by chemicals in order to analyze COI, taking into account the cost of productivity loss as an indirect cost. Results The total yearly cost of the diseases studied in 2012 is calculated as 77 million Korean won (KRW) per person. The direct and indirect costs being 52 million KRW and 23 million KRW, respectively. Within the total cost of illness, mental and behavioral disability costs amounted to 16 million KRW, relevant blood immunological parameters costs were 7.4 million KRW, and disease of the nervous system costs were 6.7 million KRW. Conclusions This study reports on a survey conducted by experts regarding diseases possibly caused by chemicals and estimates the cost for the general public. The results can be used to formulate a basic report for a social-economic evaluation of the permitted use of chemicals and limits of usage.

Quantifying Risk Factors on Cost Performance By Characterizing Capital Facility Projects

  • Jang, Myung-Hoon;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.177-183
    • /
    • 2006
  • Risk-based estimation has been successfully introduced into the construction industry. By incorporating historical data associated with probability analysis, risk-based estimate is an effective decision support aid in considering whether to launch a particular project. The industry challenges, however, especially related with management issues, such as labor shortage, wage growth, and supply chain complexity, have often resulted in poor cost performance. The insufficient assessing the project characteristics (i.e., resource availability, project complexity, and project delivery method) can be the main reasons in the poor cost performance. Because the accuracy level of cost performance prediction can be enhanced by extensive evaluation of the subject project characteristics, a new approach for predicting cost performance in an earlier stage of a project can improve the Industry substantiality, in other words, value maximization. The purpose of this paper is to develop a new methodology in developing a risk-based estimate tool by incorporating extensive project characteristics. To do this, an extensive industry survey was conducted from both private and public sectors in building industry in Korea. In addition, significant project characteristics were identified in terms of cost performance indicator. Although the data collection is limited to Korean industry the suggested approach provides the industry with a straightforward methodology in risk management. As many researchers maintained that front-end planning efforts are crucial in achieving the successful outcome in building projects, the new method for risk-based estimation can Improve the cost performance as well as enhance the fulfillment in terms of business sustainability.

Method and Procedure for Economic Evaluation of Improvement Activities

  • Kono, Hirokazu;Ichikizaki, Osamu
    • Industrial Engineering and Management Systems
    • /
    • v.14 no.2
    • /
    • pp.122-128
    • /
    • 2015
  • The purpose of this paper is to propose an appropriate evaluation scheme for improvement activities, based on a simple model comprising cash inflow by sales as well as variable and fixed cost expenditures. The paper distinguishes capacity surplus and capacity shortage situations, and examines economic benefits gained by yield increase improvement and capacity increase. The paper then proposes a basic rule of thumb for economic evaluation of improvement activities. The logic is simple but useful in practice, being conducive towards improvement activities under current economic conditions with uncertainties.

Economic Evaluation of ESS in Urban Railway Substation for Peak Load Shaving Based on Net Present Value

  • Park, Jong-young;Heo, Jae-Haeng;Shin, Seungkwon;Kim, Hyungchul
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.2
    • /
    • pp.981-987
    • /
    • 2017
  • In this paper, we estimate the economic benefits of Energy Storage Systems (ESSs) for peak load shaving in an urban railway substation using the annual cost. The annual investment cost of ESSs is estimated using Net Present Value (NPV) and compared with the cost reduction of electricity by the ESS. The optimal capacities of the battery and Power Converting System (PCS) are determined for peak load shaving. The optimal capacity of the ESS and the peak load shaving is determined to maximize the profit by the ESS. The proposed method was applied to real load data in an urban railway substation, and the results show that electric power costs can be reduced. Other aspects of the ESS, such as the lifetime and unit price of the battery, are also investigated economically.

Cost Evaluation of multirate LQD Control

  • 이진우;오준호
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1997.04a
    • /
    • pp.174-178
    • /
    • 1997
  • In this paper,we consider a LQG problem subject to the stochastic multirate system. By restating the problem as a periodic LQG problem, it is pointed out that the lack of measurements and control inputs in some time instants makes the problem singular. A method of transforming the problem into a nonsingular one enables us to obtain the solution,however which gives a resulting value of the LQG cost and the setimation error dynamic different with those of the original system. As a consequence, we present a optimal value of the original cost and the estimation error covariance of the original system,which are expressed by periodic Lyapunov equation respectively. The evaluation resulte can be exploited in comparing the control system performances and specifying the sampling rates.

Economic Evaluation of Various Cooling Systems (냉방기기별 경제성 평가)

  • Kim, Young-Il;Cho, Keum-Nam
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.214-219
    • /
    • 2008
  • In this study, medium capacity EHP and GHP for air-conditioning a building with a floor area of $1,200\;m^2$ are compared economically. To consider all the factors of initial and operation costs effectively, an annual equal payment method is proposed. For the initial cost, equipment, construction, installation, electric facility, financial subsidy and tax cut are considered. Basic electricity, energy(electricity and gas), space charge, labor, insurance and repair are considered for the operation cost. Under the assumptions made in this study, overall cost of EHP is less than that of GHP. However, different outcome may result if different assumptions are made. This study is useful for performing an economic evaluation of various air-conditioning systems.

  • PDF

An Analysis on the Economic Validity of the Establishment of R&D Supreme Academy (R&D 인력 재교육 전문기관의 경제적 타당성 분석)

  • Lim, Chang-Joo;Kim, Sang-Yung;Baek, Nak-Ki;Oh, Sea-Hong;Seo, Jong-Hyen
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.3
    • /
    • pp.181-188
    • /
    • 2009
  • This paper presents the economic validity with the cost/benefit analysis on establishing R&D Supreme Academy. To evaluate the profitability of R&D Supreme Academy, willingness to pay (WTP) is measured by contingent valuation method (CVM) and then the net present value (NPV), internal rate of return (IRR) and benefit/cost ratio(BCR) are calculated. The results of economic evaluation verified that the establishment of R&D Supreme Academy is timely and effective in an economic perspective.

Fuzzy Regression Analysis by Fuzzy Neual Networks: Application to Quality Evaluation Problem (퍼지 신경망에 의한 퍼지 회귀분석:품질 평가 문제에의 응용)

  • 권기택
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.4 no.2
    • /
    • pp.7-13
    • /
    • 1999
  • This paper propose a fuzzy regression method using fuzzy neural networks when a membership value is attached to each input -output pair. First, an architecture of fuzzy neural networks with fuzzy weights and fuzzy biases is shown. Next, a cost function is defined using the fuzzy output from the fuzzy neural network and the corresponding target output with a membership value. A learning algorithm is derived from the cost function. The derived learning algorithm trains the fuzzy neural network so that the level set of the fuzzy output includes the target output. Last, the proposed method is applied to the quality evaluation problem of injection molding

  • PDF

A STUDY ON THE EVALUTION METHOD OF THE GAS DISTRIBUTION COST IN KOREA (국내(國內) 천연(天然)가스 유통비용평가방법(流通費用評價方法)에 관한 연구(硏究))

  • Kim, Tae-Yu;Lee, Se-Jun;Min, Cheol-Gu
    • Environmental and Resource Economics Review
    • /
    • v.1 no.1
    • /
    • pp.1-25
    • /
    • 1991
  • The domestic liquefied natural gas project has been carried out as a national energy scheme since the late 1980's in Korea. The natural-gas supply for civilian demand is limited to the Kyung-In area. In addition, seven major city gas corporations which now participate in the project occupy the monopolistic service area. In this study, objective cost evaluation criteria for gas distribution and an improved proposal in the evaluation method are suggested. They will go forward in solving the problems to promote demand and prevent excess profit or deficit according to the physical characteristics of the monopolistic service area.

  • PDF