• Title/Summary/Keyword: Cost Evaluation

검색결과 3,458건 처리시간 0.033초

산업단지내 배전계통의 공급신뢰도 및 정전비용 평가 (Evaluation of Reliability and Interruption Cost of Distribution Power System in Industrial Complex)

  • 최상봉;남기영;김대경;정성환;류희석;이재덕
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.95-96
    • /
    • 2006
  • As the power industry moves towards open competition, there has been a call for methodology to evaluate distribution power system reliability by using customer interruption costs. Accordingly, it is increased for methodology to evaluate distribution power system reliability in power supply zones under competitive electricity market. This paper presents algorithm to evaluate system average interruption duration index. expected energy not supplied and system outage cost taking Into consideration failure rate of distribution facility and industrial customer interruption cost. Also, to apply this algorithm to evaluate system outage cost presented in this paper, distribution system of a dual supply system consisting of mostly high voltage customers in industrial complex in Korea is used as a sample case study. Finally, evaluation results of system interruption cost, system average interruption duration index and expected energy not supplied in sample industrial complex area are shown in detail.

  • PDF

Evaluation of Advanced Water Treatment Operation

  • Kim, Seung-Hyun
    • 한국환경보건학회:학술대회논문집
    • /
    • 한국환경보건학회 2002년도 춘계 국제 학술대회
    • /
    • pp.54-64
    • /
    • 2002
  • This study evaluated advanced water treatment (AWT) system in Korea. There are currently 16 plants operating with AWT. However, no attempt has been made to evaluate AWT system. This study selected one water treatment plant with AWT (pre-ozonation + BAC). Using the operation data from 1995 to 2001 and pilot study results, the post-evaluation of the AWT system has been conducted. The study found that AWT improved water qualities of organic, ammonia, and turbidity, as expected. However, the extent of the improvement was generally short of the pilot study expectations. Pre-ozonation failed to decrease coagulant consumption. The dosage increased rather than decreased. AWT was, however, successful to decrease chlorine consumption. The chlorine reduction was related to the change in raw water characteristics and AWT introduction. Pre-ozonation failed to decrease coagulant consumption. The dosage increased rather than decreased. AWT was, however, successful to decrease chlorine consumption. The chlorine reduction was related to the change in raw water characteristics and AWT introduction, Both operation of pre-ozonation and reduced ammonia loading were responsible for the reduction. AWT increased the operation cost. Maintenance, raw water, and power cost increased, while labor and chemical cost decreased. Manpower reduction resulting form automation caused the decrease of labor cost. The reduction of chlorine consumption caused the decrease of chemical cost.

  • PDF

최적박용기관의 선정 및 그의 경제성 평가방법에 관한 연구 (A study on the selection of optimal marine engine and its techno- economical evaluation method)

  • 전효중;조기열
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제8권2호
    • /
    • pp.51-66
    • /
    • 1984
  • The cost percentage of engine part in the total building cost of a ship is about 30-40% and the main engine occupies about 50% of the engine part cost. For certain ships the fuel bill can be as high as about 60-70% of the total operating cost after two oil shocks and its amount for one year is nearly equivalent to her main engine price. This fact has further increased the pressure on the engine builders to develop engines of higher efficiency and better possibilities to burn further deteriorated fuel qualities. But the energy-saving plants are ordinarily more expensive and their available amount of exhaust gas energy is less and therefore, they are not always profitable and optimum systems. This paper is prepared to decide the most economical and efficient engine systems by presenting reasonable selecting and economical evaluation methods of the main engine, which is the largest single unit and the most expensive, and its auxiliaries. In order to demonstrate the application of investigated methods in a practical case, a 46, 000 DWT class bulk carrier is selected as a model ship and her main engine and its auxiliaries are selected and evaluated. The result shows that the optimum determined has one year three months POP, 0.903 IRR at a year, 4, 116, 000 dollars PW in 15 years (for 5% escalation rate of fuel cost) and 9.522 BCR for same condition, when the engine plant of a same existing ship is taken as the basis.

  • PDF

민감도 분석을 적용한 제주 연안 풍력단지 설계의 경제성 분석 (Economic analysis of jeju offshore pilot run wind farm by sensitivity analysis)

  • 이경현;박재희;진정운;권기린;최경현
    • 동력기계공학회지
    • /
    • 제16권5호
    • /
    • pp.13-19
    • /
    • 2012
  • In this paper, the offshore wind farms have been designed by using WindPRO with the help of real wind data measurements at Jeju Costal area by calculating the annual energy production for exact economic evaluation. In order to achieve benefit of wind farm, the annual revenue for power generation have been calculated with SMP and REC value. And construction cost has derived from the real wind farm project case. Also O&M cost has been estimated by OMCE (Operating & Maintenance Cost Estimator) to get accurate cost of wind farm. Economic evaluation of wind farms have been performed by comparing above parameters. In addition, sensitivity analysis calculating the effect of these factors has also been carried out.

노후 학교건물의 유지관리비용 정책 평가를 위한 시스템 다이내믹스 모델 (A System Dynamics Model for Evaluation of Maintenance Cost Policy in Deteriorated School Building)

  • 강수현;김상용
    • 대한건축학회논문집:구조계
    • /
    • 제35권12호
    • /
    • pp.181-188
    • /
    • 2019
  • The maintenance of school building is pivotal issue. However, it is difficult to obtain basic analysis data for LCC(Lifecycle Cost) analysis and maintenance planning of school building. Therefore, this study proposed System Dynamics(SD) techniques to make maintenance decisions for school building. The interaction between the major parameters related to the aging of a building, maintenance activities, and cost were expressed in Causal Loop Diagram. Based on this, the formula for the relationship between causal maps was defined and converted to Stock and Flow Diagram. Through the completed SD model the 50-year plan of 214 educational building were tested by considered in account budget, maintainability, and budget allocation opinions. As a result, the integrated SD model demonstrated that it can support strategic decision making by identifying the status class and LCC behavior of school buildings by scenario. According to the scenario analysis, the rehabilitation action of preventive maintenance that primarily repairs the buildings in condition grade C showed the best performance improvement effect relative to the cost. Therefore, if the proposed SD model is expanded to consider the effects of other educational policies, the crucial performance improvement budget can be estimated in the long-term perspective.

양어사료의 어분대체품 개발의 경제성 분석 (Economic Evaluation of The Newly Developed Fish Meal Analog (BAIFA-M))

  • 김기수;배승철;최재영;김우경
    • 수산경영론집
    • /
    • 제29권1호
    • /
    • pp.121-137
    • /
    • 1998
  • This study was conducted to examine the economic evaluation of the newly developed fish meal analog (BAIFA-M) in Korean rockfish feed. A raw fish feed (MP) and two commercially formulated diets (EP) were employed to compare weight gain (WG), feed conversion ratio (FCR) and survival rate (SR) from the sea cage culture system. By using the economic model in the practical sea cage culture system, feed cost, production cost and gross profit per kg production, rate of profit to gross revenue (RPGR), and internal rate of return (IRR) were calculated based upon the results of the experiment and the information of the private aquaculture farm (Young Chang) in Tong young, Korean. IRR criteria is one of the popular economic feasibility analysis methods applicable far aquaculture industry. This is an economic evaluation method to compare the given interest rate or the discount rate with IRR which can be calculated by the difference between the present value of the benefit stream and of the cost stream. The benefits of using EP on WG, FCR, SR, and production cost will be emphasized in this study. Fish averaging 20$\pm$3.6g (Mean$\pm$SD) were randomly distributed in each small cage (6m$\times$6m) as groups of 2,000 fish. By using 3 large size cages (12m$\times$12m), 12 small cages were constructed, and only 9 small cages were employed for three replicates of each diet treatment. To compare with MP diet, two sinking EP diets were designed by our laboratory and produced by the local feed company who wanted to promote these EP diets for the mass cage culture of Korean rockfish in the future. Two EP diets contain white fish meal and/or BAIFA-M as the main animal protein sources : WFM diet, maximum 43% of white fish meal : BAIEA- M diet, 30% of white fish meal nab replaced by BAIFA- M from WFM diet. Results are summarized in Table 1. Fish fed MP diet showed significantly lower SR than does fish fed two EP diets(P<0.05). However, there Were no significant difference on FCR among fish fed three practical diets. Table 1. Average feed conversion ratio (FCR), accumulative average survival rate (SR) and economic evaluation data far three practical diets. As we expected, BAIFA-M diet is more economical than WFM diet as well as MP diet. Feed cost and production cost per kg production from BAIEA - M diet were lower than those from WFM and MP diets. Moreover, gross profit per Kg production, RPGR and IRR from BAIFA- M diet were higher than those from WFM and MP diets. This economic evaluation study clearly indicated that MP diet should be replaced by the commerical formulated EP diets as soon as possible in the near future because MP diet is not economical in the practical sea cage culture system.

  • PDF

Failure Cost와 Life Cycle Cost를 고려한 연속시스템에 대한 최적 장치 선택에 관한 연구 (A Study on the Optimal Equipment Selection of Series Systems using Life Cycle Cost and Failure Cost)

  • 진상화;김용하;송희열;여영구;김인원
    • 한국안전학회지
    • /
    • 제19권4호
    • /
    • pp.55-59
    • /
    • 2004
  • In this study, the required life cycle cost is evaluated in consideration of the equipment's availability during its lift cycle. In order to meet the maximum availability required by the process, the failure cost and life cycle cost is assessed The optimal equipment selection method is presented according to the analysis of the failure cost and life cycle cost. For the systems in which equipments are connected serially, the optimal equipments are selected by minimizing the life cycle cost and satisfying the required system availability goal. In addition, the selection methods and lift cycle cost are analyzed according to the cost variation of the equipment. By using the life cycle evaluation procedure, the failure cost and maintenance cost needed during the life cycle of the equipment can be presented.

해양바이오수소개발 사업의 상업생산을 위한 예비경제성평가 (Economic Feasibility Study for Commercial Production of Bio-hydrogen)

  • 박세헌;유영돈;강성균
    • Ocean and Polar Research
    • /
    • 제38권3호
    • /
    • pp.225-234
    • /
    • 2016
  • This project sought to conduct an economic feasibility study regarding the commercial production of bio-hydrogen by the marine hyperthermophilic archaeon, Thermococcus onnurineus NA1 using carbon monoxide-containing industrial off-gas. We carried out the economic evaluation of the bio-hydrogen production process using the raw material of steel mill by-product gas. The process parameter was as follows: $H_2$ production rate was 5.6 L/L/h; the conversion of carbon monoxide was 60.7%. This project established an evaluation criterion for about 10,000 tonne/year. Inflation factors were considered as 3%. The operating costs were recalculated based on prices in 2014. The total investment required for development was covered 30% by capital and 70% by a loan. The operation cost for the 0.5-year test and integration, and the cost for the first three months in the 50% production period were considered as the working capital in the cost estimation. The costs required for the rental of office space, facilities, and other related costs from the construction through to full-scale production periods were considered as continuing expenses. Materials, energy, waste disposal and other charges were considered as the operating cost of the development system. Depreciation, tax, maintenance and repair, insurance, labor, interest rate charges, general and administrative costs, lubrication and miscellaneous expenses were also calculated. The hydrogen price was set at US$ 4.15/kg for the economic evaluation. As a result, the process was considered to be economical with the payback period of 6.3 years, NPV of 18 billion Won and IRR of 26.7%.

각 부하지점별 유효부하지속곡선 작성법에 관한 연구 (A Study on Construction of the CMELDC at Load Points)

  • 김홍식;문승필;최재석
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제49권4호
    • /
    • pp.195-198
    • /
    • 2000
  • This paper illustrates a new method for constructing composite power system effective load duration curve(CMELDC) at load points. The main concept of proposed method is that the CMELDC can be obtain from convolution integral processing of the outage probabilistic distribution function of not supplied power and the load duration curve given at each load point. The effective load duration curve (ELDC) at HLI plays an important part in probabilistic production simulation, reliability evaluation, outage cost assessment and power supply margins assesment for power system planning and operation. And also, the CMELDC at HLII will extend the application areas of outage cost assessment and reliability evaluation at each load point. The CMELDC at load points using the Monte Carlo method and a DC load flow constrained LP have already been developed by authors. The effective load concept at HLII, however, has not been introduced sufficiently in last paper although the concept is important. In this paper, the main concept of the effective load at HLII which is proposed in this study is defined in details as the summation of the original load and the probabilistic loads caused by the forced outage of generators and transmission lines at this load point. The outage capacity probabilistic distribution function at HLII can be obtained by combining the not supplied powers and the probabilities of the not supplied powers at this load point. It si also expected that the proposed CMELDC can be applied usefully to research areas such as reliability evaluation, probabilistic production cost simulation and analytical outage cost assessment, etc. at HLII in future. The characteristics and effectiveness of this methodology are illustrated by case study of IEEE-RTS.

  • PDF