Evaluation of Advanced Water Treatment Operation

  • Published : 2002.04.01

Abstract

This study evaluated advanced water treatment (AWT) system in Korea. There are currently 16 plants operating with AWT. However, no attempt has been made to evaluate AWT system. This study selected one water treatment plant with AWT (pre-ozonation + BAC). Using the operation data from 1995 to 2001 and pilot study results, the post-evaluation of the AWT system has been conducted. The study found that AWT improved water qualities of organic, ammonia, and turbidity, as expected. However, the extent of the improvement was generally short of the pilot study expectations. Pre-ozonation failed to decrease coagulant consumption. The dosage increased rather than decreased. AWT was, however, successful to decrease chlorine consumption. The chlorine reduction was related to the change in raw water characteristics and AWT introduction. Pre-ozonation failed to decrease coagulant consumption. The dosage increased rather than decreased. AWT was, however, successful to decrease chlorine consumption. The chlorine reduction was related to the change in raw water characteristics and AWT introduction, Both operation of pre-ozonation and reduced ammonia loading were responsible for the reduction. AWT increased the operation cost. Maintenance, raw water, and power cost increased, while labor and chemical cost decreased. Manpower reduction resulting form automation caused the decrease of labor cost. The reduction of chlorine consumption caused the decrease of chemical cost.

Keywords