• 제목/요약/키워드: Construction-phase Risk

검색결과 140건 처리시간 0.027초

A PROFIRABILITY MODEL BASED ON PRIMARY FACTOR ANALYSIS IN THE EARLY PHASE OF HOUSING REDEVELOPMENT PROJECTS

  • Kyeong-Hwan Ahn;U-Yeong Gim;Jong-Sik Lee;Won Kwon;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.497-501
    • /
    • 2013
  • An important decision-making element for the success of housing redevelopment projects is a prediction of the profitability of redevelopment. Risk factors influencing profitability were deduced through a review of the literature about profitability and a risk analysis developed by a survey of maintenance projects. In addition, a profitability prediction depending on the analysis of risk factors is necessary to judge the business feasibility of a project in the planning stages. A profitability prediction model of management and disposal method, which is calculated by proportional rate and which helps estimate contributions to profitability, is proposed to prevent difficulties in business development. The proposed model has the potential to prevent interruptions, reduce the length of projects, generate cost savings, and enable rational decision-making during the project period by allowing a judgment of profitability at the planning stage.

  • PDF

건설공정 위험성 기반 설계안전성 활용 방안 연구 (A Study on the Application of Safety Design based on the Risk of Construction Process)

  • 이현성
    • 한국재난정보학회 논문집
    • /
    • 제15권4호
    • /
    • pp.493-501
    • /
    • 2019
  • 연구목적: 건설안전 재해를 예방하기 위해 건설기술진흥법에서는 '설계 안전성 검토' 제도를 시행하고 있다. 이에 본 논문에서는 '설계안전성 검토' 제도에서 정한 규정의 실효성을 확보하기 위해 실제 건설현장에서의 시행 절차와 내용을 분석함으로써 해당 제도가 올바르게 정착되어 건설재해 예방에 기여하는데 그 목적이 있다. 연구방법: 건설기술진흥법에서 정한 설계 안전성 제도에서는 자료 검토 단계, 위험요소 도출 및 대안 설정단계, 설계안전성 평가 보고서 작성단계를 거쳐 최종적으로 위험요소에 대한 설계 반영단계 등의 각 단계별 적용사례를 분석하였다. 연구결과: 설계 안전성 제도에 따라 작업공종별로 철근콘크리트 공사, 건설기계공사, 토공공사, 가시설 등 건설사업의 형태별로 다양한 위험요소(Hazard)가 도출되었고, 이 위험요소의 위험등급별 우선순위를 도출하고 이를 해결하기 위해 실제 사례를 작성해 본 결과 다양한 공정에서의 설계 반영사례가 도출되었다. 결론: 본 연구를 통해 A공사에서 적정 기준에 맞는 굴착구배(1:0.3)를 채택했음에도 빈번한 토사 붕괴 사고의 문제를 개선하기 위해 관로터파기 경사에 준해 설계도면에 1:0.5를 채택하여 새로운 설계도면에 반영하였고, 그 결과 현행 굴착 구배 기준을 강화의 강화 필요성을 도출하였다.

한국형 PDRI(Project Definition Rating Index)기법 개발 방향 (A Study on the Direction for Developing the Korean PDRI(Project Definition Rating Index))

  • 홍심희;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.168-169
    • /
    • 2016
  • Risk management at an early stage of projects is known as an effective method expected various benefits. The PDRI(Project Definition Rating Index) by the CII(Construction Industry Institute) is defined project scope for reducing risks. In addition, the PDRI is one of the verified methods for achieving benefits by a risk management. The literature review in Korea about risk management is all about focusing on construction works and the construction phase. Thus, we need to extend the perspective of a project management such as the PDRI. To develop the Korean PDRI, However, we have to consider Korean situations. Therefore, in this study, we analyze some previous studies of PDRI' indexes and its using methods, and suggest the new direction for using PDRI in Korea. This method will enable to improve the scoring method of a project management with PDRI in Korea.

  • PDF

플랜트 건설 리스크 분석 및 리스크 정량화 모델 개발에 관한 연구 (Risk Factors Analysis and Quantitative Risk Assessment Model for Plant Construction Project)

  • 안성진;김태희;남경용;김지명
    • 한국건축시공학회지
    • /
    • 제19권1호
    • /
    • pp.77-86
    • /
    • 2019
  • 플랜트 건설 프로젝트에 대한 수요가 증가하고 복잡해짐에 따라 예기치 못한 위험 요소가 증가하고 있다. 이에 플랜트 건설 프로젝트에 대한 중점 리스크 요인을 바탕으로 정량적 리스크 분석 및 평가 모델 개발이 요구되고 있다. 본 연구는 보험 회사에서 수집 한 보험금 지급 데이터를 사용하여 플랜트 건설 프로젝트의 실제 재정적 손실을 위험 평가 모델의 종속 변수로 반영하였으며 문헌 검토 및 데이터 분석을 바탕으로, 지형, 시운전, 공정률, 총 공시비 및 총 공사기간을 독립변수로 채택하였다. 제안된 손실율 모델은 플랜트 프로젝트 리스크 분석과 시공/시운전 단계의 리스크 분석가이드라인으로 활용될 수 있다.

CRMS를 활용한 건설공사의 리스크관리 절차모형 개발 (Development of a Risk Management Procedure Model for the Construction Project Using Construction Risk Management System)

  • 김창학;강인석;박홍태
    • 대한토목학회논문집
    • /
    • 제30권4D호
    • /
    • pp.423-432
    • /
    • 2010
  • 본 연구에서는 공사기획단계와 시공단계에서 공사의 성공적 이행을 보장하기 위해 기존의 리스크관리 프로세스를 살펴보고 이에 적합한 새로운 리스크분석 모델인 CRMS를 제시한다. CRMS는 시공자가 건설공사의 이행중 리스크를 확인하고, 분석하고, 관리해 가기 위한 리스크관리절차이다. 이것은 시공자가 인지한 리스크를 정량화하고 이에 적절한 리스크관리 방안을 수립하는데 큰 도움을 줄 수 있다. 특히 건설공사의 리스크관리 중 가장 중요하고 어려운 부문이 리스크를 인지하는 것으로 볼 수 있다. 따라서 본 연구에서는 건설공사의 리스크인지를 쉽게 할 수 있는 절차의 개발에 좀 더 집중하였다. 리스크의 확인은 프로젝트의 외적 리스크와 내적 리스크로 구분한다. 글로벌 리스크의 경우 확인을 용이하게 하기 위해 분석에 필요한 목록을 제시하고, 아울러 RBS의 구축방법과 WBS와의 연계방안을 제시하였다. 이러한 연구결과는 리스크관리용 전산시스템을 개발하기 위한 기초자료로 활용되게 될 것이다.

프로젝트 리스크 관리(PRM)가 프로젝트 성공에 미치는 효과성 분석: 해외건설사업 수행단계 전반을 중심으로 (Analysis of the Effectiveness of Project Risk Management (PRM) on the Project Success: Focused on the Implementation Phase of Overseas Construction Projects)

  • 정설림;김대철
    • 산업경영시스템학회지
    • /
    • 제46권3호
    • /
    • pp.221-230
    • /
    • 2023
  • Under increased complexity and uncertainty of overseas construction projects, it is important for construction companies to improve their own project risk management capabilities instead of risk-taking strategies to secure competitiveness in the overseas construction market. Although most of the risks occur in project execution stage, many previous studies focused on planning stage including risk identification and analysis among PRM process. Therefore, this study aims to verify the effectiveness of whole PRM process during project execution stage through empirical study on participants of overseas construction projects. As the result it was found that first, the factor directly affects the project success is the execution process of PRM. It implies that appropriate actions such as appointing charged manager for risks, timely implementation of responding plan, continuous risk monitoring and updating established plan are the key for contribution to the project success. Second, the importance of communication in PRM is also found, which is not conducted at a specific but throughout the entire PRM process and need to be managed as essential factor for successful PRM..

Life Cycle Costing: Maintenance and Repair Costs of Hospital Facilities Using Monte Carlo Simulation

  • Kim, Tae-Hui;Choi, Jong-Soo;Park, Young Jun;Son, Kiyoung
    • 한국건축시공학회지
    • /
    • 제13권6호
    • /
    • pp.541-548
    • /
    • 2013
  • During the administration of a construction project, various types of participants are engaged in the project. From the design phase to the maintenance phase, these participants may confront many risks. To avoid these risks, participants should utilize an insurance company or a bond company. The types of risks and liability that a construction manager may face are listed in the construction law or contract. But there are some arguments related to risk transferring and the content of risks. For this reason, construction managers must carefully consider any possible risks in the contract and the construction law. Therefore, for construction managers to deal with risks appropriately, the introduction of a legal requirement to carry professional liability insurance, a defined compensation range for damages, a method of guarantee in the event of defects, a defined compensation claim period for damage, and a method of damage claim were suggested in this study.

주택재개발사업 시행단계의 위험요인 분석 (Risk Factor Analysis in the Implementation Phase of the Housing Redevelopment Project)

  • 안정민;정인수;이찬식
    • 한국건설관리학회논문집
    • /
    • 제12권4호
    • /
    • pp.97-105
    • /
    • 2011
  • 주택재개발사업에는 다수의 이해관계자들이 참여하기 때문에 사업기간 동안 분쟁의 발생은 필연적이라고 볼 수 있으며, 이들의 의견조율이 매우 중요하다. 본 논문은 주택재개발사업을 효율적으로 추진하기 위하여 조합이 직접적으로 참여하는 시행단계의 위험요인을 분석하였다. 주택재개발사업 시행단계에서 발생했던 분쟁사례와 관련 연구를 검토 및 분석하여 50개의 단계별 위험요인을 식별하였으며, 전문가 면담을 통하여 총 26개의 최종 위험요인을 선별하였다. 위험요인의 정량적인 분석을 위해 설문조사를 실시하여 AHP기법을 이용한 각 위험요인의 중요도를 산출하였으며, 각 단계의 중요도를 합산하여 최종 중요도와 우선순위를 나타내었다. 분석 결과 관리처분계획단계의 '관리처분계획의 부적정성'과 사업시행인가단계의 '사업시행계획의 부적정성'이 가장 중요한 요인으로 나타났다. 분석된 위험요인의 활용도를 높이기 위해, 사전에 위험요인을 인지하여 이를 예방할 수 있는 체크리스트를 제안하였다. 본 연구의 결과를 토대로 주택재개발사업의 시행단계 위험요인을 적극 관리한다면 사업을 더욱 효율적으로 추진할 수 있을 것으로 기대된다.

A STUDY ON CONSTRUCTION CONTRACTS AND PAYMENT METHODS IN CM AT RISK SYSTEM -APPROACH WITH ESTABLISHING CONTEXT OF GMP-CM SYSTEM -

  • JeaSauk Lee;JaeYoul Chun
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1002-1006
    • /
    • 2005
  • When we compare CM system with Design Bid Build system, we can see two striking features in CM system. First, CMr participates in construction team along with Owner, Designer and Constructor. The newcomer can change boundaries of function and responsibility. Second, Compatibility through each phase and Objectivity of decision-making become more important, because relation among stakeholders changes from a rectilinear to a network. However, it is not clear how the risk of completion is reasonably treated. So we have to think about the relations between Owner and CMr, CMr and Specialist Contractor from a point of trade risk. This paper covers them.

  • PDF

커튼월 공사의 착공 전 단계에서 공정 리스크 규명 및 대응방안 (The research and correspondence of schedule risk management at the pre-construction phase of curtain-wall)

  • 정태식;김창덕
    • 한국건설관리학회논문집
    • /
    • 제6권4호
    • /
    • pp.71-79
    • /
    • 2005
  • 건설 프로젝트가 점차 대형화, 전문화, 복잡화되어감에 따라 건설공사에서의 리스크 요인과 불확실성 요인이 증가하고 있다. 따라서 이와 같은 건설 사업 과정에서 발생하는 불확실한 요인을 미리 파악하고, 이에 대처하는 것은 프로젝트 성공을 위해 매우 중요한 요소이다. 따라서 본 연구에서는 전체 공종 중 공기, 공사비, 민원발생 등으로 인해 공사에 크게 영향을 미치며, 후속공정에 미치는 영향이 큰 커튼월 공사를 시공 프로세스 검토를 통한 리스크 인자의 적출을 통해 구체적인 리스크 인자의 구체적인 대응방안을 제시하여 실무에 직접적으로 접근할수 있도록 하였다. 이러한 리스크 인자의 적출은 정량적인 리스크의 분석을 가능하게 하고, 이에 따라 각각의 공종에서 발생하는 리스크 인자들의 우선순위를 결정할 수 있으며 이를 바탕으로 제시한 공정 리스크 관리 도구를 통하여 현장마다 경험과 지식의 정도가 다른 실무자로 하여금 업무를 수행함에 있어서 사전에 리스크를 인지할 수 있으며 리스크가 발생했을 때 신속하게 대응할 수 있고 그러한 리스크를 최소화할 수 있는 업무 지침을 제공하는 역할을 하게 될 것이다.